Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 1,851–1,875
- Ends · in 277 days
Asphalt Preservation
Via East Midlands LTD · Other public body · East Midlands
Incumbent: Velocity UK Ltd
Preparational patching and asphalt preservation works. Asphalt preservation works (2026), all in accordance with the 'Via East Midlands Lot 6 Asphalt Preservation 2025/26 Project Brief' and 'Dynamic Purchasing Information Pack' (2023). Spec…
- Published value
- £340k
- Annual run-rate
- £340kpublished value ÷ term, exc. VAT
- Term
- 1 Aug 2026 → 31 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-06d05b
- Ends · in 277 days
CALM PEACEPLUS River Restoration Works on Scotstown River – Phase 1
Armagh City Banbridge and Craigavon Borough Council · Local authority
Incumbent: CivCo Limited · Last contest: awarded 19% over the estimate
Armagh City, Banbridge, and Craigavon Borough Council is a partner on the CALM Project with Lead Partner- East Border Region (EBR), Agri-Food and Biosciences Institute, Inland Fisheries Ireland, the Loughs Agency and Ulster University. The …
- Published value
- £298k
- Annual run-rate
- £298kpublished value ÷ term, exc. VAT
- Term
- 1 Aug 2026 → 31 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-06b6bb
- Ends · in 277 days
Secure Room Alterations
Financial Conduct Authority · Other public body · Greater London
Incumbent: OPEC Construction Ltd
Minor construction project to internal walls and doors.
- Published value
- £250k
- Annual run-rate
- £250kpublished value ÷ term, exc. VAT
- Term
- 1 Aug 2026 → 31 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-06e3ec
- Ends · in 277 days
Burley Recreation Ground – Pump Track
City of Bradford Metropolitan District Council · Local authority · Yorkshire and the Humber
Incumbent: Architrail Velosolutions UK Ltd
The City of Bradford Metropolitan District Council (The Council) required a suitably qualified and experienced Contractor to provide new pump track at Burley / Iron Row Recreation Ground, York Road, Burley In Wharfedale, LS29 7DH. This will…
- Published value
- £183k
- Annual run-rate
- £123kpublished value ÷ term, exc. VAT
- Term
- 2 Feb 2026 → 31 Jul 2027 · 1.5 yrs
- Reference
ocds-h6vhtk-060a6f
- Ends · in 277 daysExtension option · up to 31 Jul 2028
Diseworth Property Flood Resilience
Leicestershire County Council · Local authority · East Midlands
Incumbent: Whitehouse Construction Co. Limited · Last contest: awarded 18% under the estimate
Property Flood Resilience (PFR) measures to be designed and installed to up to nineteen residential properties in Diseworth, Leicestershire.
- Published value
- £123k
- Annual run-rate
- £119kpublished value ÷ term, exc. VAT
- Term
- 20 Jul 2026 → 31 Jul 2027 · 1 yr · up to 31 Jul 2028 with extensions
- Reference
ocds-h6vhtk-069fe0
- Ends · in 277 days
Barton Footbridge Strengthening
The North Yorkshire Council · Local authority
Incumbent: PBS Construction (North East) Limited
Barton Footbridge Strengthening Works
- Published value
- £118k
- Annual run-rate
- £128kpublished value ÷ term, exc. VAT
- Term
- 31 Aug 2026 → 31 Jul 2027 · 11 months
- Reference
ocds-h6vhtk-078287
- Ends · in 277 days
Cadent Gas Diversionary Works
City of Doncaster Council · Local authority · Yorkshire and the Humber
Incumbent: Cadent Gas Limited
Diversion of Cadent Gas Infrastructure required resulting from the highway alterations on the Greens Way Project
- Published value
- £109k
- Annual run-rate
- £80kpublished value ÷ term, exc. VAT
- Term
- 23 Mar 2026 → 31 Jul 2027 · 1.3 yrs
- Reference
ocds-h6vhtk-067132
- Estimated end · in 278 days
DIHD24007 - Meiklefield Ph2 - New Build Development.
The Highland Council · Local authority · Scotland
Incumbent: Morrison Construction · Last contest: 5 bids (0 SME)
34no New build development & associated civils works.
- Published value
- £6.1m
- Annual run-rate
- —start date not published
- Term
- Estimated end 1 Aug 2027 · start not published
- Reference
ocds-h6vhtk-0606b6
- Ends · in 278 days
Section 10 inspections Epping Forest Reservoirs
The Mayor and Commonalty and Citizens of the City of London · Local authority
Incumbent: Stillwater Associates Ltd
Section 10 inspections Epping Forest Reservoirs - increase PO 1125109 to an additional £11,600.00 (total order - £21,600)
- Published value
- £176kinc. VAT as published
- Annual run-rate
- £92kpublished value ÷ term, inc. VAT
- Term
- 1 Sept 2025 → 1 Aug 2027 · 1.9 yrs
- Reference
ocds-h6vhtk-0782de
- Ends · in 278 days
Sewage Treatment System Replacement and Relocation
Devon County Council · Local authority · South West England
Incumbent: PREMIER WATER SOLUTIONS 10 LTD
Sewage treatment system replacement and relocation. Supply and install a compact NH4P0 package wastewater treatment plant, connected to highway drainage conveying treated effluent discharge to an appropriate watercourse.
- Published value
- £41k
- Annual run-rate
- £35kpublished value ÷ term, exc. VAT
- Term
- 4 Jun 2026 → 1 Aug 2027 · 1.2 yrs
- Reference
ocds-h6vhtk-06883b
- Estimated end · in 279 daysFramework recordPanel · 3 suppliers
Landscape Planting & Establishment Works including Highways Environments Framework for Hampshire
Hampshire County Council · Local authority · South East England
Panel: Ainsty Timber Marketing Limited trading as ATM, Blakedown Landscapes (SE) Limited, Scandor Landscape Contractors Ltd
- Published value
- £4.5mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 2 Aug 2027 · start not published
- Reference
ocds-h6vhtk-03a116
- Ends · in 279 days
Priory Surgery Holywood
Department Health · Central government
Incumbent: Bavan Contracts
Single storey extension at front and side to accommodate new treatment room and extended plantroom. Upgrade of M&E and ICT Infrastructure. Internal reconfiguration and partial refurbishment.
- Published value
- £1.1m
- Annual run-rate
- £1.1mpublished value ÷ term, exc. VAT
- Term
- 3 Aug 2026 → 2 Aug 2027 · 1 yr
- Reference
ocds-h6vhtk-06af02
- Ends · in 279 days
Brighton Lift Replacement
The Police & Crime Commissioner for Sussex · Police & fire · South East England
Incumbent: Unite Lift Services Ltd
Replacement and associated works to replace lift at Brighton John Street Police Station
- Published value
- £158k
- Annual run-rate
- £168kpublished value ÷ term, exc. VAT
- Term
- 24 Aug 2026 → 2 Aug 2027 · 11 months
- Reference
ocds-h6vhtk-06ac32
- Ends · in 279 days
Cleveland Health Centre - Right-hand Lift Replacement
NHS Property Services Limited · NHS & health
Incumbent: UK LIFT AND ESCALATOR COMPANY LTD
Contract for Cleveland Health Centre - Right-hand Lift Replacement
- Published value
- £150k
- Annual run-rate
- —term under 6 months
- Term
- 17 May 2027 → 2 Aug 2027 · 3 months
- Reference
ocds-h6vhtk-0782d7
- Ends · in 282 days
Shirley Skatepark Works
Southampton City Council · Local authority · South East England
Incumbent: SCHOFIELD GROUNDWORKS LIMITED
The proposed works comprise the refurbishment and enhancement of the existing Shirley Ponds Skatepark through extensive groundworks, site regrading and reinforced concrete construction. A key feature of the scheme is the retention of the ex…
- Published value
- £255k
- Annual run-rate
- £255kpublished value ÷ term, exc. VAT
- Term
- 6 Aug 2026 → 5 Aug 2027 · 1 yr
- Reference
ocds-h6vhtk-06de18
- Estimated end · in 283 days
The Supply, Delivery, Erection, Maintenance and Repair of Fencing and Gating
London Borough of Hillingdon · Local authority · Greater London
Incumbent: CYRIL SMITH FENCING LIMITED · Last contest: 2 bids · awarded 8% over the estimate
The London Borough of Hillingdon owns a housing stock of approximately 10,000 properties located on a number of estates within the geographical area of the Borough. The Council also provides services to residents from a number of corporate …
Re-procurement plannedThe Supply, Delivery, Erection, Maintenance and Repair of Fencing and Gating · tender expected
- Published value
- £1.3m
- Annual run-rate
- —start date not published
- Term
- Estimated end 6 Aug 2027 · start not published
- Reference
ocds-h6vhtk-03268e
- Estimated end · in 284 daysFramework recordPanel · 31 suppliers
DEMOLITION WORKS & ASBESTOS SURVEYING
The Association of North East Councils Limited · Local authority · Nationwide (UK), North East England
Panel: A.BUCKLER HAULAGE LIMITED, APEC Environmental Limited, Acorn Analytical Services +28 more
- Published value
- £100mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 7 Aug 2027 · start not published
- Reference
ocds-h6vhtk-04838c
- Estimated end · in 285 daysLinked to a framework or DPS
Lot 1 - England & Wales - Lower £0 - £10m
Scape Group Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Morgan Sindall Construction and Infrastructure Ltd
- Published value
- £2.0bnvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 8 Aug 2027 · start not published
- Reference
ocds-h6vhtk-03eb9d
- Estimated end · in 285 daysLinked to a framework or DPS
Lot 2 - England & Wales - Lower £0 - £10m
Scape Group Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Kier Construction Ltd
- Published value
- £2.0bnvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 8 Aug 2027 · start not published
- Reference
ocds-h6vhtk-03eb9e
- Estimated end · in 285 daysLinked to a framework or DPS
Lot 3 - England & Wales - Upper £7.5m - £100m
Scape Group Limited (trading as SCAPE) · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: Willmott Dixon Construction Limited
- Published value
- £2.0bnvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 8 Aug 2027 · start not published
- Reference
ocds-h6vhtk-03eb9f
- Estimated end · in 285 daysLinked to a framework or DPS
Lot 4 - England & Wales - Upper £7.5m - £100m
Scape Group Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Morgan Sindall Construction and Infrastructure Ltd
- Published value
- £2.0bnvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 8 Aug 2027 · start not published
- Reference
ocds-h6vhtk-03eba0
- Estimated end · in 285 daysLinked to a framework or DPS
Lot 1 - England & Wales - Lower £0 - £10m
Scape Group Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Morgan Sindall Construction and Infrastructure Ltd
- Published value
- £2.0bnvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 8 Aug 2027 · start not published
- Reference
ocds-h6vhtk-0444f7
- Estimated end · in 285 daysLinked to a framework or DPS
Lot 2 - England & Wales - Lower £0 - £10m
Scape Group Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Kier Construction Ltd
- Published value
- £2.0bnvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 8 Aug 2027 · start not published
- Reference
ocds-h6vhtk-0444f8
- Estimated end · in 285 daysLinked to a framework or DPS
Lot 3 - England & Wales - Upper £7.5m - £100m
Scape Group Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Willmott Dixon Construction Limited
- Published value
- £2.0bnvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 8 Aug 2027 · start not published
- Reference
ocds-h6vhtk-0444f9
- Estimated end · in 285 daysLinked to a framework or DPS
Lot 4 - England & Wales - Upper £7.5m - £100m
Scape Group Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Morgan Sindall Construction and Infrastructure Ltd
- Published value
- £2.0bnvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 8 Aug 2027 · start not published
- Reference
ocds-h6vhtk-0444fa
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.