Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 61–70

  1. Ends · in 75 days

    CSP26786 - Gadolinium Foil

    UK Research and Innovation · Central government · Nationwide (UK)

    Incumbent: Goodfellow Cambridge Ltd

    ***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded following a limited competition procurement exercise. UK Research Innovation (UKRI) had a requirement for Gadolinium Foil to be su…

    Published value
    £20k
    Annual run-rate
    —term under 6 months
    Term
    1 Sept 2026 → 10 Jan 2027 · 4 months
    Reference
    ocds-h6vhtk-06f0cb
  2. Ends · in 80 days

    PLA26167 Bay of Lights 2026 – Ice Rink Marquee Provider

    Torbay Council · Local authority · South West England

    Incumbent: Marldon Marquees Limited

    Marquee provision and associated services for Bay of Lights 2026 Ice Rink

    Published value
    £60k
    Annual run-rate
    —term under 6 months
    Term
    2 Nov 2026 → 15 Jan 2027 · 2 months
    Reference
    ocds-h6vhtk-077ec2
  3. Ends · in 80 days

    DDaT26519 - Electrical Hardware

    UK Research and Innovation · Central government · Nationwide (UK)

    Incumbent: Underwoods electrical Distributors

    ***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded following a limited competition procurement exercise. Brief Description of Requirement: Electrical Hardware

    Published value
    £13k
    Annual run-rate
    —term under 6 months
    Term
    16 Oct 2026 → 15 Jan 2027 · 3 months
    Reference
    ocds-h6vhtk-078ad5
  4. Estimated end · in 82 days

    Building Materials

    CHP · East of England

    Incumbent: STARK BUILDING MATERIALS UK LIMITED · Last contest: 2 bids (0 SME)

    AWARD NOTICE The main purpose of the Contract is to supply CHP with the required materials, products and tools so that we can maintain our housing stock of approximately 11,000 properties across Essex and surrounding areas. Our key aims hav…

    • Construction structures and materials; auxiliary products to construction (except electric apparatus)
    Published value
    £443k
    Annual run-rate
    —start date not published
    Term
    Estimated end 17 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-040865
  5. Estimated end · in 82 days

    Consumables and Hand Tools

    CHP · East of England

    Incumbent: Screw Centre Ltd · Last contest: 2 bids (1 SME)

    AWARD NOTICE The main purpose of the Contract is to supply CHP with the required materials, products and tools so that we can maintain our housing stock of approximately 11,000 properties across Essex and surrounding areas. Our key aims hav…

    • Construction structures and materials; auxiliary products to construction (except electric apparatus)
    Published value
    £262k
    Annual run-rate
    —start date not published
    Term
    Estimated end 17 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-040865
  6. Estimated end · in 82 days

    Power Tools

    CHP · East of England

    Incumbent: Screw Centre Ltd · Last contest: 4 bids (1 SME)

    AWARD NOTICE The main purpose of the Contract is to supply CHP with the required materials, products and tools so that we can maintain our housing stock of approximately 11,000 properties across Essex and surrounding areas. Our key aims hav…

    • Construction structures and materials; auxiliary products to construction (except electric apparatus)
    Published value
    £123k
    Annual run-rate
    —start date not published
    Term
    Estimated end 17 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-040865
  7. Estimated end · in 82 days

    Glazing

    CHP · East of England

    Incumbent: Screw Centre Ltd · Last contest: 1 bid (1 SME)

    AWARD NOTICE The main purpose of the Contract is to supply CHP with the required materials, products and tools so that we can maintain our housing stock of approximately 11,000 properties across Essex and surrounding areas. Our key aims hav…

    • Construction structures and materials; auxiliary products to construction (except electric apparatus)
    Published value
    £114k
    Annual run-rate
    —start date not published
    Term
    Estimated end 17 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-040865
  8. Estimated end · in 82 days

    Timber Doors

    CHP · East of England

    Incumbent: Huws Gray Limited · Last contest: 2 bids (0 SME)

    AWARD NOTICE The main purpose of the Contract is to supply CHP with the required materials, products and tools so that we can maintain our housing stock of approximately 11,000 properties across Essex and surrounding areas. Our key aims hav…

    • Construction structures and materials; auxiliary products to construction (except electric apparatus)
    Published value
    £107k
    Annual run-rate
    —start date not published
    Term
    Estimated end 17 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-040865
  9. Estimated end · in 82 days

    Locks

    CHP · East of England

    Incumbent: Huws Gray Limited · Last contest: 1 bid (0 SME)

    AWARD NOTICE The main purpose of the Contract is to supply CHP with the required materials, products and tools so that we can maintain our housing stock of approximately 11,000 properties across Essex and surrounding areas. Our key aims hav…

    • Construction structures and materials; auxiliary products to construction (except electric apparatus)
    Published value
    £106k
    Annual run-rate
    —start date not published
    Term
    Estimated end 17 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-040865
  10. Estimated end · in 88 days

    Fire Detection

    Northampton General Hospital NHS Trust · NHS & health · East Midlands

    Incumbent: Fire Systems Consultants Ltd · Last contest: 4 bids (4 SME)

    Fire Detection replacement plan

    • Fire-protection devices
    Published value
    Not published
    Annual run-rate
    —value not published
    Term
    Estimated end 23 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-03b408

When contracts end · Construction structures and materials
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

340 contracts and agreements end within 24 months, 506 in total · £105m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months73
  2. 3–6 months66
  3. 6–12 months81
  4. 12–24 months120

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.