Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 1,876–1,900

  1. Estimated end · in 285 daysLinked to a framework or DPS

    Lot 7 - England, Wales & Northern Ireland - Principal £75m plus

    Scape Group Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: JOHN SISK & SON (HOLDINGS) LTD

    • Construction work
    Published value
    £1.5bnvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 8 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-0444fd
  2. Estimated end · in 285 daysLinked to a framework or DPS

    Lot 8 - England & Wales - Upper £7.5m - £100m

    Scape Group Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: MACE LTD

    • Construction work
    Published value
    £1.5bnvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 8 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-04451b
  3. Estimated end · in 285 daysLinked to a framework or DPS

    Lot 5 - Northern Ireland - Lower £0 - £10m

    Scape Group Limited (trading as SCAPE) · Northern Ireland

    Incumbent: John Graham Construction Ltd

    • Construction work
    Published value
    £500mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 8 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-03eba1
  4. Estimated end · in 285 daysLinked to a framework or DPS

    Lot 6 - Northern Ireland - Upper £7.5m - £100m

    Scape Group Limited (trading as SCAPE) · Northern Ireland

    Incumbent: McLaughlin and Harvey Limited

    • Construction work
    Published value
    £500mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 8 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-03eba2
  5. Estimated end · in 285 daysLinked to a framework or DPS

    Lot 5 - Northern Ireland - Lower £0 - £10m

    Scape Group Limited (trading as SCAPE) · Northern Ireland

    Incumbent: John Graham Construction Ltd

    • Construction work
    Published value
    £500mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 8 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-0444fb
  6. Estimated end · in 285 daysLinked to a framework or DPS

    Lot 6 - Northern Ireland - Upper £7.5m - £100m

    Scape Group Limited (trading as SCAPE) · Northern Ireland

    Incumbent: McLaughlin and Harvey Limited

    • Construction work
    Published value
    £500mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 8 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-0444fc
  7. Estimated end · in 286 daysFramework recordPanel · 2 suppliers

    Quality Trusted Solutions (QTS) Find a Tender Service Minor Works Framework - Lot 1 Minor Works

    Quality Trusted Solutions LLP · Greater London, South East England

    Panel: GD Construction Ltd, Thomas Sinden Limited

    • Construction work
    Published value
    £100mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 9 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-0373e8
  8. Ends · in 286 days

    Mine Shaft and Shallow Workings Treatment on Stowheath andLoxdale

    Wolverhampton City Council · Local authority · West Midlands

    Incumbent: Soil Engineering Geoservices Limited

    City of Wolverhampton Council (CWC) sought to appoint a contractor to undertake mineshaft treatment and remediation works at the Council-owned sites at Loxdale and Stowheath, in order to enable the sites to be brought forward for residentia…

    Published value
    £2.6minc. VAT as published
    Annual run-rate
    £1.9mpublished value ÷ term, inc. VAT
    Term
    24 Mar 2026 → 9 Aug 2027 · 1.4 yrs
    Reference
    ocds-h6vhtk-055bb8
  9. Ends · in 286 days

    Hire arrangement

    Cambridge University Hospitals NHS Foundation Trust · Central government · East of England

    Incumbent: ANDREWS SYKES GROUP PLC

    1608 -This is an extension of the existing hire arrangement and not a new goods/service requirement. A Single Tender Waiver is being raised to cover the additional five-week extension period

    Published value
    £22k
    Annual run-rate
    £22kpublished value ÷ term, exc. VAT
    Term
    10 Aug 2026 → 9 Aug 2027 · 1 yr
    Reference
    ocds-h6vhtk-06e01c
  10. Ends · in 287 daysExtension option · up to 10 Nov 2027

    Temple Marsh Landscape Works

    Medway Council · Local authority · South East England

    Incumbent: PVR Contracting Limited

    Provision of landscaping works at Temple Marsh. The contract will involve, landscaping and pathway works The Contract will be for an initial period of 1 years with an option to extend for a further period of 3 months. The maximum contract t…

    Published value
    £291k
    Annual run-rate
    £291kpublished value ÷ term, exc. VAT
    Term
    11 Aug 2026 → 10 Aug 2027 · 1 yr · up to 10 Nov 2027 with extensions
    Reference
    ocds-h6vhtk-069bef
  11. Ends · in 287 daysExtension option · up to 10 Nov 2027

    Temple Marsh River Wall Works

    Medway Council · Local authority · South East England

    Incumbent: Suttle Projects Limited

    Provision of River Wall works at Temple Marsh. The contract will involve, landscaping and pathway works The Contract will be for an initial period of 1 years with an option to extend for a further period of 3 months. The maximum contract te…

    Published value
    £239k
    Annual run-rate
    £239kpublished value ÷ term, exc. VAT
    Term
    11 Aug 2026 → 10 Aug 2027 · 1 yr · up to 10 Nov 2027 with extensions
    Reference
    ocds-h6vhtk-069bf5
  12. Ends · in 287 days

    Leodis Commercial Limited

    Great Places Housing Group · Housing · North West England

    Incumbent: LEODIS COMMERCIAL LTD

    Leodis Commercial Limited - works to Render in Sheffield Richmond Park

    Published value
    £83k
    Annual run-rate
    £42kpublished value ÷ term, exc. VAT
    Term
    11 Aug 2025 → 10 Aug 2027 · 2 yrs
    Reference
    ocds-h6vhtk-06bde8
  13. Estimated end · in 288 daysFramework record

    Spray Injection Patching - Pothole Repairs

    CORSERV LIMITED · Nationwide (UK)

    Incumbent: Velocity UK Ltd

    CORMAC Solutions Ltd is inviting tenders for spray injection patching repairs of potholes and carriageway defects across Cornwall’s highway network to the value of approximately £1.5 million per year. The programme is due to run for 36 mont…

    • Surface work for highways
    Published value
    £6.0mlargest agreement; total ceiling not published
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 11 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-03e0f3
  14. Ends · in 290 days

    Construction Works at Farnborough and Bessborough Sites, SW15 (Passivhaus)

    London Borough of Wandsworth · Local authority · Greater London

    Incumbent: Kind & Co (Builders) Ltd · Last contest: 7 bids · awarded 6% over the estimate

    Bessborough:<br/><br/>Design and Construction of 8 independent supported housing units and associated landscaping and car parking on Bessborough Road, Roehampton

    • Construction work
    Published value
    £24m
    Annual run-rate
    —start date not published
    Term
    Ends 13 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-04c90e
  15. Ends · in 290 daysExtension option

    Graig Ddu, Dinas, Tip Stabilisation

    Rhondda Cynon Taf CBC · Other public body · Wales (Cymru)

    Incumbent: Alun Griffiths (Contractors) Limited (a6 a8 a9 b3 b4 b5 c3 c4 c5 d2 d3)

    Graig Ddu Tip (RH077), Dinas, is a historical coal and quarry site within Rhondda Cynon Taff County Borough Council (RCTCBC). The site is located on the northern slopes of Mynydd Dinas above Graig Ddu Road. The purpose of the proposed works…

    Published value
    £3.6m
    Annual run-rate
    £2.3mpublished value ÷ term, exc. VAT
    Term
    19 Jan 2026 → 13 Aug 2027 · 1.6 yrs
    Reference
    ocds-h6vhtk-06e107
  16. Ends · in 290 daysExtension option · up to 15 Aug 2030

    Refurbishment of utility blocks 1 and 2 Middle Ground

    Oxfordshire County Council · Local authority · Nationwide (UK)

    Incumbent: CURTIS BUILDING SERVICES LIMITED

    Refurbishment of utility blocks 7 and 8, to include new bathrooms and kitchens, new heating, rewiring, redecoration, new flooring and associated works.

    Published value
    £107k
    Annual run-rate
    £99kpublished value ÷ term, exc. VAT
    Term
    15 Jul 2026 → 13 Aug 2027 · 1.1 yrs · up to 15 Aug 2030 with extensions
    Reference
    ocds-h6vhtk-077557
  17. Ends · in 290 days

    Works

    NOTTING HILL GENESIS · Other public body · Greater London

    Incumbent: POSH MAINTENANCE (SOUTH-EAST) LIMITED

    Building Works

    Published value
    £35k
    Annual run-rate
    £19kpublished value ÷ term, exc. VAT
    Term
    24 Sept 2025 → 13 Aug 2027 · 1.9 yrs
    Reference
    ocds-h6vhtk-078b40
  18. Estimated end · in 292 days

    Damp & Mould Remedials Contract

    Babergh District Council · Local authority · East of England

    Incumbent: Principle Construction And Maintenance Ltd · Last contest: 4 bids (4 SME)

    Babergh District Council and Mid Suffolk District Council are looking to jointly procure one Contractor for the delivery of their Damp andMould Remedial Works Contract.The estimated annual combined contract values are circa GBP250000.00 to …

    • Refurbishment work
    Published value
    £1.8m
    Annual run-rate
    —start date not published
    Term
    Estimated end 15 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-0495f2
  19. Estimated end · in 292 days

    Damp & Mould Remedial Consultancy Contract

    Babergh District Council · Local authority · East of England

    Incumbent: Compliance 100 Ltd · Last contest: 4 bids (4 SME)

    • Refurbishment work
    Published value
    £1.3m
    Annual run-rate
    —start date not published
    Term
    Estimated end 15 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-0495f2
  20. Estimated end · in 292 days

    DMNV 028 - Biochar Pyrolysis Production Plant - Ludlow

    Shropshire Council · Local authority · West Midlands

    Incumbent: Biodynamic Carbon Limited · Last contest: 2 bids (2 SME) · awarded 43% over the estimate

    This is an award notice for the design, procurement, construction, commissioning and operation and maintenance of a biomass Pyrolysis Plant. This includes the provision of instrumentation, control and automation of the equipment, civils and…

    • Construction works for power plants and heating plants
    Published value
    £1.6m
    Annual run-rate
    —start date not published
    Term
    Estimated end 15 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-046fb4
  21. Ends · in 293 daysExtension option · up to 16 Aug 2028

    Solar PV supply and installations works

    East Midlands Housing Group · Housing · East Midlands

    Incumbent: Phoenix Gas Services Ltd

    To supply and install Solar PV to social housing.

    Published value
    £2.0m
    Annual run-rate
    £2.0mpublished value ÷ term, exc. VAT
    Term
    17 Aug 2026 → 16 Aug 2027 · 1 yr · up to 16 Aug 2028 with extensions
    Reference
    ocds-h6vhtk-06e57f
  22. Ends · in 293 days

    Office Works

    North East London NHS Foundation Trust · Central government · Nationwide (UK)

    Incumbent: James Roofing & Construction Ltd

    Capital Expenditure Goodmayes Relocate Estates 1. Strip Out & Enabling Works Provide all labour, plant, supervision, access equipment and waste disposal required to complete the initial strip out and preparation works. 2. Acoustic, Fire-Rat…

    Published value
    £156k
    Annual run-rate
    £156kpublished value ÷ term, exc. VAT
    Term
    17 Aug 2026 → 16 Aug 2027 · 1 yr
    Reference
    ocds-h6vhtk-06e929
  23. Ends · in 294 days

    Replacement air conditioning unit Cavendish Road.

    Stevenage Borough Council · Local authority · East of England

    Incumbent: Pitkin and Ruddock

    Cavendish Road. Replacement air conditioning units to serve the Server Room.

    Published value
    £29k
    Annual run-rate
    £29kpublished value ÷ term, exc. VAT
    Term
    17 Aug 2026 → 17 Aug 2027 · 1 yr
    Reference
    ocds-h6vhtk-0773c1
  24. Estimated end · in 296 days

    Hawkwood Road Redevelopment - Main Build

    Bournemouth, Christchurch and Poole Council · Local authority · South West England

    Incumbent: AJC Developments (South) Ltd · Last contest: 4 bids (4 SME)

    The construction of 68 residential flats and a medical centre over three buildings, creation of a new park, bike stores, refuse bin stores, associated parking, any highway works required and all associated hard and soft landscaping at the m…

    • Construction work
    Published value
    £18m
    Annual run-rate
    —start date not published
    Term
    Estimated end 19 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-04b0da
  25. Ends · in 296 days

    Harrington Hill Primary School - Appointment of a multi disciplinary consultant to design, manage and provide contract administration

    London Borough of Hackney · Local authority · Greater London

    Incumbent: Daniel Connal LLP

    Appointment of a multi disciplinary consultant to design, manage and provide contract administration for the project to provide a safe and suitable play area to support the Council’s school reorganisation strategy.

    Published value
    £33k
    Annual run-rate
    £22kpublished value ÷ term, exc. VAT
    Term
    9 Feb 2026 → 19 Aug 2027 · 1.5 yrs
    Reference
    ocds-h6vhtk-064a1b

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months922
  2. 3–6 months574
  3. 6–12 months591
  4. 12–24 months729

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.