Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 1,951–1,975
- Estimated end · in 310 daysFramework recordPanel · 5 suppliers
FW096 Permanent Way Works Delivery Framework
Translink · Northern Ireland
Panel: ADMAN CIVIL PROJECTS LIMITED, BABCOCK RAIL LIMITED, FP McCann Ltd +2 more
- Published value
- £1largest agreement; total ceiling not published
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 2 Sept 2027 · start not published
- Reference
ocds-h6vhtk-03b0f6
- Ends · in 310 daysExtension option · up to 2 Sept 2028
Planned Investment Works Windows and Doors FY27
Your Housing Group · Housing · North West England
Incumbent: Seddon Construction Limited
YHG has a programme of planned investment works to replace windows and doors in its properties in FY27. This contract is to carry out these works at addresses in YHG's portfolio in the North West. Contingency for asbestos risk and other con…
- Published value
- £2.0minc. VAT as published
- Annual run-rate
- £2.0mpublished value ÷ term, inc. VAT
- Term
- 3 Sept 2026 → 2 Sept 2027 · 1 yr · up to 2 Sept 2028 with extensions
- Reference
ocds-h6vhtk-06fab5
- Estimated end · in 311 days
Bathrooms
Accent Group Ltd · North East England
Incumbent: CLC Contractors Ltd · Last contest: 6 bids (2 SME)
Accent Housing Ltd is seeking a contractor / contractors to deliver their Kitchen and Bathroom Replacement Planned Works in the North East Region of its portfolio.The Kitchens and Bathrooms will be procured as two separate Lots and Contract…
- Published value
- £2.0m
- Annual run-rate
- —start date not published
- Term
- Estimated end 3 Sept 2027 · start not published
- Reference
ocds-h6vhtk-046fb2
- Estimated end · in 311 days
The Provision of Loughborough University Student Accommodation (LUSA) Development
Loughborough University · Education · East Midlands
Incumbent: John Graham Construction Ltd · Last contest: 9 bids · awarded 2% over the estimate
Student accommodation consisting of circa 550 bedrooms on the Loughborough University campus.
- Published value
- £59m
- Annual run-rate
- —start date not published
- Term
- Estimated end 3 Sept 2027 · start not published
- Reference
ocds-h6vhtk-04db23
- Ends · in 311 days
Bute Dock Caisson Repairs
Llywodraeth Cymru / Welsh Government · Central government · Nationwide (UK)
Incumbent: EDWARDS DIVING SERVICES LIMITED
Welsh Government requires a specialist contractor with proven relevant experience of working in an historic dock, to design and construct repairs to the upper sections of the caisson sufficient located within the historic Cardiff Bay area w…
- Published value
- £135k
- Annual run-rate
- £105kpublished value ÷ term, exc. VAT
- Term
- 22 May 2026 → 3 Sept 2027 · 1.3 yrs
- Reference
ocds-h6vhtk-0688eb
- Estimated end · in 312 days
NA
Ministry of Justice · Central government · Nationwide (UK)
Incumbent: Galliford Try Construction Limited
- Published value
- £74m
- Annual run-rate
- —start date not published
- Term
- Estimated end 4 Sept 2027 · start not published
- Reference
ocds-h6vhtk-078df4
- Estimated end · in 312 days
Voids Works and Reactive Property Maintenance Services
B3Living · East of England
Incumbent: Topcoat Construction Ltd · Last contest: 13 bids (4 SME) · awarded at the estimate
B3Living is seeking to award a Framework Agreement for a maximum of two Suppliers for the provision of Lot 01: Voids Works and Lot 02: Reactive Property Maintenance Services as described within this Invitation to Tender (ITT): the scope wil…
- Published value
- £6.0m
- Annual run-rate
- —start date not published
- Term
- Estimated end 4 Sept 2027 · start not published
- Reference
ocds-h6vhtk-03d2d2
- Estimated end · in 312 daysFramework recordPanel · 5 suppliers
Fabrication and Machining Framework
NATIONAL NUCLEAR LABORATORY LIMITED · Nationwide (UK)
Panel: Bendall's Engineering Limited, Graham Engineering Limited, NT Precision Limited C/O Saint and Co. +2 more
Re-procurement plannedFabrication and Machining Framework
- Published value
- £4.0mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 4 Sept 2027 · start not published
- Reference
ocds-h6vhtk-031f61
- Ends · in 312 days
QQ26030 - Weddell Wynd Fencing
Wolverhampton City Council · Local authority · West Midlands
Incumbent: J P LANDSCAPES & CONSTRUCTION LIMITED
Installation of steel boundary fencing and a single heavy duty steel vehicle barrier.
- Published value
- £36k
- Annual run-rate
- £32kpublished value ÷ term, exc. VAT
- Term
- 27 Jul 2026 → 4 Sept 2027 · 1.1 yrs
- Reference
ocds-h6vhtk-06b4c2
- Estimated end · in 314 days
Homes Improvement and Energy Retrofit programme 2023-2028
City of York Council · Local authority · Nationwide (UK)
Incumbent: BM Services · Last contest: 8 bids
The Works comprise home improvement works and energy efficiency retrofit work including but not limited to: • Surveying for works including relevant Asbestos and EPC surveys • Bathroom Upgrade/Modifications • Kitchen Upgrade/Modifications •…
- Published value
- £15m
- Annual run-rate
- —start date not published
- Term
- Estimated end 6 Sept 2027 · start not published
- Reference
ocds-h6vhtk-039381
- Estimated end · in 314 days
Homes Improvement and Energy Retrofit programme 2023-2028
City of York Council · Local authority · Nationwide (UK)
Incumbent: Urban Construction Interiors Ltd · Last contest: 8 bids
The Works comprise home improvement works and energy efficiency retrofit work including but not limited to: • Surveying for works including relevant Asbestos and EPC surveys • Bathroom Upgrade/Modifications • Kitchen Upgrade/Modifications •…
- Published value
- £15m
- Annual run-rate
- —start date not published
- Term
- Estimated end 6 Sept 2027 · start not published
- Reference
ocds-h6vhtk-039381
- Estimated end · in 314 days
Contract
Choice Housing · Northern Ireland
Incumbent: MCCUSKER CONTRACTS · Last contest: 7 bids (1 SME) · awarded 3% under the estimate
Choice Housing wishes to appoint an experienced and qualified contractor to carry out Multi Element Improvement (MEI) works to Fitzroy Court, Belfast. The full details of the works are outlined in the tender documents.
- Published value
- £2.1m
- Annual run-rate
- —start date not published
- Term
- Estimated end 6 Sept 2027 · start not published
- Reference
ocds-h6vhtk-047bce
- Ends · in 314 days
COV - Baginton Fields Expansion - Main contractor
Coventry City Council · Local authority · West Midlands
Incumbent: Jeakins Weir Limited · Last contest: awarded 15% over the estimate
Expansion project to include new build, demolition and reprovision of hydrotherapy pool, and refurbishment elements to existing school building
- Published value
- £8.5m
- Annual run-rate
- £5.1mpublished value ÷ term, exc. VAT
- Term
- 5 Jan 2026 → 6 Sept 2027 · 1.7 yrs
- Reference
ocds-h6vhtk-0513f7
- Ends · in 314 days
COV - Baginton Fields Expansion - Main contractor
Coventry City Council · Local authority · West Midlands
Incumbent: Jeakins Weir Limited
Expansion project to include new build, demolition and reprovision of hydrotherapy pool, and refurbishment elements to existing school building
- Published value
- £8.5m
- Annual run-rate
- £5.1mpublished value ÷ term, exc. VAT
- Term
- 5 Jan 2026 → 6 Sept 2027 · 1.7 yrs
- Reference
ocds-h6vhtk-06636d
- Ends · in 314 days
Major Roads-Carriageway Resurfacing Works Contract 2026-2027
Reading Borough Council · Local authority · South East England
Incumbent: O'HARA BROS. SURFACING LIMITED
Major Roads - Carriageway Resurfacing Worksincluding: i) Traffic Management ii) Removal and Disposal iii) Existing Utility and Drainage Covers iv) Surfacing v) Road Markings vi) Existing Drainage
- Published value
- £1.8m
- Annual run-rate
- £1.8mpublished value ÷ term, exc. VAT
- Term
- 7 Sept 2026 → 6 Sept 2027 · 1 yr
- Reference
ocds-h6vhtk-06a733
- Ends · in 314 days
Solway Community School - Partial Roof Replacement
Cumberland Council · Local authority · North West England
Incumbent: Roland Hill (Parsonby) Limited
Capital Works Framework Cumberland - Lot 1 - To undertake the over roofing of Roofs 3, 9 , 5 and 6 as shown on the attached roof layout plan. To be carried out in 3 phases as note below: • Phase 1 - Roofs 3 and 9 20th July to the 31st Augus…
- Published value
- £720k
- Annual run-rate
- £632kpublished value ÷ term, exc. VAT
- Term
- 18 Jul 2026 → 6 Sept 2027 · 1.2 yrs
- Reference
ocds-h6vhtk-06df18
- Ends · in 314 daysExtension option · up to 31 Mar 2028
CBC-2090-Q-SM New replacement roof on main farmhouse detached
Central Bedfordshire Council · Local authority
Incumbent: GB Construction (Herts) Limited
Central Bedfordshire Council has awarded a contract for the replacement of the roof to a detached main farmhouse. The works include the removal of the existing roof covering and associated materials, installation of the replacement roofing …
- Published value
- £32k
- Annual run-rate
- £32kpublished value ÷ term, exc. VAT
- Term
- 11 Sept 2026 → 6 Sept 2027 · 1 yr · up to 31 Mar 2028 with extensions
- Reference
ocds-h6vhtk-06f7be
- Ends · in 315 daysExtension option · up to 6 Sept 2028
HAR6188 Remaining structural strengthening works and External Wall System installation
Tower Hamlets · Local authority · Nationwide (UK)
Incumbent: Wates Property Services Ltd
This contract is to complete the remaining structural strengthening works and External Wall System Installation to two existing occupied High-Risk Blocks within Tower Hamlets. External Wall Installation works originally started on site in F…
- Published value
- £113m
- Annual run-rate
- £84mpublished value ÷ term, exc. VAT
- Term
- 7 May 2026 → 7 Sept 2027 · 1.3 yrs · up to 6 Sept 2028 with extensions
- Reference
ocds-h6vhtk-0687da
- Ends · in 315 daysPanel · 2 suppliers
CTrap for North West: Equipment for Visualization of Single Molecular Biomolecular Dynamics for Biosciences
UNIVERSITY OF LANCASTER · Education · North West England
Panel: Lumicks B.V, Lunicks B.V
This procurement is being undertaken via a single-source route due to the unique technical capabilities of the C-Trap® Dymo 300 and the exclusive rights held by its manufacturer, LUMICKS B.V.
- Published value
- £1.0minc. VAT as published
- Annual run-rate
- —panel, not one supplier
- Term
- 8 Sept 2025 → 7 Sept 2027 · 2 yrs
- Reference
ocds-h6vhtk-058c4a
- Estimated end · in 316 days
Bathroom - East
Accent Group Ltd · Yorkshire and the Humber, East Midlands, East of England, South East England
Incumbent: CLC Contractors Ltd · Last contest: 8 bids (8 SME)
Accent Housing Ltd is seeking a contractor or contractors to deliver Bathroom Replacement Planned Works in the East, South and Yorkshire Regions of its portfolio.The opportunity will be procured as three seperate Lots with no limit being pl…
- Published value
- £1.5m
- Annual run-rate
- —start date not published
- Term
- Estimated end 8 Sept 2027 · start not published
- Reference
ocds-h6vhtk-046f2a
- Estimated end · in 316 days
Bathrooms - South
Accent Group Ltd · Yorkshire and the Humber, East Midlands, East of England, South East England
Incumbent: IAN WILLIAMS · Last contest: 5 bids (3 SME)
Accent Housing Ltd is seeking a contractor or contractors to deliver Bathroom Replacement Planned Works in the East, South and Yorkshire Regions of its portfolio.The opportunity will be procured as three seperate Lots with no limit being pl…
- Published value
- £1.5m
- Annual run-rate
- —start date not published
- Term
- Estimated end 8 Sept 2027 · start not published
- Reference
ocds-h6vhtk-046f2a
- Estimated end · in 316 days
Bathrooms - Yorkshire
Accent Group Ltd · Yorkshire and the Humber, East Midlands, East of England, South East England
Incumbent: IAN WILLIAMS · Last contest: 5 bids (3 SME)
Accent Housing Ltd is seeking a contractor or contractors to deliver Bathroom Replacement Planned Works in the East, South and Yorkshire Regions of its portfolio.The opportunity will be procured as three seperate Lots with no limit being pl…
- Published value
- £1.5m
- Annual run-rate
- —start date not published
- Term
- Estimated end 8 Sept 2027 · start not published
- Reference
ocds-h6vhtk-046f2a
- Estimated end · in 316 days
Communal Electrical Supply
London Borough of Hackney · Local authority · Greater London
Incumbent: RGE Services Ltd · Last contest: 5 bids (5 SME)
To renew, upgrade or extend lateral mains to 250 blocks already identified out of a stock of 2,899 blocks. To test and inspect landlord's supplies as directed.
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Estimated end 8 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02fa75
- Ends · in 316 days
Carpet and Floor Coverings Supply and Fit
mhs homes group · Other public body · South East England
Incumbent: HOME DIRECT CARPETS LIMITED
Provisions of Carpet and Floor Coverings Supply and Fit
- Published value
- £50k
- Annual run-rate
- £51kpublished value ÷ term, exc. VAT
- Term
- 14 Sept 2026 → 8 Sept 2027 · 1 yr
- Reference
ocds-h6vhtk-07761c
- Estimated end · in 318 daysFramework record
LUF Bulwell Town Centre Scheme
Nottingham City Council · Local authority · East Midlands
Incumbent: WILLMOTT DIXON LIMITED
Nottingham City Council has awarded a call-off contract for the delivery of LUF Bulwell Town Centre Scheme under the SCAPE National Construction Framework. The contract includes pre-construction services, CDP development, construction works…
- Published value
- £16mlargest agreement; total ceiling not published
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 10 Sept 2027 · start not published
- Reference
ocds-h6vhtk-0781ca
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.