Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 1,551–1,575

  1. Estimated end · in 186 days

    Provision of Roofing Replacements and Associated Products

    Norse Commercial Services Ltd · East Midlands

    Incumbent: Westhoughton Roofing and Pointing Services Ltd · Last contest: 6 bids (6 SME) · awarded 27% under the estimate

    This tender is for a programme of works within the High Peaks area carrying out Roof Covering Replacement and associated works for council owned residential properties. This includes Chimney and repairs works and coverings to Flat Roofs.

    • Roof works and other special trade construction works
    Published value
    £628k
    Annual run-rate
    —start date not published
    Term
    Estimated end 2 May 2027 · start not published
    Reference
    ocds-h6vhtk-044fcc
  2. Estimated end · in 187 daysFramework recordPanel · 3 suppliers

    TC040- Surfacing of Carriageways and Footways Framework

    Manchester City Council · Local authority · North West England

    Panel: J. HOPKINS (CONTRACTORS) LIMITED, Multipave (NW) Limited, Tarmac Trading Limited

    • Construction, foundation and surface works for highways, roads

    Re-procurement plannedProprietary Treatments to Carriageways and Footways

    Published value
    £48mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 3 May 2027 · start not published
    Reference
    ocds-h6vhtk-04d3d2
  3. Ends · in 187 days

    VIVID - Remedial Building and Fire Safety Works at Pemberley Place, Basingstoke

    VIVID · South East England

    Incumbent: Lawtech Group Ltd · Last contest: 5 bids

    Replacement of cladding at Pemberley Place, Basingstoke

    • Construction work
    Published value
    £7.5m
    Annual run-rate
    —start date not published
    Term
    Ends 3 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b440
  4. Ends · in 187 days

    Fire Safety Remediation - Bin Chutes

    London Borough of Hackney · Local authority · Greater London

    Incumbent: Hardall International

    This project covers the supply, manufacture, and installation of replacement refuse hoppers and automatic fire shutter doors across the London Borough of Hackney Portfolio to ensure compliance with BS1703:2005, BS 5588, and BS 476 (Part 22,…

    Published value
    £183k
    Annual run-rate
    £366kpublished value ÷ term, exc. VAT
    Term
    2 Nov 2026 → 3 May 2027 · 6 months
    Reference
    ocds-h6vhtk-0791cc
  5. Estimated end · in 188 days

    Cumbrae Slipway Reconstruction

    Caledonian Maritime Assets Ltd (Utility) · Scotland

    Incumbent: George Leslie Ltd · Last contest: 1 bid (0 SME)

    Cumbrae Ferry Slipway accommodates lifeline ferry services to the Isle of Cumbrae from Largs Pier on the mainland. The existing slipway is nearing the end of its useable lifespan. Works will be undertaken to reconstruct the slipway to the s…

    • Construction work
    Published value
    £9.6m
    Annual run-rate
    —start date not published
    Term
    Estimated end 4 May 2027 · start not published
    Reference
    ocds-h6vhtk-052771
  6. Estimated end · in 188 days

    Cumbrae Slipway Reconstruction

    Caledonian Maritime Assets Ltd (Utility) · Scotland

    Incumbent: George Leslie Ltd · Last contest: 1 bid (0 SME)

    • Construction work
    Published value
    £9.6m
    Annual run-rate
    —start date not published
    Term
    Estimated end 4 May 2027 · start not published
    Reference
    ocds-h6vhtk-052771
  7. Ends · in 188 days

    Repairs and Maintenance - Overdue Repairs, DAM Works and Inspections

    Greensquareaccord · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: Cura Homecare Ltd

    Various repairs across all workstreams covering, roofing, soffits, fascia & guttering repairs, external repairs including brickwork, cavity trays, rendering, slabbing, paths, draining and fencing. Internal repairs covering plumbing, carpent…

    Published value
    £167k
    Annual run-rate
    £182kpublished value ÷ term, exc. VAT
    Term
    5 Jun 2026 → 4 May 2027 · 11 months
    Reference
    ocds-h6vhtk-06c273
  8. Ends · in 188 days

    Installation of Extract Pipework

    CENTRE FOR PROCESS INNOVATION LIMITED · Other public body

    Incumbent: Ambient Air Conditioning UK Ltd

    The installation of x2 (two) extraction pipework is to facilitate the safe operation of a new Thermofiher Mass Spectrometer tool being purchased and installed separately into lab 1.16.

    Published value
    £51kinc. VAT as published
    Annual run-rate
    £51kpublished value ÷ term, inc. VAT
    Term
    5 May 2026 → 4 May 2027 · 1 yr
    Reference
    ocds-h6vhtk-06c1f4
  9. Ends · in 188 days

    Purdis Farm 3 Boardwalk Replacement

    Suffolk County Council · Local authority · East of England

    Incumbent: C D C BLOWERS LIMITED

    Suffolk County Council has awarded a contract to CDC Blowers LTD for Purdis Farm 3 Boardwalk Replacement.

    Published value
    £29k
    Annual run-rate
    £50kpublished value ÷ term, exc. VAT
    Term
    5 Oct 2026 → 4 May 2027 · 7 months
    Reference
    ocds-h6vhtk-0786a1
  10. Estimated end · in 189 days

    Fire Safety Works

    Radius Housing Association · Housing · Northern Ireland

    Incumbent: Harmony Fire Ltd · Last contest: 3 bids · awarded 20% under the estimate

    The Contracting Authority, Radius Housing Association Ltd owns and manages nearly 13,000 general needs, sheltered and supported housing schemes in and around Northern Ireland. Radius Housing are appointing a Provider to deliver the works id…

    • Joinery and carpentry installation work
    Published value
    £4.0m
    Annual run-rate
    —start date not published
    Term
    Estimated end 5 May 2027 · start not published
    Reference
    ocds-h6vhtk-031195
  11. Ends · in 189 days

    Chatham Court & High Street EA Services

    Wandle Housing Association Limited · Charity · Greater London

    Incumbent: Re-Gen (UK) Construction Ltd · Last contest: awarded 14% under the estimate

    Chatham Court: Removing the current, combustible insulation, and replacing this system with a new, fixed system using A1, s1- d0 materials. Cavity Barriers are also due to be fitted, along all compartment walls/floors, where the insulation …

    Published value
    £354k
    Annual run-rate
    £537kpublished value ÷ term, exc. VAT
    Term
    7 Sept 2026 → 5 May 2027 · 8 months
    Reference
    ocds-h6vhtk-0610e5
  12. Ends · in 189 days

    Cleveland Health Centre - Left-hand Lift Replacement

    NHS Property Services Limited · NHS & health

    Incumbent: UK LIFT AND ESCALATOR COMPANY LTD

    Contract for Cleveland Health Centre - Left-hand Lift Replacement

    Published value
    £150k
    Annual run-rate
    —term under 6 months
    Term
    15 Feb 2027 → 5 May 2027 · 3 months
    Reference
    ocds-h6vhtk-07843d
  13. Estimated end · in 190 daysFramework recordPanel · 38 suppliers

    Energy Efficiency Framework

    The Highland Council · Local authority · Scotland

    Panel: AES Solar, Alternative Heat Ltd., Asset Integrity Scotland ltd +35 more

    • Construction work
    Published value
    £25mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 6 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b5d6
  14. Ends · in 191 daysExtension option · up to 7 Nov 2027

    Kingswood Park Restoration and Enhancement Project 2025

    South Gloucestershire Council · Local authority · South West England

    Incumbent: K.P.Wilton & Son Limited · Last contest: awarded 20% under the estimate

    Programme of capital work to improve accessibility and facilities within the park, including construction of new public toilet, significant park hard & soft landscape improvements, resurfacing paths and new access ramps.

    Published value
    £1.6m
    Annual run-rate
    £1.8mpublished value ÷ term, exc. VAT
    Term
    22 Jun 2026 → 7 May 2027 · 11 months · up to 7 Nov 2027 with extensions
    Reference
    ocds-h6vhtk-05d10a
  15. Ends · in 191 daysExtension option · up to 7 May 2028

    Changes to Yorkshire Water apparatus necessitated by construction of forthcoming West Bradford Cycle Superhighway Phase 2

    City of Bradford Metropolitan District Council · Local authority · Yorkshire and the Humber

    Incumbent: Yorkshire Water Services Ltd

    Changes to YW apparatus necessitated by construction of forthcoming West Bradford Cycle Superhighway Phase 2. Yorkshire Water are the only contractor who can carry out works on their apparatus which is required to be amended to facilitate t…

    Published value
    £41k
    Annual run-rate
    £44kpublished value ÷ term, exc. VAT
    Term
    5 Jun 2026 → 7 May 2027 · 11 months · up to 7 May 2028 with extensions
    Reference
    ocds-h6vhtk-06ae7b
  16. Estimated end · in 192 daysFramework recordPanel · 12 suppliers

    Estates Minor Works Framework (Maintenance Framework)

    Cardiff University · Education · Wales (Cymru)

    Panel: 2D Building Contractors, A J CREWS & CO LIMITED, ARC ELECTRICAL SYSTEMS LTD +9 more

    • Building construction work
    Published value
    £6.0mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 8 May 2027 · start not published
    Reference
    ocds-h6vhtk-0401a9
  17. Ends · in 192 days

    Museum of Two Halves Project, Wrexham - Enabling and Shell & Core Works Package

    Wrexham County Borough Council · Local authority · Wales (Cymru)

    Incumbent: SWG Construction (Build and Renovate) Ltd · Last contest: 4 bids (4 SME)

    Award of contract for appoinment of a principle building contractor for the Base Build Construction Works (Shell & Core) for the refurbishment of the Grade II Listed Wrexham County Borough Museum & Archives building (County Buildings, Regen…

    • Building construction work
    Published value
    £5.5m
    Annual run-rate
    £1.9mpublished value ÷ term, exc. VAT
    Term
    20 May 2024 → 8 May 2027 · 3 yrs
    Reference
    ocds-h6vhtk-040c90
  18. Ends · in 192 days

    Museum of Two Halves – Base Build Construction Works (Shell & Core)

    Wrexham County Borough Council · Local authority · Wales (Cymru)

    Incumbent: SWG Construction (Build and Renovate) Ltd · Last contest: 4 bids (4 SME)

    • Building construction work
    Published value
    £5.4m
    Annual run-rate
    £1.8mpublished value ÷ term, exc. VAT
    Term
    20 May 2024 → 8 May 2027 · 3 yrs
    Reference
    ocds-h6vhtk-040c90
  19. Estimated end · in 193 days

    Supply and Installation of Fire Doors in Housing Blocks

    Newcastle City Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: Straightline NE Ltd · Last contest: 15 bids (11 SME)

    Supply and installation of fire doors, Citywide

    • Construction work
    Published value
    £5.2m
    Annual run-rate
    —start date not published
    Term
    Estimated end 9 May 2027 · start not published
    Reference
    ocds-h6vhtk-04d044
  20. Ends · in 193 daysExtension option · up to 28 Mar 2030

    Witney Drill Tower Structural Repairs

    Oxfordshire County Council · Local authority · South East England

    Incumbent: GUNITE (EASTERN) LIMITED

    Witney Fire Station - Drill Tower Structural Repairs

    Published value
    £89k
    Annual run-rate
    £79kpublished value ÷ term, exc. VAT
    Term
    28 Mar 2026 → 9 May 2027 · 1.1 yrs · up to 28 Mar 2030 with extensions
    Reference
    ocds-h6vhtk-0688d0
  21. Estimated end · in 194 daysPanel · 4 suppliers

    BCHN (Buchan)

    Aberdeenshire Council · Local authority · Scotland

    Panel: Crystal Clear Grampian Ltd, James Fairley Design and Build, Space Solutions (Scotland) Limited +1 more · Last contest: 4 bids (4 SME)

    Aberdeenshire Council require competitive tenders of suitably qualified contractors to complete the Housing Repairs – Builder Work. The project will involve working to a strict priority timeline and ensuring excellent communication skills b…

    • Construction work
    Published value
    £4.2m
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 10 May 2027 · start not published
    Reference
    ocds-h6vhtk-04eea3
  22. Estimated end · in 194 daysPanel · 4 suppliers

    BBU2 (Banff and Buchan 2)

    Aberdeenshire Council · Local authority · Scotland

    Panel: Crystal Clear Grampian Ltd, James Fairley Design and Build, Space Solutions (Scotland) Limited +1 more · Last contest: 4 bids (4 SME)

    Aberdeenshire Council require competitive tenders of suitably qualified contractors to complete the Housing Repairs – Builder Work. The project will involve working to a strict priority timeline and ensuring excellent communication skills b…

    • Construction work
    Published value
    £2.1m
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 10 May 2027 · start not published
    Reference
    ocds-h6vhtk-04eea3
  23. Estimated end · in 194 daysPanel · 4 suppliers

    BCHN (Buchan)

    Aberdeenshire Council · Local authority · Scotland

    Panel: Crystal Clear Grampian Ltd, James Fairley Design and Build, Space Solutions (Scotland) Limited +1 more · Last contest: 4 bids (4 SME)

    • Construction work
    Published value
    £1.1m
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 10 May 2027 · start not published
    Reference
    ocds-h6vhtk-04eea3
  24. Estimated end · in 194 daysPanel · 4 suppliers

    KMRN ( Kincardine and Mearns)

    Aberdeenshire Council · Local authority · Scotland

    Panel: Bridgefield Services Ltd, Crystal Clear Grampian Ltd, James Fairley Design and Build +1 more · Last contest: 4 bids (4 SME)

    Aberdeenshire Council require competitive tenders of suitably qualified contractors to complete the Housing Repairs – Builder Work. The project will involve working to a strict priority timeline and ensuring excellent communication skills b…

    • Construction work
    Published value
    £1.0m
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 10 May 2027 · start not published
    Reference
    ocds-h6vhtk-04eea3
  25. Estimated end · in 194 daysPanel · 3 suppliers

    BBU (Banff and Buchan 1)

    Aberdeenshire Council · Local authority · Scotland

    Panel: Crystal Clear Grampian Ltd, James Fairley Design and Build, Space Solutions (Scotland) Limited · Last contest: 3 bids (3 SME)

    Aberdeenshire Council require competitive tenders of suitably qualified contractors to complete the Housing Repairs – Builder Work. The project will involve working to a strict priority timeline and ensuring excellent communication skills b…

    • Construction work
    Published value
    £920k
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 10 May 2027 · start not published
    Reference
    ocds-h6vhtk-04eea3

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,836 contracts and agreements end within 24 months, 4,734 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months927
  2. 3–6 months580
  3. 6–12 months597
  4. 12–24 months732

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.