- Estimated end · in 124 days
Grid Emulation System
Offshore Renewable Energy Catapult · North East England
Incumbent: EGSTON Power Electronics GmbH · Last contest: 2 bids (0 SME)
ORE Catapult is looking to procure a Grid Emulation System to be used in the soon to be developed Technology Demonstration Centre (TDC). This new centre will house a wind tunnel, tribology laboratory, 1MW drivetrain test rig and the new Gri…
- Published value
- £2.0m
- Annual run-rate
- —start date not published
- Term
- Estimated end 28 Feb 2027 · start not published
- Reference
ocds-h6vhtk-038b35
- Ends · in 124 days
Provision of pressure tolerant battery module assembly
National Oceanography Centre · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: KIRKPACE LIMITED T/A DMS Technologies
We require the purchase of approximately 40 pressure‑tolerant battery modules to support the build and operation of the Autosub5 platform. These batteries are specialist components designed for subsea use, and their correct assembly is crit…
- Published value
- £40kinc. VAT as published
- Annual run-rate
- £40kpublished value ÷ term, inc. VAT
- Term
- 2 Mar 2026 → 28 Feb 2027 · 1 yr
- Reference
ocds-h6vhtk-065745
- Ends · in 125 days
Supply of Diamond-II Storage Ring Sextupole Magnets
DIAMOND LIGHT SOURCE LIMITED · South East England
Incumbent: Danfysik A/S · Last contest: 6 bids
Located on the Harwell Science and Innovation Campus in Oxfordshire, Diamond Light Source (DLS) is a leading-edge facility for science, engineering and innovation. Diamond allows researchers from academia and industry to investigate the str…
- Published value
- €6,343,700
- Annual run-rate
- —not a GBP value
- Term
- Ends 1 Mar 2027 · start not published
- Reference
ocds-h6vhtk-044859
- Ends · in 126 days
The Triad Reinstatement of Fire Alarm
Sefton Council · Local authority · North West England
Incumbent: PROTEC FIRE DETECTION PUBLIC LIMITED COMPANY
The Triad Reinstatement of Fire Alarm (March 2026 - March 2027).
- Published value
- £60k
- Annual run-rate
- £60kpublished value ÷ term, exc. VAT
- Term
- 2 Mar 2026 → 2 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-065d4d
- Ends · in 127 days
Switchgear Replacements at Hay Mills Fire Station
West Midlands Fire and Rescue Authority · Police & fire · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Midwest Mechanical and Electrical Services Limited
Hay Mills Fire Station - Carry out Switchgear replacement
- Published value
- £63kinc. VAT as published
- Annual run-rate
- —not computed
- Term
- 5 Sept 2026 → 3 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-077ca6
- Ends · in 130 days
Purchase of maskless laser lithography system
Cardiff University · Education · Nationwide (UK), Wales (Cymru)
Incumbent: Raith GmbH
The Institute for Compound Semiconductors (ICS) intends to procure a maskless laser lithography system to support essential expansion of its capability
- Published value
- €478,290
- Annual run-rate
- —not a GBP value
- Term
- 5 Mar 2026 → 6 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-061176
- Estimated end · in 131 days
Contract
Department of Finance · Northern Ireland
Incumbent: TRANSPORT SUPPLIES N.I. LTD · Last contest: 3 bids (1 SME)
This contract will be for the supply and delivery of motor vehicle, motor cycle and plant batteries to various locations throughout Northern Ireland Vehicle Batteries for a term of 4 years. The anticipated commencement date shall be 1st Apr…
- Published value
- £2.4m
- Annual run-rate
- —start date not published
- Term
- Estimated end 7 Mar 2027 · start not published
- Reference
ocds-h6vhtk-039a02
- Estimated end · in 134 daysFramework recordPanel · 15 suppliers
Material Supply and Associated Services
Procurement for Housing · Nationwide (UK), South East England
Panel: AKW Medi-Care Ltd, City Electrical Factors Limited, City Plumbing Supplies Holdings Limited +12 more
- Published value
- £1.4bnpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 10 Mar 2027 · start not published
- Reference
ocds-h6vhtk-038632
- Estimated end · in 141 days
UKRI-4082 Design Supply Deliver and Commission of Split Pair 10Tesla Superconducting Magnetic System
UK Research and Innovation · South East England
Incumbent: Oxford Instruments Nanotechnology Tools Limited · Last contest: 1 bid · awarded 8% over the estimate
Design, Supply, Deliver and Commission of split pair 10 Tesla superconducting magnet system with vertical field orientation, horizontal neutron translucent windows at field centre and a top loading NW50 bore sample tube.
- Published value
- £863k
- Annual run-rate
- —start date not published
- Term
- Estimated end 17 Mar 2027 · start not published
- Reference
ocds-h6vhtk-04b399
- Ends · in 142 days
Passive Superconducting 3rd Harmonic RF Cavity for Diamond-II
DIAMOND LIGHT SOURCE LIMITED · South East England
Incumbent: Shanghai Shetmil-Cas International Limited · Last contest: 2 bids (1 SME)
Located on the Harwell Science and Innovation Campus in Oxfordshire, Diamond Light Source (DLS) is a leading-edge facility for science, engineering and innovation. Diamond allows researchers from academia and industry to investigate the str…
- Published value
- £1.9m
- Annual run-rate
- —start date not published
- Term
- Ends 18 Mar 2027 · start not published
- Reference
ocds-h6vhtk-04365a
When contracts end · Electrical machinery i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
215 contracts and agreements end within 24 months, 325 in total · £65m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.