Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 61–70

  1. Ends · in 5 days

    SDEC Expansion / Therapy Services Relocation QS Fee bid

    Mid Yorkshire Hospitals NHS Trust · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: DAVID SLATER ASSOCIATES

    Provide Quantity Surveyor / Cost Advisor support for the above scheme as per the recent competitive tender process

    Published value
    £32k
    Annual run-rate
    £23kpublished value ÷ term, exc. VAT
    Term
    18 Jun 2025 → 1 Nov 2026 · 1.3 yrs
    Reference
    ocds-h6vhtk-056a31
  2. Ends · in 5 days

    Quantity Surveyor and Project Lead Package for Office Conversions.

    Great Yarmouth Borough Council · Local authority · East of England

    Incumbent: AECOM LIMITED

    Quantity Surveyor and Project Lead Package Office Conversions at the value of £29,350 provided by Aecom Ltd.

    Published value
    £29k
    Annual run-rate
    £23kpublished value ÷ term, exc. VAT
    Term
    15 Jul 2025 → 1 Nov 2026 · 1.3 yrs
    Reference
    ocds-h6vhtk-061189
  3. Ends · in 5 days

    Doncaster City Centre Green Infrastructure and Active Design Policy

    City of Doncaster Council · Local authority · Yorkshire and the Humber

    Incumbent: LUC

    Consultancy work to develop the above named policy. Promotes a greener, healthier Doncaster by integrating green infrastructure and active design into urban planning, enhancing biodiversity, connectivity, and community wellbeing in the city…

    Published value
    £27k
    Annual run-rate
    £27kpublished value ÷ term, exc. VAT
    Term
    1 Nov 2025 → 1 Nov 2026 · 1 yr
    Reference
    ocds-h6vhtk-05d2a2
  4. Estimated end · in 6 daysFramework recordPanel · 3 suppliers

    Multi-supplier Framework Agreement for proposed utility diversions and/or protection audit and advice services

    Transport Scotland · Scotland

    Panel: Allen Gordon, Long O Donnell Associates Limited, Mott MacDonald

    • Infrastructure works consultancy services
    Published value
    £1.8mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 2 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-02eee5
  5. Ends · in 7 days

    Office for Product Safety and Standards - Eco Design Testing for Washing Machines

    Department for Business & Trade · Central government · Nationwide (UK)

    Incumbent: SGS United Kingdom Limited

    Testing of Washing Machines obtained from the UK market to assess efficiency and compliance with designated eco-design and energy labelling standards.

    Published value
    £112k
    Annual run-rate
    £113kpublished value ÷ term, exc. VAT
    Term
    7 Nov 2025 → 3 Nov 2026 · 1 yr
    Reference
    ocds-h6vhtk-05e151
  6. Ends · in 7 days

    UE261081RL

    University of Exeter · Central government

    Incumbent: Ronald Kessler

    Provide remote consultation for design implementation and interpretation of machine-learning data analyses via series of remote meetings of 1-2hrs each for maximum 18 hours from Nov 2025 to March 2026

    Published value
    US$37,195
    Annual run-rate
    —not a GBP value
    Term
    5 Nov 2025 → 3 Nov 2026 · 1 yr
    Reference
    ocds-h6vhtk-068e27
  7. Ends · in 7 days

    Drainage Infrastructure Review

    Mersey and West Lancashire Teaching Hospital NHS Trust · Central government

    Incumbent: Gilling Dod Limited

    Provide architecture design services for a review of the existing drainage infrastructure at Southport District General Hospital.

    Published value
    £16k
    Annual run-rate
    —term under 6 months
    Term
    4 Aug 2026 → 3 Nov 2026 · 3 months
    Reference
    ocds-h6vhtk-06df06
  8. Estimated end · in 8 daysFramework recordPanel · 3 suppliers

    Highways and Transport Services Framework

    London Borough of Lewisham · Local authority · Greater London

    Panel: Norman Rourke, Project Centre Limited, Waterman Infrastructure & Environment Ltd

    This is an award notice and this opportunity is now closed. This framework will cover Transport and Engineering services. Three suppliers have been awarded onto the framework.

    • Architectural, construction, engineering and inspection services
    Published value
    £2.0mlargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 4 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-031fdf
  9. Estimated end · in 8 days

    Estates: Cost Manager for Madras New College Building

    University of St Andrews · Education · Scotland

    Incumbent: CURRIE and BROWN UK LIMITED · Last contest: 5 bids (5 SME)

    Cost Manager Services for Madras New College Building at the University of St Andrews.

    • Quantity surveying services
    Published value
    £451k
    Annual run-rate
    —start date not published
    Term
    Estimated end 4 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-03dd37
  10. Estimated end · in 8 days

    TD1788 - Fire Risk Assessment Services

    Derby City Council · Local authority · East Midlands

    Incumbent: International Fire Consultants Limited · Last contest: 10 bids · awarded at the estimate

    Derby City Council is undertaking this procurement to establish a contract for fire risk assessment services.

    • Fire and explosion protection and control consultancy services
    Published value
    £195k
    Annual run-rate
    —start date not published
    Term
    Estimated end 4 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-02e173

When contracts end · Architectural, construction, engineering
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,285 contracts and agreements end within 24 months, 3,292 in total · £790m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months395
  2. 3–6 months489
  3. 6–12 months529
  4. 12–24 months872

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.