Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 61–70
- Ends · in 155 days
Fire panel installation
Sellafield Limited · Other public body · North West England
Incumbent: Siemens Power Generation
Fire panel installation including engineer visit for 1 week, project management costs and training.
- Published value
- £72k
- Annual run-rate
- £70kpublished value ÷ term, exc. VAT
- Term
- 23 Mar 2026 → 31 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-067239
- Ends · in 155 days
Laboratory, Forensic & Pathology Equipement
Stoke on Trent City Council · Local authority · West Midlands
Incumbent: LEEC Ltd
Hire of equipment for laboratory, Forensic and Pathology purposes
- Published value
- £42k
- Annual run-rate
- £42kpublished value ÷ term, exc. VAT
- Term
- 1 Apr 2026 → 31 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-06a708
- Ends · in 155 days
Hire of Crane Services for Skip Package Transportation
Nuclear Restoration Services Limited · Other public body
Incumbent: Coussens Cranes Ltd
Hire of 230 T Crane & Hiab Lorry for transportation of Skip packages within the DNA Ponds area
- Published value
- £35k
- Annual run-rate
- £19kpublished value ÷ term, exc. VAT
- Term
- 8 May 2025 → 31 Mar 2027 · 1.9 yrs
- Reference
ocds-h6vhtk-066831
- Ends · in 155 daysExtension option · up to 31 Mar 2029
Electrician & Power for Southport Events in 2026
Sefton Council · Local authority · North West England
Incumbent: Pholex Ltd
Electrician & Power for Southport Events in 2026 (with 2 x 12-month extension options). Sefton Council’s Tourism Section is responsible for arranging events for the Southport area which includes the Southport Food and Drink Festival, the So…
- Published value
- £20k
- Annual run-rate
- £20kpublished value ÷ term, exc. VAT
- Term
- 1 Apr 2026 → 31 Mar 2027 · 1 yr · up to 31 Mar 2029 with extensions
- Reference
ocds-h6vhtk-0610c1
- Ends · in 155 days
CSP26885 - PCB Manufacture for Power Pigtail
UK Research and Innovation · Central government · Nationwide (UK)
Incumbent: Zot Engineering Ltd
***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded without competition due to only a particular supplier can supply the goods needed. UK Research & Innovation require the purchase o…
- Published value
- £14k
- Annual run-rate
- —term under 6 months
- Term
- 21 Oct 2026 → 31 Mar 2027 · 5 months
- Reference
ocds-h6vhtk-078c0d
- Ends · in 155 days
Legionella and Pseudomonas Aeruginosa testing
Somerset NHS Foundation Trust · Central government · South West England
Incumbent: INDEX MICROBIOLOGY LIMITED
Legionella and Pseudomonas Aeruginosa testing for the Trust
- Published value
- £14k
- Annual run-rate
- £14kpublished value ÷ term, exc. VAT
- Term
- 1 Apr 2026 → 31 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-067f53
- Ends · in 155 days
Replacement of 3 distribution Boards at Bartholomew House Goole. Quote - QUO49619
Humber Teaching NHS Foundation Trust · NHS & health · Yorkshire and the Humber
Incumbent: Airco Refrigeration & Air Conditioning Ltd
Replacement of 3 distribution boards at Bartholomew House, Goole, DN14 6LA. Quote - QUO49619
- Published value
- £13k
- Annual run-rate
- £18kpublished value ÷ term, exc. VAT
- Term
- 6 Jul 2026 → 31 Mar 2027 · 9 months
- Reference
ocds-h6vhtk-06e05c
- Ends · in 158 days
Landscape works for public realm scheme
West Northamptonshire Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Bernhard's Landscapes Limited
Landscape works for the public realm scheme on Abington Street and Fish Street. To supply and install plant pots etc £63,910
- Published value
- £68k
- Annual run-rate
- £46kpublished value ÷ term, exc. VAT
- Term
- 14 Oct 2025 → 3 Apr 2027 · 1.5 yrs
- Reference
ocds-h6vhtk-05f233
- Ends · in 167 days
LYP 144 2025_26
Leeds and York Partnership NHS Foundation Trust · Central government
Incumbent: Astor-Bannerman Ltd
Bath & Hoist Replacement
- Published value
- £27k
- Annual run-rate
- £27kpublished value ÷ term, exc. VAT
- Term
- 13 Apr 2026 → 12 Apr 2027 · 1 yr
- Reference
ocds-h6vhtk-0673f1
- Estimated end · in 182 days
Mechanical Electrical and Specialist Services
Milton Keynes Council · Local authority · South East England
Incumbent: JCW Energy Services Ltd. · Last contest: 3 bids (1 SME) · awarded at the estimate
Mechanical, Electrical and Specialist Services – Reactive, quoted and planned/compliance works for three specialist sites, OF005 Civic Offices, OT072 Brookland Health Centre and OT084 Whitehouse Health Centre.
- Published value
- £1.4m
- Annual run-rate
- —start date not published
- Term
- Estimated end 27 Apr 2027 · start not published
- Reference
ocds-h6vhtk-0303b1
When contracts end · Installation services (except software) i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
127 contracts and agreements end within 24 months, 198 in total · £18m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.