Expiring UK Public Contracts: Retender Radar
Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.
Contracts ending in the next 12 months
Page 61 · 100 contracts on this page · more available
- Ends · in 311 daysExtension option · up to 7 Sept 2028
6292 - Day Care Services for Adults with Learning Disabilities at Carlton and Smerdon Day Centres LOT 1
London Borough of Bexley · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Choice Support
The London Borough of Bexley wishes to modernise the opportunities provided through Day Services for adults with learning and associated disabilities. To support this, we are seeking a service provider to manage two existing building-based …
Re-procurement plannedDay Care Services for Adults with Learning Disabilities - Lot 2 Smerdon Day Centre · tender expected
- Published value
- £545k
- Annual run-rate
- £272kpublished value ÷ term, exc. VAT
- Term
- 8 Sept 2025 → 7 Sept 2027 · 2 yrs · up to 7 Sept 2028 with extensions
- Reference
ocds-h6vhtk-058dac
- Ends · in 311 daysExtension option · up to 7 Sept 2029
The Design, Manufacture and Installation of Modular Ramps and Associated Services
Barnsley Metropolitan Borough Council · Local authority · Nationwide (UK), Yorkshire and the Humber
Incumbent: Easibathe Ltd · Last contest: awarded at the estimate
BMBC Administers Disabled Facilities Grant adaptations for Privately Owned, Housing Association or Private Rented properties in Barnsley. The existing framework for design, build and installation of ramps ceased 31st March 2028. The DFG Tea…
- Published value
- £300k
- Annual run-rate
- £300kpublished value ÷ term, exc. VAT
- Term
- 8 Sept 2026 → 7 Sept 2027 · 1 yr · up to 7 Sept 2029 with extensions
- Reference
ocds-h6vhtk-06145f
- Estimated end · in 312 days
Casualty (Combined Liability)
Leicester City Council · Local authority · East Midlands
Incumbent: Risk Management Partners Ltd · Last contest: 2 bids (0 SME)
Leicester City Council proposes to enter into one or more Contracts for a maximum period of 60 months with the successful Supplier(s). The Insurance and Claims Management Services have been divided into the following Lots; 1. Property (incl…
- Published value
- £3.3m
- Annual run-rate
- —start date not published
- Term
- Estimated end 8 Sept 2027 · start not published
- Reference
ocds-h6vhtk-047198
- Estimated end · in 312 daysFramework record
Award Notice for Rail Cutting Framework
NETWORK RAIL INFRASTRUCTURE LIMITED · Other public body · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: Tecforce Limited
- Published value
- £3.0mlargest agreement; total ceiling not published
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 8 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02b21a
- Estimated end · in 312 days
Property (including Computers, Contract Works, Business Interruption, Money and All Risks)
Leicester City Council · Local authority · East Midlands
Incumbent: Risk Management Partners Ltd · Last contest: 4 bids (0 SME)
Leicester City Council proposes to enter into one or more Contracts for a maximum period of 60 months with the successful Supplier(s). The Insurance and Claims Management Services have been divided into the following Lots; 1. Property (incl…
- Published value
- £2.7m
- Annual run-rate
- —start date not published
- Term
- Estimated end 8 Sept 2027 · start not published
- Reference
ocds-h6vhtk-047198
- Estimated end · in 312 days
Liability Claims Administrator
Transport for London · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Gallagher Bassett International Ltd · Last contest: 2 bids
Requirement for a Service Provider for management and handling of liability (motor, employers, public) claims that fall under TfL's General Liability Policy of insurance, as well as uninsured disease claims. Contract awarded for a period of…
- Published value
- £1.8m
- Annual run-rate
- —start date not published
- Term
- Estimated end 8 Sept 2027 · start not published
- Reference
ocds-h6vhtk-040ed8
- Estimated end · in 312 days
Bathroom - East
Accent Group Ltd · Yorkshire and the Humber, East Midlands, East of England, South East England
Incumbent: CLC Contractors Ltd · Last contest: 8 bids (8 SME)
Accent Housing Ltd is seeking a contractor or contractors to deliver Bathroom Replacement Planned Works in the East, South and Yorkshire Regions of its portfolio.The opportunity will be procured as three seperate Lots with no limit being pl…
- Published value
- £1.5m
- Annual run-rate
- —start date not published
- Term
- Estimated end 8 Sept 2027 · start not published
- Reference
ocds-h6vhtk-046f2a
- Estimated end · in 312 days
Bathrooms - South
Accent Group Ltd · Yorkshire and the Humber, East Midlands, East of England, South East England
Incumbent: IAN WILLIAMS · Last contest: 5 bids (3 SME)
Accent Housing Ltd is seeking a contractor or contractors to deliver Bathroom Replacement Planned Works in the East, South and Yorkshire Regions of its portfolio.The opportunity will be procured as three seperate Lots with no limit being pl…
- Published value
- £1.5m
- Annual run-rate
- —start date not published
- Term
- Estimated end 8 Sept 2027 · start not published
- Reference
ocds-h6vhtk-046f2a
- Estimated end · in 312 days
Bathrooms - Yorkshire
Accent Group Ltd · Yorkshire and the Humber, East Midlands, East of England, South East England
Incumbent: IAN WILLIAMS · Last contest: 5 bids (3 SME)
Accent Housing Ltd is seeking a contractor or contractors to deliver Bathroom Replacement Planned Works in the East, South and Yorkshire Regions of its portfolio.The opportunity will be procured as three seperate Lots with no limit being pl…
- Published value
- £1.5m
- Annual run-rate
- —start date not published
- Term
- Estimated end 8 Sept 2027 · start not published
- Reference
ocds-h6vhtk-046f2a
- Estimated end · in 312 days
General Motor Fleet
Leicester City Council · Local authority · East Midlands
Incumbent: Risk Management Partners Ltd · Last contest: 2 bids (0 SME)
Leicester City Council proposes to enter into one or more Contracts for a maximum period of 60 months with the successful Supplier(s). The Insurance and Claims Management Services have been divided into the following Lots; 1. Property (incl…
- Published value
- £1.2m
- Annual run-rate
- —start date not published
- Term
- Estimated end 8 Sept 2027 · start not published
- Reference
ocds-h6vhtk-047198
- Estimated end · in 312 days
Engineering & Inspection
Leicester City Council · Local authority · East Midlands
Incumbent: Risk Management Partners Ltd · Last contest: 2 bids (0 SME)
Leicester City Council proposes to enter into one or more Contracts for a maximum period of 60 months with the successful Supplier(s). The Insurance and Claims Management Services have been divided into the following Lots; 1. Property (incl…
- Published value
- £831k
- Annual run-rate
- —start date not published
- Term
- Estimated end 8 Sept 2027 · start not published
- Reference
ocds-h6vhtk-047198
- Estimated end · in 312 daysCall-offPanel · 4 suppliers
FMM-22-013 Supply and Delivery of Grounds Maintenance Products for the Education Authority
the Education Authority · Education · Nationwide (UK), Northern Ireland
Panel: Fiddes and Son Ltd T/A Bowcom, Lindsay Turfcare, Nomix Enviro Ltd +1 more · Last contest: 6 bids (6 SME)
Framework for the Supply and Delivery of Grounds Maintenance Products to the Education Authority
- Published value
- £750kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 8 Sept 2027 · start not published
- Reference
ocds-h6vhtk-03d0ae
- Estimated end · in 312 days
Industrial and Commercial Properties
Leicester City Council · Local authority · East Midlands
Incumbent: Risk Management Partners Ltd · Last contest: 4 bids (0 SME)
Leicester City Council proposes to enter into one or more Contracts for a maximum period of 60 months with the successful Supplier(s). The Insurance and Claims Management Services have been divided into the following Lots; 1. Property (incl…
- Published value
- £672k
- Annual run-rate
- —start date not published
- Term
- Estimated end 8 Sept 2027 · start not published
- Reference
ocds-h6vhtk-047198
- Estimated end · in 312 daysFramework recordPanel · 4 suppliers
FMM-22-013 The Establishment of a Framework Agreement for the Supply and Delivery of Grounds Maintenance Products for the Education Authority
Education Authority NI · Education · Nationwide (UK), Northern Ireland
Panel: Fiddes and Son Ltd T/A Bowcom, John Lindsay Professional Sportsturf, Nomix Enviro Ltd +1 more
- Published value
- £500kpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 8 Sept 2027 · start not published
- Reference
ocds-h6vhtk-03d0ae
- Estimated end · in 312 daysCall-offPanel · 4 suppliers
FMM-22-013 Supply and Delivery of Grounds Maintenance Products for the Education Authority
the Education Authority · Education · Nationwide (UK), Northern Ireland
Panel: Fiddes and Son Ltd T/A Bowcom, Lindsay Turfcare, Nomix Enviro Ltd +1 more · Last contest: 6 bids (6 SME)
- Published value
- £500kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 8 Sept 2027 · start not published
- Reference
ocds-h6vhtk-03d0ae
- Estimated end · in 312 days
Fine Art & Museums
Leicester City Council · Local authority · East Midlands
Incumbent: Arthur J Gallagher Nordic AB · Last contest: 1 bid (0 SME)
Leicester City Council proposes to enter into one or more Contracts for a maximum period of 60 months with the successful Supplier(s). The Insurance and Claims Management Services have been divided into the following Lots; 1. Property (incl…
- Published value
- £352k
- Annual run-rate
- —start date not published
- Term
- Estimated end 8 Sept 2027 · start not published
- Reference
ocds-h6vhtk-047198
- Estimated end · in 312 days
Personal Accident and Travel
Leicester City Council · Local authority · East Midlands
Incumbent: Risk Management Partners Ltd · Last contest: 2 bids (0 SME)
Leicester City Council proposes to enter into one or more Contracts for a maximum period of 60 months with the successful Supplier(s). The Insurance and Claims Management Services have been divided into the following Lots; 1. Property (incl…
- Published value
- £55k
- Annual run-rate
- —start date not published
- Term
- Estimated end 8 Sept 2027 · start not published
- Reference
ocds-h6vhtk-047198
- Ends · in 312 days
Clinical Evaluations
Secretary of State for Health and Social Care acting as part of the Crown through UK Health Security Agency · NHS & health · Nationwide (UK)
Incumbent: Mac Clinical Research Finance Ltd · Last contest: 3 bids · awarded at the estimate
Management of Clinical evaluations, including evaluation initiation, delivery, site and data management, monitoring and analysis report writing, in order to support UKHSA's testing capabilities.<br/><br/>The maximum value of the contract wi…
- Published value
- £9.5m
- Annual run-rate
- —start date not published
- Term
- Ends 8 Sept 2027 · start not published
- Reference
ocds-h6vhtk-04362d
- Ends · in 312 daysFramework record
For the Provision of an Extra Care Framework
Derby City Council · Local authority · East Midlands
Incumbent: Profad Care Agency Limited
- Published value
- £9.4mpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Ends 8 Sept 2027 · start not published
- Reference
ocds-h6vhtk-044a31
- Ends · in 312 daysExtension option · up to 8 Sept 2029
National Lottery Open Week
Big Lottery Fund, operating as The National Lottery Community Fund · Other public body · Nationwide (UK)
Incumbent: JOHN DOE GROUP LIMITED · Last contest: awarded at the estimate
Provision of PR services to deliver the National Lottery Open Week (NLOW) campaign.
- Published value
- £624k
- Annual run-rate
- £625kpublished value ÷ term, exc. VAT
- Term
- 9 Sept 2026 → 8 Sept 2027 · 1 yr · up to 8 Sept 2029 with extensions
- Reference
ocds-h6vhtk-06c8bc
- Ends · in 312 days
Web Development & Hosting
Thirteen Housing Group Limited · Housing · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Spindogs
Website development: Spindogs designs, builds, and supports websites, focusing on user experience and accessibility.
- Published value
- £98k
- Annual run-rate
- £49kpublished value ÷ term, exc. VAT
- Term
- 9 Sept 2025 → 8 Sept 2027 · 2 yrs
- Reference
ocds-h6vhtk-05cced
- Estimated end · in 313 daysCall-off
Facilities Management Services
Rail Safety Standards Board (RSSB) · Nationwide (UK), Greater London, Wales (Cymru)
Incumbent: ISS Facility Services Limited · Last contest: 1 bid (1 SME)
- Published value
- £366kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 9 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02cc0f
- Estimated end · in 313 days
The Provision Of Water And Waste Water Retailer Services Across England And Scotland For The Subsidiaries Of FirstGroup
FIRSTGROUP HOLDINGS LIMITED · Nationwide (UK)
Incumbent: Water Plus Limited · Last contest: 2 bids (0 SME)
The Client requires a contract for water and waste-water retail services across the FirstGroup estate (~400 locations within England and Scotland which consume ~850,000m3 per annum). The contract will run for a 4 year term with a further op…
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Estimated end 9 Sept 2027 · start not published
- Reference
ocds-h6vhtk-0391ef
- Ends · in 313 days
Provision of standalone processing server and AI server for MPS Digital Forensic Services
Mayor's Office for Policing and Crime · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: XMA Limited
This framework award under the Technology Products & Associated Services 2 framework (RM6098) covered the provision of two non-networked server items for the Metropolitan Digital Forensic Services department based at Lambeth, London.
- Published value
- £54k
- Annual run-rate
- £54kpublished value ÷ term, exc. VAT
- Term
- 10 Sept 2026 → 9 Sept 2027 · 1 yr
- Reference
ocds-h6vhtk-077afa
- Ends · in 313 days
846-NYC-HA Staff Flu Vaccinations
The North Yorkshire Council · Local authority · Nationwide (UK), Yorkshire and the Humber
Incumbent: Vaccination UK Limited. · Last contest: 3 bids · awarded at the estimate
- Published value
- £45k
- Annual run-rate
- —start date not published
- Term
- Ends 9 Sept 2027 · start not published
- Reference
ocds-h6vhtk-06d76a
- Ends · in 313 days
Matrix Room and Desk Booking System Renewal
GENOMICS ENGLAND LIMITED · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Matrix Booking Limited
Purchase of the Matrix room and desk booking system for 26-27
- Published value
- £19k
- Annual run-rate
- £19kpublished value ÷ term, exc. VAT
- Term
- 10 Sept 2026 → 9 Sept 2027 · 1 yr
- Reference
ocds-h6vhtk-06bc66
- Estimated end · in 314 daysFramework record
LUF Bulwell Town Centre Scheme
Nottingham City Council · Local authority · East Midlands
Incumbent: WILLMOTT DIXON LIMITED
Nottingham City Council has awarded a call-off contract for the delivery of LUF Bulwell Town Centre Scheme under the SCAPE National Construction Framework. The contract includes pre-construction services, CDP development, construction works…
- Published value
- £16mlargest agreement; total ceiling not published
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 10 Sept 2027 · start not published
- Reference
ocds-h6vhtk-0781ca
- Estimated end · in 314 daysCall-off
TPPL Aberdeen City Council - Highland Council DPS Category - TECA Hydrogen Manufacturing Site and King Street Refuelling Site (12793)
Aberdeen City Council · Local authority · Nationwide (UK), Yorkshire and the Humber, East Midlands, East of England, South East England, South West England
Incumbent: Logan Energy Ltd · Last contest: 4 bids (0 SME)
- Published value
- £2.6mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 10 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02de73
- Estimated end · in 314 daysCall-off
Design, Supply and Install Diesel Engines Lerwick Power Station
SCOTTISH HYDRO ELECTRIC POWER DISTRIBUTION PLC · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent not published · Last contest: 6 bids (2 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 10 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02874c
- Estimated end · in 314 daysCall-off
Electricity Supply
Barnsley Metropolitan Borough Council · Local authority · Nationwide (UK), Yorkshire and the Humber, South East England
Incumbent: EDF Energy Customers Limited · Last contest: 2 bids (1 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 10 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02af3f
- Estimated end · in 314 days
Non-Obstetric Ultrasound (NOUS) Any Qualified Provider (AQP) for Nottinghamshire
NHS Nottingham & Nottinghamshire ICB · NHS & health · East Midlands
Incumbent: MEDISERVICES HEALTHCARE LTD · Last contest: 7 bids
NHS Nottingham & Nottingham ICB are seeking suitably qualified organisations under an AQP (Any Qualified Provider) arrangement to provide a local, direct access non-obstetric ultrasound service with staff qualified to appropriate levels of …
- Published value
- £1
- Annual run-rate
- —start date not published
- Term
- Estimated end 10 Sept 2027 · start not published
- Reference
ocds-h6vhtk-0313a9
- Ends · in 314 daysExtension option · up to 10 Sept 2029Panel · 8 suppliers
Lot 1 - Academic Support
Leicestershire County Council · Local authority · East Midlands
Panel: Aspire and Thrive, Bangladesh Youth and Cultural Shomiti, Lets Make Change +5 more
- Published value
- £60k
- Annual run-rate
- —panel, not one supplier
- Term
- 11 Sept 2025 → 10 Sept 2027 · 2 yrs · up to 10 Sept 2029 with extensions
- Reference
ocds-h6vhtk-055fdb
- Ends · in 314 daysExtension option · up to 10 Sept 2029Panel · 11 suppliers
Lot 2. Therapeutic support and cultural activities
Leicestershire County Council · Local authority · East Midlands
Panel: Aspire and Thrive, CHARNWOOD 20:20, Lets Make Change +8 more
- Published value
- £60k
- Annual run-rate
- —panel, not one supplier
- Term
- 11 Sept 2025 → 10 Sept 2027 · 2 yrs · up to 10 Sept 2029 with extensions
- Reference
ocds-h6vhtk-055fdb
- Ends · in 314 days
Externally funded Drawing of Henry Ulusiboo
Bristol City Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: BEN ELWES LIMITED
Purchase a piece of art - Drawing of Henry Ulusiboo
- Published value
- £40k
- Annual run-rate
- £40kpublished value ÷ term, exc. VAT
- Term
- 11 Sept 2026 → 10 Sept 2027 · 1 yr
- Reference
ocds-h6vhtk-06f91c
- Ends · in 314 days
PS26286
UK Research and Innovation · Central government · Nationwide (UK)
Incumbent: Doyle Clayton Solicitors Limited
- Published value
- £40k
- Annual run-rate
- £40kpublished value ÷ term, exc. VAT
- Term
- 10 Sept 2026 → 10 Sept 2027 · 1 yr
- Reference
ocds-h6vhtk-07740a
- Ends · in 314 days
DDaT26438 - License and Support
UK Research and Innovation · Central government · Nationwide (UK)
Incumbent: Logicalis UK Limited
***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded without competition due to an absence of competition for technical reasons, only a particular supplier can supply the goods, servi…
- Published value
- £16k
- Annual run-rate
- £14kpublished value ÷ term, exc. VAT
- Term
- 13 Aug 2026 → 10 Sept 2027 · 1.1 yrs
- Reference
ocds-h6vhtk-06e49f
- Estimated end · in 315 daysFramework recordPanel · 23 suppliers
Vascular Therapy and Associated Products
NHS Supply Chain · NHS & health · Nationwide (UK)
Panel: Arjo UK Ltd, Cardinal Health UK 432 Limited, Daylong Direct +20 more
- Published value
- £60mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 11 Sept 2027 · start not published
- Reference
ocds-h6vhtk-03c513
- Estimated end · in 315 days
Website Design and Build
SOAS University of London · Education · Nationwide (UK)
Incumbent: Numiko Ltd · Last contest: 7 bids (7 SME) · awarded 8% under the estimate
SOAS University of London is out to tender for:a) The provisiion of web design services to simplify the customer journey, make the user experience the heart of the new design and maximise student recruitment opportunities orb) The provision…
- Published value
- £459k
- Annual run-rate
- —start date not published
- Term
- Estimated end 11 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02b6f3
- Estimated end · in 315 days
The Provision of Research into Fire Safety Access and Facilities in Buildings
Health and Safety Executive · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Bureau Veritas · Last contest: 2 bids · awarded 13% under the estimate
The Health and Safety Executive (HSE) is a Crown non-departmental public body with specific statutory functions in relation to health and safety. It is appointed by the Secretary of State for Work and Pensions and employs around 3,500 staff…
- Published value
- £131k
- Annual run-rate
- —start date not published
- Term
- Estimated end 11 Sept 2027 · start not published
- Reference
ocds-h6vhtk-04e687
- Ends · in 316 days
Cito Core Electronic Document Management Solution (EDMS)
Medway NHS Foundation Trust · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: CIVICA UK LIMITED
The re-licence and continuation of the on-premise Cito Core Electronic Document Management Solution (EDMS) plus the extraction tool and services required to export the system documents to the Trust including agreed metadata
- Published value
- £200k
- Annual run-rate
- £200kpublished value ÷ term, exc. VAT
- Term
- 13 Sept 2026 → 12 Sept 2027 · 1 yr
- Reference
ocds-h6vhtk-06f66e
- Ends · in 316 days
Maintenance Agreement
University Hospitals of Derby and Burton NHS Foundation Trust · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Agfa HealthCare UK Limited
COVER - Platinum Full Critical Priority Response - 6 hour - for DR 600 Fully Automatic (Room 2). Period 13.09.2026 - 12.09.2027 located at Florence Nightingale Community Hospital.
- Published value
- £20k
- Annual run-rate
- £20kpublished value ÷ term, exc. VAT
- Term
- 13 Sept 2026 → 12 Sept 2027 · 1 yr
- Reference
ocds-h6vhtk-06c63d
- Estimated end · in 317 daysCall-off
Specialist Track Labour Framework
Transport for London · Other public body · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: CLESHAR CONTRACT SERVICES LIMITED · Last contest: 6 bids (2 SME)
This is a framework agreement with three suppliers to provide specialist labour for the delivery of track maintenance for London Underground. The framework is tendered as lot 1b under the Track Works and Resources procurement. The supply of…
- Published value
- £83mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 13 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02b21a
- Estimated end · in 317 daysCall-off
Specialist Track Labour Framework
Transport for London · Other public body · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: Morson Human Resources Limited (t/a Morson Talent) · Last contest: 6 bids (2 SME)
This is a framework agreement with three suppliers to provide specialist labour for the delivery of track maintenance for London Underground. The framework is tendered as lot 1b under the Track Works and Resources procurement. The supply of…
- Published value
- £83mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 13 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02b21a
- Estimated end · in 317 daysCall-off
Specialist Track Labour Framework
Transport for London · Other public body · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: 1stinrail Limited · Last contest: 6 bids (2 SME)
This is a framework agreement with three suppliers to provide specialist labour for the delivery of track maintenance for London Underground. The framework is tendered as lot 1b under the Track Works and Resources procurement. The supply of…
- Published value
- £83mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 13 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02b21a
- Estimated end · in 317 daysCall-off
General Track Labour Framework
Transport for London · Other public body · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: CLESHAR CONTRACT SERVICES LIMITED · Last contest: 6 bids (2 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 13 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02b21a
- Estimated end · in 317 daysCall-off
General Track Labour Framework
Transport for London · Other public body · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: Morson Human Resources Limited (t/a Morson Talent) · Last contest: 6 bids (2 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 13 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02b21a
- Estimated end · in 317 daysCall-off
General Track Labour Framework
Transport for London · Other public body · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: 1stinrail Limited · Last contest: 6 bids (2 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 13 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02b21a
- Ends · in 317 days
TCMS 3rd Party Checker
National Highways Limited · Central government · Nationwide (UK)
Incumbent: Atkins Limited
National Highways is in the process of delivering the new Tunnel Control and Management System (TCMS) for the first phase of the systems deployment at Hindhead Tunnel. Hindhead is the first tunnel from National Highways portfolio of 11 tunn…
- Published value
- £553k
- Annual run-rate
- £555kpublished value ÷ term, exc. VAT
- Term
- 15 Sept 2026 → 13 Sept 2027 · 1 yr
- Reference
ocds-h6vhtk-06e5c8
- Ends · in 317 days
Clent Way Roof Replacement 2026
Greensquareaccord · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: J.HARPER & SONS(LEOMINSTER)LIMITED · Last contest: awarded 51% under the estimate
Roofing works including asbestos removal and full roof replacement to three blocks where damage has been identified at Clent Way, Birmingham.
- Published value
- £306k
- Annual run-rate
- £306kpublished value ÷ term, exc. VAT
- Term
- 14 Sept 2026 → 13 Sept 2027 · 1 yr
- Reference
ocds-h6vhtk-069d8e
- Ends · in 317 daysExtension option · up to 13 Sept 2028
North Northamptonshire Council - Customer Relationship Management Solution
North Northamptonshire Council · Local authority · East Midlands
Incumbent: Placecube Limited
North Northamptonshire Council (hereafter referred to as the "Council") are extending their current provision with Placecube Limited for a Customer Relationship Management solution for the Council's customised applications.
- Published value
- £200k
- Annual run-rate
- £200kpublished value ÷ term, exc. VAT
- Term
- 14 Sept 2026 → 13 Sept 2027 · 1 yr · up to 13 Sept 2028 with extensions
- Reference
ocds-h6vhtk-068439
- Ends · in 317 daysExtension option · up to 13 Sept 2028
PB0098 - Cygnet Square
Peabody Trust · Other public body · Nationwide (UK)
Incumbent: 2inspire Academy CIC
We are seeking an experienced event and activation partner to curate, manage, and deliver a programme of monthly activation events for Cygnet Square, a newly developed square in Peabody’s Southmere development in Thamesmead.
- Published value
- £58k
- Annual run-rate
- £58kpublished value ÷ term, exc. VAT
- Term
- 14 Sept 2026 → 13 Sept 2027 · 1 yr · up to 13 Sept 2028 with extensions
- Reference
ocds-h6vhtk-078f37
- Ends · in 317 days
Carpark Line Marking
North East London NHS Foundation Trust · Central government · Nationwide (UK)
Incumbent: James Roofing & Construction Ltd
Carpark Line Marking renewal for Goodmayes
- Published value
- £17k
- Annual run-rate
- £17kpublished value ÷ term, exc. VAT
- Term
- 14 Sept 2026 → 13 Sept 2027 · 1 yr
- Reference
ocds-h6vhtk-077510
- Ends · in 317 days
Office Chairs
North East London NHS Foundation Trust · Central government · Nationwide (UK)
Incumbent: BRIDON HEALTHCARE FURNITURE LIMITED
Bulk order of office chairs
- Published value
- £15k
- Annual run-rate
- £15kpublished value ÷ term, exc. VAT
- Term
- 14 Sept 2026 → 13 Sept 2027 · 1 yr
- Reference
ocds-h6vhtk-07750a
- Ends · in 317 days
IET membership renewal
Met Office · Central government · Nationwide (UK)
Incumbent: The Institution of Engineering and Technology
26-27 Renewal of IET memberships
- Published value
- £14k
- Annual run-rate
- £14kpublished value ÷ term, exc. VAT
- Term
- 14 Sept 2026 → 13 Sept 2027 · 1 yr
- Reference
ocds-h6vhtk-06f1c0
- Estimated end · in 318 days
Energy Broker Services
LONDON & QUADRANT HOUSING TRUST · Housing · Nationwide (UK)
Incumbent: E Energy · Last contest: 7 bids (0 SME)
London and Quadrant seeks to appoint a supplier who can provide Energy Broker and consultancy services with the intent to procure and manage electricity and gas supply contracts for the consolidated LQHT group to commence services from Apri…
- Published value
- £445k
- Annual run-rate
- —start date not published
- Term
- Estimated end 14 Sept 2027 · start not published
- Reference
ocds-h6vhtk-041aa1
- Estimated end · in 318 daysCall-off
LC692 Building Cleaning Services
Leeds Beckett University · Education · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: Bulloughs Cleaning Services Ltd · Last contest: 28 bids (0 SME)
Building Cleaning Services - CPC/MK/02/2020 Framework Agreement - LOT 14
- Published value
- £200kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 14 Sept 2027 · start not published
- Reference
ocds-h6vhtk-03987b
- Estimated end · in 318 days
Supported Living
The North Yorkshire Council · Local authority · Nationwide (UK), Yorkshire and the Humber
Incumbent: Ascot Care Agency Ltd · Last contest: 821 bids
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Estimated end 14 Sept 2027 · start not published
- Reference
ocds-h6vhtk-0344dd
- Estimated end · in 318 days
Home Based Support
The North Yorkshire Council · Local authority · Nationwide (UK), Yorkshire and the Humber
Incumbent: Ascot Care Agency Ltd · Last contest: 821 bids
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Estimated end 14 Sept 2027 · start not published
- Reference
ocds-h6vhtk-0344dd
- Ends · in 318 daysExtension option · up to 14 Sept 2029
External Surveyor for Disrepair 2026
Greensquareaccord · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Grove West Property Consultants LTD · Last contest: awarded at the estimate
To provide surveying services for claims of disrepair.
- Published value
- £360k
- Annual run-rate
- £360kpublished value ÷ term, exc. VAT
- Term
- 15 Sept 2026 → 14 Sept 2027 · 1 yr · up to 14 Sept 2029 with extensions
- Reference
ocds-h6vhtk-05822f
- Ends · in 318 days
E-7 Wedgetail AEW Mk 1 Jeppesen and ForeFlight Services
Defence Equipment and Support · Central government · Nationwide (UK)
Incumbent: Jeppesen UK Limited
The procurement of Jeppesen and ForeFlight Services to support the E-7 Wedgetail AEW Mk 1.
- Published value
- £270k
- Annual run-rate
- £269kpublished value ÷ term, exc. VAT
- Term
- 14 Sept 2026 → 14 Sept 2027 · 1 yr
- Reference
ocds-h6vhtk-07748c
- Ends · in 318 daysExtension option · up to 14 Sept 2029
Service and Maintenance of Gym Equipment
South Wales Fire and Rescue Service · Police & fire · Nationwide (UK), Wales (Cymru)
Incumbent: Balance Leisure Fitness Ltd · Last contest: awarded 9% over the estimate
The Service and Maintenance of Gym Equipment
- Published value
- £100k
- Annual run-rate
- £50kpublished value ÷ term, exc. VAT
- Term
- 15 Sept 2025 → 14 Sept 2027 · 2 yrs · up to 14 Sept 2029 with extensions
- Reference
ocds-h6vhtk-05231f
- Ends · in 318 daysExtension option · up to 14 Sept 2028
MRA InSAR Operational Provisional
Mining Remediation Authority · Central government · Nationwide (UK)
Incumbent: SATSENSE LIMITED
The Mining Remediation Authority requires a supplier who can provide InSAR satellite information via an API for 12 months in support of our statutory obligations to protect public safety.
- Published value
- £75k
- Annual run-rate
- £75kpublished value ÷ term, exc. VAT
- Term
- 15 Sept 2026 → 14 Sept 2027 · 1 yr · up to 14 Sept 2028 with extensions
- Reference
ocds-h6vhtk-06faa6
- Ends · in 318 days
Custody Image Solution
The Police and Crime Commissioner for Northumbria · Police & fire · Nationwide (UK)
Incumbent: PROMAT I.D. LIMITED
Provision of digital custody image solution to support Northumbria Police custody service.
- Published value
- £60k
- Annual run-rate
- £60kpublished value ÷ term, exc. VAT
- Term
- 15 Sept 2026 → 14 Sept 2027 · 1 yr
- Reference
ocds-h6vhtk-06f89e
- Estimated end · in 319 daysFramework recordPanel · 28 suppliers
Pulse Oximetry, Capnography and Related Patient Monitoring Technologies
NHS Supply Chain Operated by DHL Supply Chain Limited acting as agent of Supply Chain Coordination Ltd (SCCL) · NHS & health · Nationwide (UK)
Panel: Albert Waeschle Limited, Drive DeVilbiss Healthcare Limited, GE Medical Systems Ltd +25 more
- Published value
- £145mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 15 Sept 2027 · start not published
- Reference
ocds-h6vhtk-036a75
- Estimated end · in 319 days
Operational Insurance Broker
CADENT GAS LIMITED · Nationwide (UK)
Incumbent: Aon Limited · Last contest: 4 bids
Cadent has a requirement for the provision of insurance brokerage services for operational policies.
- Published value
- £50m
- Annual run-rate
- —start date not published
- Term
- Estimated end 15 Sept 2027 · start not published
- Reference
ocds-h6vhtk-045806
- Estimated end · in 319 daysFramework record
Supply and Maintenance of Whole Blood, Platelet & Plasma Transport Containers
NHS Blood and Transplant · NHS & health · Nationwide (UK)
Incumbent: Polar Thermal Packaging
- Published value
- £2.0mpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 15 Sept 2027 · start not published
- Reference
ocds-h6vhtk-03f54b
- Estimated end · in 319 daysCall-off
Charging Point Installation (TPPL Call Off)
The Highland Council · Local authority · Nationwide (UK), Yorkshire and the Humber, East Midlands, East of England, South East England, South West England
Incumbent: Swarco UK Ltd · Last contest: 4 bids (0 SME)
- Published value
- £175kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 15 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02de73
- Estimated end · in 319 daysCall-off
FW Repair & Maintain - 11kV Switchgear and Automation - Multi Site 0926
SOUTHERN ELECTRIC POWER DISTRIBUTION PLC · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: Lucy Electric UK Ltd · Last contest: 21 bids (6 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 15 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02874b
- Estimated end · in 319 daysCall-off
Media Monitoring & Reputational Analysis Services
UK POWER NETWORKS (OPERATIONS) LIMITED · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent not published · Last contest: 21 bids (6 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 15 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02874b
- Estimated end · in 319 daysCall-off
Talent Sourcing Software as a Solution (SaaS)
NATIONAL GRID UK LIMITED · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent not published · Last contest: 6 bids (2 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 15 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02874c
- Ends · in 319 daysExtension option · up to 14 Jun 2030
Media Buying Services contract
Secretary of State for Health and Social Care acting as part of the Crown through UK Health Security Agency · Central government · Nationwide (UK)
Incumbent: Wavemaker Ltd
Call-off contract awarded to Wavemaker Limited t/a WPP650 under Lot 1 (Media Strategy, Planning and Buying) of the Government Communications Agency (GCA) Media and Creative Services Framework RM6364. The contract provides media planning, me…
- Published value
- £333k
- Annual run-rate
- £338kpublished value ÷ term, exc. VAT
- Term
- 21 Sept 2026 → 15 Sept 2027 · 1 yr · up to 14 Jun 2030 with extensions
- Reference
ocds-h6vhtk-06f1b5
- Ends · in 319 days
HALO ITSM
London Borough of Haringey · Local authority · Nationwide (UK)
Incumbent: Halo Service Solutions Ltd
HALO ITSM is a business-critical system that supports essential Council operations and enables efficient service management across key areas. It is used by multiple departments and has been extensively tailored through bespoke workflows.
- Published value
- £134k
- Annual run-rate
- £104kpublished value ÷ term, exc. VAT
- Term
- 2 Jun 2026 → 15 Sept 2027 · 1.3 yrs
- Reference
ocds-h6vhtk-06dc4e
- Ends · in 319 days
Tenancy Relations Pilot Project Evaluation
Greater Manchester Combined Authority · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: MEL Research Ltd
An evaluation of a pilot project to reduce the instances of harassment and illegal eviction in three GM local authority areas
- Published value
- £40k
- Annual run-rate
- £20kpublished value ÷ term, exc. VAT
- Term
- 15 Sept 2025 → 15 Sept 2027 · 2 yrs
- Reference
ocds-h6vhtk-05dca8
- Ends · in 319 days
Domestic Abuse Training
Crown Prosecution Service · Central government · Nationwide (UK)
Incumbent: Safelives
For the procurement of the provision of Domestic Abuse Training sessions.
- Published value
- £35k
- Annual run-rate
- £35kpublished value ÷ term, exc. VAT
- Term
- 15 Sept 2026 → 15 Sept 2027 · 1 yr
- Reference
ocds-h6vhtk-07936d
- Estimated end · in 320 daysFramework recordPanel · 17 suppliers
Audio Visual: System Design/Consultancy, Supplies, Installation and Maintenance
NEUPC Ltd · Nationwide (UK)
Panel: ANJELI LIMITED, AURA FUTURES LIMITED, AV2000 Limited +14 more
- Published value
- £450mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 16 Sept 2027 · start not published
- Reference
ocds-h6vhtk-044ad0
- Estimated end · in 320 days
Employee Assistance Programme, Occupational Health and Health Surveillance
Home Group · Nationwide (UK)
Incumbent: Newcastle Premier Health Limited · Last contest: 10 bids
Employee Assistance Programme, Occupational Health and Health Surveillance.
- Published value
- £400k
- Annual run-rate
- —start date not published
- Term
- Estimated end 16 Sept 2027 · start not published
- Reference
ocds-h6vhtk-0458b2
- Estimated end · in 320 days
VisitScotland Global Strategic Communications and Media
VisitScotland · Nationwide (UK)
Incumbent: Davies Tanner Marketing Services Ltd · Last contest: 4 bids (0 SME)
A supplier is required to lead VisitScotland Business Events’ global strategic communications, positioning Scotland as a worldclass, policy aligned business events destination. It is needed to amplify the work of the BE team to manage an in…
- Published value
- £348k
- Annual run-rate
- —start date not published
- Term
- Estimated end 16 Sept 2027 · start not published
- Reference
ocds-h6vhtk-06c078
- Estimated end · in 320 daysCall-off
FW Services – Drainage Inspections & Repairs - Multi Site 0329
SSE PLC · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: DENHOLM ENVIRONMENTAL LIMITED · Last contest: 21 bids (6 SME)
- Published value
- £138kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 16 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02874b
- Estimated end · in 320 daysCall-off
Provision of Driver Training
Northern Powergrid Limited · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent not published · Last contest: 6 bids (2 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 16 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02874c
- Estimated end · in 320 daysCall-off
Supply & Installation - 132kV Cable Systems
SOUTHERN ELECTRIC POWER DISTRIBUTION PLC · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent not published · Last contest: 6 bids (2 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 16 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02874c
- Estimated end · in 320 daysCall-off
Supply & Installation - 132kV Cable Systems
SOUTHERN ELECTRIC POWER DISTRIBUTION PLC · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent not published · Last contest: 6 bids (2 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 16 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02874c
- Estimated end · in 320 daysCall-off
Supply & Installation - 132kV Cable Systems
SOUTHERN ELECTRIC POWER DISTRIBUTION PLC · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent not published · Last contest: 6 bids (2 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 16 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02874c
- Estimated end · in 320 daysCall-off
Supply & Installation - 132kV Cable Systems
SOUTHERN ELECTRIC POWER DISTRIBUTION PLC · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent not published · Last contest: 6 bids (2 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 16 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02874c
- Estimated end · in 320 daysCall-off
Supply & Installation - 132kV Cable Systems
SOUTHERN ELECTRIC POWER DISTRIBUTION PLC · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent not published · Last contest: 6 bids (2 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 16 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02874c
- Estimated end · in 320 daysCall-off
Supply & Installation - 132kV Cable Systems
SOUTHERN ELECTRIC POWER DISTRIBUTION PLC · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent not published · Last contest: 6 bids (2 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 16 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02874c
- Estimated end · in 320 daysCall-off
Supply & Installation - 132kV Cable Systems
SOUTHERN ELECTRIC POWER DISTRIBUTION PLC · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent not published · Last contest: 6 bids (2 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 16 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02874c
- Estimated end · in 320 days
RES/RES Delivery of Bristol Harbour Festival 2024-27 / (29)
Bristol City Council · Local authority · Nationwide (UK)
Incumbent: Proud Events Limited · Last contest: 4 bids (4 SME)
RES/RES Delivery of Bristol Harbour Festival 2024-27 / (29)
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Estimated end 16 Sept 2027 · start not published
- Reference
ocds-h6vhtk-03eac1
- Ends · in 320 daysExtension option · up to 16 Sept 2028
Digital Delivery Partner
HM Revenue & Customs · Central government · Nationwide (UK)
Incumbent: Public Digital · Last contest: awarded at the estimate
To keep pace with evolving customer, societal and economic expectations, manage the growing tax gap, and modernise its workforce and technology to be future fit and continuously improve, HMRC must execute an ambitious transformation agenda.…
- Published value
- £14m
- Annual run-rate
- £7.0mpublished value ÷ term, exc. VAT
- Term
- 17 Sept 2025 → 16 Sept 2027 · 2 yrs · up to 16 Sept 2028 with extensions
- Reference
ocds-h6vhtk-0502e0
- Ends · in 320 daysExtension option · up to 16 Sept 2029
NLPU Cross Distributor Campaign
Big Lottery Fund, operating as The National Lottery Community Fund · Other public body · Nationwide (UK)
Incumbent: GOLIN LIMITED t/a Golin Ketchum · Last contest: awarded at the estimate
PR support services contract as part of the National Lottery Promotions Unit (NLPU) Cross Distributor Campaign. The public relations agency will design, develop, and deliver a high-impact, consumer-facing PR campaign at the latter end of 20…
- Published value
- £2.1m
- Annual run-rate
- £2.2mpublished value ÷ term, exc. VAT
- Term
- 30 Sept 2026 → 16 Sept 2027 · 1 yr · up to 16 Sept 2029 with extensions
- Reference
ocds-h6vhtk-06b61d
- Ends · in 320 days
Fire Risk Assessments External Walls
Salix Homes Limited · Charity · Nationwide (UK)
Incumbent: MJM FIRE CONSULTANTS LIMITED
Fire Risk Assessments External Walls for Salix Homes
- Published value
- £124k
- Annual run-rate
- £124kpublished value ÷ term, exc. VAT
- Term
- 17 Sept 2026 → 16 Sept 2027 · 1 yr
- Reference
ocds-h6vhtk-0787ab
- Ends · in 320 days
DDaT26461 - Filming Equipment
UK Research and Innovation · Central government · Nationwide (UK)
Incumbent: WAREHOUSE EXPRESS LIMITED T/A WEX Photo Video
***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded following a limited competition procurement exercise. UK Research and Innovation (UKRI) had a requirement for a range of filming e…
- Published value
- £38k
- Annual run-rate
- £38kpublished value ÷ term, exc. VAT
- Term
- 17 Sept 2026 → 16 Sept 2027 · 1 yr
- Reference
ocds-h6vhtk-077603
- Estimated end · in 321 days
Education Programme: STEM Outreach
High Speed Two (HS2) Limited · Other public body · Nationwide (UK)
Incumbent: Learn By Design · Last contest: 3 bids
Contract Award Notice for HS2's Education Programme STEM Outreach Contract (a contract split into five regional lots). The successful suppliers will deliver Science Technology Engineering and Maths (STEM) outreach activities to primary and …
- Published value
- £204k
- Annual run-rate
- —start date not published
- Term
- Estimated end 17 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02bff3
- Estimated end · in 321 days
Education Programme: STEM Outreach
High Speed Two (HS2) Limited · Other public body · Nationwide (UK)
Incumbent: Learn By Design · Last contest: 2 bids
Contract Award Notice for HS2's Education Programme STEM Outreach Contract (a contract split into five regional lots). The successful suppliers will deliver Science Technology Engineering and Maths (STEM) outreach activities to primary and …
- Published value
- £197k
- Annual run-rate
- —start date not published
- Term
- Estimated end 17 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02bff3
- Estimated end · in 321 days
Education Programme: STEM Outreach
High Speed Two (HS2) Limited · Other public body · Nationwide (UK)
Incumbent: The Smallpeice Trust · Last contest: 5 bids
Contract Award Notice for HS2's Education Programme STEM Outreach Contract (a contract split into five regional lots). The successful suppliers will deliver Science Technology Engineering and Maths (STEM) outreach activities to primary and …
- Published value
- £172k
- Annual run-rate
- —start date not published
- Term
- Estimated end 17 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02bff3
- Estimated end · in 321 days
Education Programme: STEM Outreach
High Speed Two (HS2) Limited · Other public body · Nationwide (UK)
Incumbent: The Smallpeice Trust · Last contest: 6 bids
Contract Award Notice for HS2's Education Programme STEM Outreach Contract (a contract split into five regional lots). The successful suppliers will deliver Science Technology Engineering and Maths (STEM) outreach activities to primary and …
- Published value
- £172k
- Annual run-rate
- —start date not published
- Term
- Estimated end 17 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02bff3
- Ends · in 321 daysExtension option · up to 17 Sept 2028
Planned and Reactive Building Fabric Maintenance at Brooklands Cambridge (NP 337)
Historic England · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Selmec (Lincoln) LTD
HE requires the Contractor to deliver planned and reactive Mechanical, Electrical, Public Health and Building Fabric maintenance to the HE office Brooklands Cambridge.
- Published value
- £116k
- Annual run-rate
- £61kpublished value ÷ term, exc. VAT
- Term
- 22 Oct 2025 → 17 Sept 2027 · 1.9 yrs · up to 17 Sept 2028 with extensions
- Reference
ocds-h6vhtk-059a10
- Ends · in 321 days
00626-CS Online Job Board Subscription
Stonewater Limited · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Indeed UK Operations Limited
Subscription to an online job board platform, including an employer branding suite.
- Published value
- £27k
- Annual run-rate
- £27kpublished value ÷ term, exc. VAT
- Term
- 18 Sept 2026 → 17 Sept 2027 · 1 yr
- Reference
ocds-h6vhtk-077396
- Estimated end · in 322 daysFramework recordPanel · 81 suppliers
Imaging, Radiotherapy and Endoscopy Equipment, Ancillary Devices and Associated Goods and Services
NHS Supply Chain · NHS & health · Nationwide (UK), Greater London, Wales (Cymru)
Panel: ALXR LIMITED, Accuray International Sàrl, Agfa HealthCare UK Limited +78 more
- Published value
- £3.7bnpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 18 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02a5c9
- Estimated end · in 322 daysFramework recordPanel · 15 suppliers
NHS SBS 10247 - ORTHOTIC PRODUCTS AND SERVICES (INCLUDING PROSTHETIC SERVICES)
NHS Shared Business Services Limited · NHS & health · Nationwide (UK)
Panel: AM Healthcare Group, Blatchford Limited, Buchanan Orthotics Limited +12 more
- Published value
- £200mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 18 Sept 2027 · start not published
- Reference
ocds-h6vhtk-03926a
- Ends · in 322 daysFramework recordExtension option · up to 18 Sept 2029
Jisc Certificate Service
Jisc · Other public body · Nationwide (UK)
Incumbent: DIGICERT IRELAND LIMITED
- Published value
- £1.5mpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- 19 Sept 2025 → 18 Sept 2027 · 2 yrs · up to 18 Sept 2029 with extensions
- Reference
ocds-h6vhtk-0527d4
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.