  1. Ends · in 103 days

    EV Chargers - Carlton Street Car Park

    North Somerset Council · Local authority · South West England

    Incumbent: Mer Fleet Services Limited

    moving chargers from indoors to outdoors within car park premises

    Published value
    £40k
    Annual run-rate
    £78kpublished value ÷ term, exc. VAT
    Term
    7 Aug 2026 → 7 Feb 2027 · 6 months
    Reference
    ocds-h6vhtk-078302
  2. Ends · in 125 days

    LU Infrastructure Monitoring Technology Solutions Trial

    Transport for London · Other public body · Greater London

    Incumbent: ONE BIG CIRCLE LTD

    LU Infrastructure Monitoring Technology Solutions Trial for installation of Cameras and capture and analysis data for six months

    Published value
    £601k
    Annual run-rate
    —not computed
    Term
    1 Sept 2026 → 1 Mar 2027 · 6 months
    Reference
    ocds-h6vhtk-06ba9b
  3. Ends · in 152 days

    Procurement of Van Refit Services

    Vehicle Certification Agency · Central government · Nationwide (UK)

    Incumbent: MULTI VEHICLE TECHNOLOGY LIMITED

    Provision of van refit services to convert a Renault E-Tech Master 4T van, and adapt the vehicle for use as a track support base station.

    Published value
    £23k
    Annual run-rate
    —not computed
    Term
    28 Sept 2026 → 28 Mar 2027 · 6 months
    Reference
    ocds-h6vhtk-077b8d
  4. Ends · in 154 days

    DTIC201 - UPS purchase and installation. The Forum

    West Northamptonshire Council · Local authority · East Midlands

    Incumbent: Carter Sullivan Limited

    This is a one-time capital purchase and installation of a 50kW Eaton 93PM Uninterruptible Power Supply (UPS) system for the Towcester site. the full supply of equipment, delivery, installation, commissioning,

    Published value
    £40k
    Annual run-rate
    £43kpublished value ÷ term, exc. VAT
    Term
    20 Apr 2026 → 30 Mar 2027 · 11 months
    Reference
    ocds-h6vhtk-0689e9
  5. Ends · in 155 daysFramework recordPanel · 4 suppliers

    Framework Agreement for Datacentre Technologies Supply & Support and Hardware Maintenance

    Flintshire County Council · Local authority · Wales (Cymru)

    Panel: Celerity Limited, Recarta, Service Express +1 more

    • Hardware installation services
    Published value
    £1.5mlargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-0384e5
  6. Ends · in 155 days

    Control Systems OEM -ABB Limited Equipment Service and Maintenance

    Sellafield Limited · Other public body · North West England

    Incumbent: ABB Limited

    The provision of maintenance & technical support of in situ control system equipment used by Sellafield Ltd which have been manufactured and supported by the original equipment manufacturer (OEM) - ABB Limited. The scope includes: on-site s…

    Published value
    £916k
    Annual run-rate
    £916kpublished value ÷ term, exc. VAT
    Term
    1 Apr 2026 → 31 Mar 2027 · 1 yr
    Reference
    ocds-h6vhtk-06689f
  7. Ends · in 155 daysExtension option · up to 31 Mar 2028

    Fire Alarm Maintenance contract

    Stockton on Tees Borough Council · Local authority · North East England

    Incumbent: TEES FIRE SYSTEMS LIMITED

    The Council has a requirement for a supplier to carry out planned preventative and reactive repairs of the Authorities fire alarm systems in council owned buildings as well as maintained schools. The value is approximately £64,000 per year …

    Published value
    £128k
    Annual run-rate
    £128kpublished value ÷ term, exc. VAT
    Term
    1 Apr 2026 → 31 Mar 2027 · 1 yr · up to 31 Mar 2028 with extensions
    Reference
    ocds-h6vhtk-0663b7
  8. Ends · in 155 days

    Great British Energy Award Part 1 Cadw

    Llywodraeth Cymru / Welsh Government · Central government · Wales (Cymru)

    Incumbent: PLUG (EV STATIONS) LIMITED

    Great British Energy Award Part 1 Cadw CADW EV Charging Infrastructure - Crumlin & Caernarfon depots Call off from Lot 2 of WGCD Electric Vehicle Charging Infrastructure Framework

    Published value
    £101k
    Annual run-rate
    £97kpublished value ÷ term, exc. VAT
    Term
    16 Mar 2026 → 31 Mar 2027 · 1.1 yrs
    Reference
    ocds-h6vhtk-06d82a
  9. Ends · in 155 days

    USB Ports On All Firstbus Buses

    Portsmouth City Council · Local authority · South East England

    Incumbent: FIRST HAMPSHIRE & DORSET LIMITED

    The supply and installation of USB charging ports on all buses in the Firstbus fleet

    Published value
    £84kinc. VAT as published
    Annual run-rate
    £80kpublished value ÷ term, inc. VAT
    Term
    13 Mar 2026 → 31 Mar 2027 · 1.1 yrs
    Reference
    ocds-h6vhtk-06762b
  10. Ends · in 155 days

    Litter bin repair and installation

    East Riding of Yorkshire Council · Local authority · Yorkshire and the Humber

    Incumbent: Brooklyn Builders Ltd

    The contract for litter bin installations and repairs across the East Riding

    Published value
    £75kinc. VAT as published
    Annual run-rate
    £38kpublished value ÷ term, inc. VAT
    Term
    1 Apr 2025 → 31 Mar 2027 · 2 yrs
    Reference
    ocds-h6vhtk-0508f1

When contracts end · Installation services (except software)
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

127 contracts and agreements end within 24 months, 198 in total · £18m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months49
  2. 3–6 months21
  3. 6–12 months22
  4. 12–24 months35

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.