Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 51–60

  1. Ends · in 56 days

    Provision of Ketone Meters and POCT Strips

    Barnsley Hospital NHS Foundation Trust · Central government

    Incumbent: Nova Biomedical

    Provision of StatStrip Meters and Strips for Ketone testing at Point of Care.

    Published value
    £43k
    Annual run-rate
    £43kpublished value ÷ term, exc. VAT
    Term
    23 Dec 2025 → 22 Dec 2026 · 1 yr
    Reference
    ocds-h6vhtk-06642f
  2. Estimated end · in 58 days

    Diffusion Bonding Furnace

    United Kingdom Atomic Energy Authority · Nationwide (UK), South East England

    Incumbent: HHV Ltd · Last contest: 3 bids (3 SME)

    UKAEA researches fusion energy and related technologies, with the aim of positioning the UK as a leader in sustainable nuclear energy. As part of a renovation and upgrade plan of the Special Techniques Group (STG) capabilities, new diffusio…

    • Industrial or laboratory furnaces, incinerators and ovens
    Published value
    Not published
    Annual run-rate
    —value not published
    Term
    Estimated end 24 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-039b0c
  3. Ends · in 58 days

    Maintenance ramp

    Lancaster City Council · Local authority

    Incumbent: Totalkare

    Procurement of additional workshop maintainence ramp

    Published value
    £82kinc. VAT as published
    Annual run-rate
    £145kpublished value ÷ term, inc. VAT
    Term
    1 Jun 2026 → 24 Dec 2026 · 7 months
    Reference
    ocds-h6vhtk-06a348
  4. Ends · in 62 days

    CSP26807 - Access control on external gates

    UK Research and Innovation · Central government · Nationwide (UK)

    Incumbent: ACCTIVE SYSTEMS LIMITED

    ***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded following a limited competition procurement exercise. Details notice for external gate access control.

    Published value
    £14k
    Annual run-rate
    —term under 6 months
    Term
    11 Sept 2026 → 28 Dec 2026 · 4 months
    Reference
    ocds-h6vhtk-06f796
  5. Ends · in 63 days

    UKRI-6203 - Vacuum valve system for ISIS Riken solenoid

    UK Research and Innovation · Central government · Nationwide (UK)

    Incumbent: VAT Vacuum Products Ltd

    Fast closing vacuum valve system for ISIS Riken solenoid upgrade project

    Published value
    £54k
    Annual run-rate
    £107kpublished value ÷ term, exc. VAT
    Term
    29 Jun 2026 → 29 Dec 2026 · 6 months
    Reference
    ocds-h6vhtk-06c836
  6. Ends · in 65 daysFramework recordPanel · 6 suppliers

    263B_25 Cleaning Decontamination Systems and Services

    ESPO · Nationwide (UK)

    Panel: CK FACILITIES MANAGEMENT LTD, Ecolab Ltd, FINSEN TECHNOLOGIES LIMITED +3 more

    • Decontamination equipment
    Published value
    £20mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-04e27a
  7. Ends · in 65 days

    HVPS D15 Cooling System

    UK Atomic Energy Authority · Other public body · South East England

    Incumbent: Cool-Therm (UK) Limited · Last contest: awarded 30% under the estimate

    UKAEA has a requirement for the design, manufacture, testing, delivery, installation, and commissioning of a new water chiller system to provide primary circuit cooling for the D15 High Voltage Power Supply equipment used on MAST-U.

    Published value
    £104k
    Annual run-rate
    £151kpublished value ÷ term, exc. VAT
    Term
    24 Apr 2026 → 31 Dec 2026 · 8 months
    Reference
    ocds-h6vhtk-05aae1
  8. Ends · in 65 days

    UKRI-6356 STFC Backplate and Spider Mounts

    UK Research and Innovation · Central government · South East England

    Incumbent: Protolabs Europe B.V.

    Mounting components for the HK outer-detector modules

    Published value
    £61k
    Annual run-rate
    —term under 6 months
    Term
    17 Sept 2026 → 31 Dec 2026 · 3 months
    Reference
    ocds-h6vhtk-0779c7
  9. Ends · in 65 days

    Supply of Components for NFRS Safe Working at Height (SWAH) Kit Bag - S513369

    Norfolk County Council · Local authority

    Incumbent: Heightec Group Limited

    All NFRS Appliances carry a safe working at height (SWAH) kit bag. This exemption is to cover replacing key components of those bags as they are reaching end of life. Specifically ropes, harnesses, slings and lanyards.

    Published value
    £55k
    Annual run-rate
    £39kpublished value ÷ term, exc. VAT
    Term
    31 Jul 2025 → 31 Dec 2026 · 1.4 yrs
    Reference
    ocds-h6vhtk-056940
  10. Ends · in 65 days

    Purchase of imperial series screwjack

    Sellafield Limited · Other public body · North West England

    Incumbent: SPEEDY ASSET SERVICES LIMITED

    Purchase of x4 imperial series screwjacks with single face upright rotating screw configuration

    Published value
    £54k
    Annual run-rate
    —term under 6 months
    Term
    21 Sept 2026 → 31 Dec 2026 · 3 months
    Reference
    ocds-h6vhtk-0777a4

When contracts end · Industrial machinery
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

254 contracts and agreements end within 24 months, 406 in total · £22m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months70
  2. 3–6 months56
  3. 6–12 months46
  4. 12–24 months82

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.