Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 701–800
- Ends · in 64 days
CSP27896 - Roof refurbishment works
UK Research and Innovation · Central government · Nationwide (UK)
Incumbent: REEDA SAFETY LIMITED
***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded following a limited competition procurement exercise. Contract details notice for the supply of Roof refurbishment works to R70 Do…
- Published value
- £46k
- Annual run-rate
- —term under 6 months
- Term
- 30 Sept 2026 → 30 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-077e31
- Ends · in 64 days
Replacement of street Furniture in Hunstanton
Borough Council of King's Lynn & West Norfolk · Local authority · East of England
Incumbent: Broxap Limited
Purchase of posts & railings to replace existing corroded/damaged posts in the Hunstanton Resort area
- Published value
- £27k
- Annual run-rate
- —term under 6 months
- Term
- 24 Oct 2026 → 30 Dec 2026 · 2 months
- Reference
ocds-h6vhtk-078fc6
- Ends · in 65 daysFramework recordPanel · 21 suppliers
SUPPLY AND DELIVERY OF HOUSING TECHNICAL, HOUSING REPAIR OPERATIONS LOT 1 GENERAL BUILDING ONLY
Caerphilly County Borough Council · Local authority · Wales (Cymru)
Panel: A P WATERS BUILDING CONTRACTORS LTD, ARC CONTRACTING LTD, County Home Improvements +18 more
- Published value
- £17mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 31 Dec 2026 · start not published
- Reference
ocds-h6vhtk-0449e6
- Ends · in 65 daysFramework record
Construction of Causeway Green Primary School
Sandwell Metropolitan Borough Council · Local authority · West Midlands
Incumbent: Tilbury Douglas Construction Limited
- Published value
- £15mpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Ends 31 Dec 2026 · start not published
- Reference
ocds-h6vhtk-04a69c
- Ends · in 65 days
The supply and installation of domestic LD1 & LD2 and Environmental Sensors
Swindon Borough Council · Local authority · South West England
Incumbent: Surserve Fire and Electrical Limited · Last contest: 3 bids (2 SME)
LD1 and LD2 Residential Property Retrofit Programme Swindon Borough Council invites expressions of interest from suitably qualified and experienced service providers for the provision of LD1 and LD2 Residential Property Retrofit Programme w…
- Published value
- £11m
- Annual run-rate
- —start date not published
- Term
- Ends 31 Dec 2026 · start not published
- Reference
ocds-h6vhtk-03e29a
- Ends · in 65 daysFramework record
Framework Agreement for the delivery of Countryside Services and Works
Durham County Council · Local authority · North East England
Incumbent: Seymour Civil Engineering Contractors Limited
- Published value
- £3.0mpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Ends 31 Dec 2026 · start not published
- Reference
ocds-h6vhtk-037deb
- Ends · in 65 days
Appointment of Building Contractor for Levelling Up Project at Malvern Theatre, Grange Road, Malvern
Malvern Hills District Council · Local authority · West Midlands
Incumbent: Speller Metcalfe Malvern Limited · Last contest: 1 bid (0 SME)
Malvern Hills District Council is looking to appoint a Building Contractor for Levelling Up Funded Project at Malvern Theatre, Grange Road Malvern.
- Published value
- £2.2m
- Annual run-rate
- —start date not published
- Term
- Ends 31 Dec 2026 · start not published
- Reference
ocds-h6vhtk-04b1fa
- Ends · in 65 days
Cyclical Decorations Programme (Leaseholders)
VIVID Housing Ltd · Other public body · South East England, South West England
Incumbent: IAN WILLIAMS · Last contest: awarded at the estimate
Cyclical decorations, minor repairs and communal flooring replacement across VIVID's leaseholder properties.
- Published value
- £850k
- Annual run-rate
- £1.5mpublished value ÷ term, exc. VAT
- Term
- 5 Jun 2026 → 31 Dec 2026 · 7 months
- Reference
ocds-h6vhtk-05db24
- Ends · in 65 days
TWBC - Benhall Mill Road Parks Depot
Tunbridge Wells Borough Council · Local authority · South East England
Incumbent: AMMCASS CONSTRUCTION ENGINEERING GROUP LIMITED · Last contest: awarded at the estimate
Tunbridge Wells Borough Council (TWBC) is looking to complete the refurbishment of the existing crematorium depot building and construction of a new garage for the housing of machinery, in accordance with the design information contained in…
- Published value
- £638kinc. VAT as published
- Annual run-rate
- —not computed
- Term
- 14 Jul 2026 → 31 Dec 2026 · 6 months
- Reference
ocds-h6vhtk-05fd40
- Ends · in 65 days
Replacement of Communal Doors & Obsolete Door Entry Systems
CALICO HOMES LIMITED · Other public body · North West England
Incumbent: Security Surveillance Systems Ltd (T/A SS Group Ltd)
The provision of 46 replacement communal doors and 64 obsolete door entry systems for Calico Homes. The programme will improve safety, security and operational control within communal areas.
- Published value
- £597kinc. VAT as published
- Annual run-rate
- £1.2mpublished value ÷ term, inc. VAT
- Term
- 1 Jul 2026 → 31 Dec 2026 · 6 months
- Reference
ocds-h6vhtk-078e8e
- Ends · in 65 days
Mount Edgcumbe Garden Battery Refurbishment
Plymouth City Council · Local authority · South West England
Incumbent: TEC CONSTRUCTION (HOLDINGS) LTD
Refurbishment and renovation of Mount Edgcumbe Garden Battery and associated works
- Published value
- £589k
- Annual run-rate
- —not computed
- Term
- 6 Jul 2026 → 31 Dec 2026 · 6 months
- Reference
ocds-h6vhtk-06ccde
- Ends · in 65 days
Midland Metro Limited (MML) - Low-level Surfacing Works at Winson Green LR030
West Midlands Combined Authority · Local authority · West Midlands
Incumbent: Haigh Rail Limited
Midland Metro Limited (MML) are are awarding a Works Contract for the Provision of Low-Level Surfacing Works at Winson Green Tram Stop under a Call-Off Order utilising the MML Single Supplier Track Framework Agreement.
- Published value
- £545k
- Annual run-rate
- £573kpublished value ÷ term, exc. VAT
- Term
- 19 Jan 2026 → 31 Dec 2026 · 11 months
- Reference
ocds-h6vhtk-066411
- Ends · in 65 days
UKRI-6336 - Fire Stopping and Fire Door Remedials
UK Research and Innovation · Central government · Nationwide (UK)
Incumbent: Airport Facilities (Maintenance) Ltd
The Provision of Fire Stopping and Fire Door Remedials
- Published value
- £500k
- Annual run-rate
- —term under 6 months
- Term
- 15 Oct 2026 → 31 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-077f23
- Ends · in 65 days
Construction of a cemetery extension
Bracknell Forest Council · Local authority · South East England
Incumbent: White Horse Contracting Ltd · Last contest: awarded 13% under the estimate
To provide works to convert land currently laid out for golf purposes in to a suitable cemetery, including all relevant ground works, roads, footpaths, planting, access/egress and associated requirements as per the instructions laid out wit…
- Published value
- £433k
- Annual run-rate
- —not computed
- Term
- 13 Jul 2026 → 31 Dec 2026 · 6 months
- Reference
ocds-h6vhtk-06140d
- Ends · in 65 days
NUN – Lot 1 Coronation Walk Lot 2 Sandon Park footpath/cycleway
Nuneaton and Bedworth Borough Council · Local authority · West Midlands
Incumbent: Ground Control Limited
Nuneaton and Bedworth Borough Council’s Parks and Greenspace team have a remit to improve and maintain play and recreation facilities throughout the Borough.Utilising capital budgets these Green Spaces will receive tarmacked footpath/cyclew…
- Published value
- £427k
- Annual run-rate
- £536kpublished value ÷ term, exc. VAT
- Term
- 16 Mar 2026 → 31 Dec 2026 · 10 months
- Reference
ocds-h6vhtk-0594a0
- Ends · in 65 days
Darrenlas Primary WC Refurb 2026
Rhondda Cynon Taf CBC · Other public body · Wales (Cymru)
Incumbent: V3 Facilities Management Limited
Darrenlas Primary WC Refurb 2026
- Published value
- £395k
- Annual run-rate
- £703kpublished value ÷ term, exc. VAT
- Term
- 10 Jun 2026 → 31 Dec 2026 · 7 months
- Reference
ocds-h6vhtk-06b451
- Ends · in 65 days
Fire Strategy Improvements - Batch 17
Bath & North East Somerset Council · Local authority · South West England
Incumbent: NKS Contracts Limited
The Provision of Fire Strategy Improvements for 17no. Batch D Properties. Tendered sum ££369,445.26 exc vat
- Published value
- £369k
- Annual run-rate
- —term under 6 months
- Term
- 3 Aug 2026 → 31 Dec 2026 · 5 months
- Reference
ocds-h6vhtk-06e4bc
- Ends · in 65 days
St Day & Carharrack Community School - SEND Programme
Cornwall Council · Local authority · Nationwide (UK)
Incumbent: Cygnus Contracting Ltd
St Day & Carharrack Community School - SEND Expansion Programme 2026
- Published value
- £354k
- Annual run-rate
- —term under 6 months
- Term
- 19 Aug 2026 → 31 Dec 2026 · 4 months
- Reference
ocds-h6vhtk-0781e9
- Ends · in 65 days
PCH Roof Sealant Replacement
Corporate Officer of the House of Commons · Central government · Greater London
Incumbent: Saltash Construction
Repair works to the sealant of the roof in Portcullis House.
- Published value
- £313k
- Annual run-rate
- £407kpublished value ÷ term, exc. VAT
- Term
- 26 Mar 2026 → 31 Dec 2026 · 9 months
- Reference
ocds-h6vhtk-068527
- Ends · in 65 days
Tillingbourne to Good (Shalford Mill fish passage)
ENVIRONMENT AGENCY · Other public body · South East England
Incumbent: Environment Agency
The improvement of fish passage along the Tillingbourne river corridor.
- Published value
- £300k
- Annual run-rate
- £368kpublished value ÷ term, exc. VAT
- Term
- 9 Mar 2026 → 31 Dec 2026 · 10 months
- Reference
ocds-h6vhtk-068fd3
- Ends · in 65 days
-Vantive Water Treatment Plant – Installation, Commissioning
Imperial College Healthcare NHS Trust · Central government
Incumbent: Vantive Limited
Supply, installation, commissioning and handover of supporting equipment and infrastructure for the Vantive CWP800 reverse-osmosis water treatment system at Northwick Park Hospital, supporting the renal dialysis service. The works include a…
- Published value
- £289k
- Annual run-rate
- —term under 6 months
- Term
- 1 Dec 2026 → 31 Dec 2026 · 31 days
- Reference
ocds-h6vhtk-078a69
- Ends · in 65 daysExtension option · up to 30 Jun 2027
CAR PARK REPAIRS - WHARF ROAD ALL LEVELS
South Kesteven District Council · Local authority · East Midlands
Incumbent: KILNBRIDGE STRUCTURAL SERVICES LTD · Last contest: awarded 11% under the estimate
The works consist of redecoration and sundry remedial repair works to all Levels of the Wharf Road car park to satisfy dilapidation obligations. The car park will generally remain in operation during the works. Particular attention is to be…
- Published value
- £267k
- Annual run-rate
- —term under 6 months
- Term
- 3 Aug 2026 → 31 Dec 2026 · 5 months · up to 30 Jun 2027 with extensions
- Reference
ocds-h6vhtk-067223
- Ends · in 65 daysExtension option · up to 30 Jun 2027
BAS - Essential Electrical Upgrade works
UK Research and Innovation · Central government · East of England
Incumbent: Leeton Electrical Ltd
UKRI has appointed a supplier for the provision of Essential Electrical Upgrade works to the BAS site.
- Published value
- £266k
- Annual run-rate
- £503kpublished value ÷ term, exc. VAT
- Term
- 22 Jun 2026 → 31 Dec 2026 · 6 months · up to 30 Jun 2027 with extensions
- Reference
ocds-h6vhtk-06b91e
- Ends · in 65 days
Design & Build of Portal Frame Store NorthBridge
City of Doncaster Council · Local authority · Yorkshire and the Humber
Incumbent: Claywood Construction Ltd · Last contest: awarded 12% under the estimate
The Council is inviting you to tender for Design, Manufacture & Construction of a new materials store at the Northbridge Depot, Doncaster, DN5 9AN
- Published value
- £262k
- Annual run-rate
- £377kpublished value ÷ term, exc. VAT
- Term
- 22 Apr 2026 → 31 Dec 2026 · 8 months
- Reference
ocds-h6vhtk-060cd1
- Ends · in 65 days
Lift Replacement
Moat Homes Limited · Charity · Greater London, South East England
Incumbent: ASPECT LIFTS LTD
- Published value
- £256k
- Annual run-rate
- £459kpublished value ÷ term, exc. VAT
- Term
- 11 Jun 2026 → 31 Dec 2026 · 7 months
- Reference
ocds-h6vhtk-06b2d1
- Ends · in 65 days
Sedgley Park Roofing Works
Greater Manchester Combined Authority · Local authority · North West England
Incumbent: Argyle North West Construction Limited
Following a Leak Detection Roof Report conducted by an independent Contractor, the report has identified a substantial number of defects across 8 separate roofing segments at Greater Manchester Police's Sedgley Park Training Complex that ne…
- Published value
- £250k
- Annual run-rate
- £390kpublished value ÷ term, exc. VAT
- Term
- 12 May 2026 → 31 Dec 2026 · 8 months
- Reference
ocds-h6vhtk-06a741
- Ends · in 65 days
Blade Repairs
ORE Catapult · Other public body · Scotland
Incumbent: DHR Blades Ltd
This award is to appoint a blade repair provider for LDT's Blade C based on estimate repair for 8 weeks (24 hour working period) plus materials and equipment hire. Schedules of rates were requested from three blade repair companies.
- Published value
- £250kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 23 Oct 2026 → 31 Dec 2026 · 2 months
- Reference
ocds-h6vhtk-078c5b
- Ends · in 65 days
Re-roofing concrete tile/artificial slate / Fascia/soffit
Housing 21 · Central government · Yorkshire and the Humber
Incumbent: Innercity roofing (Yorkshire) Ltd
Re-roofing concrete tile/artificial slate / Fascia/soffit at Brough Court.
- Published value
- £214k
- Annual run-rate
- —term under 6 months
- Term
- 5 Oct 2026 → 31 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-06e46c
- Ends · in 65 days
Fire Panel Upgrades and Detector Upgrades
National Oceanography Centre · Other public body · South East England
Incumbent: Premier Fire Security Ltd
The contract covers the replacement and upgrade of the National Oceanography Centre's fire alarm infrastructure, including the replacement of fire alarm control panels, repeater panels, backup batteries, power supplies, and field devices ac…
- Published value
- £196k
- Annual run-rate
- —term under 6 months
- Term
- 3 Sept 2026 → 31 Dec 2026 · 4 months
- Reference
ocds-h6vhtk-06d33b
- Ends · in 65 days
NGH - Maternity Bereavement Suite
Northampton General Hospital NHS Trust · Central government · East Midlands
Incumbent: J.E.T Construction (Milton Keynes) Limited
Please note there are some changes to the works comprised in contract (Section A. 1.01) which states: ‘The scope of work comprises: The demolition of a redundant timber framed staff changing and storage block and the construction of a new p…
- Published value
- £194k
- Annual run-rate
- —term under 6 months
- Term
- 28 Sept 2026 → 31 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-068ad7
- Ends · in 65 days
UKRI-5929 1894 Building West Tower Internal Strip Out
UK Research and Innovation · Central government · Scotland
Incumbent: Navigate Scaffolding Ltd
Undertaking the strip out works within the West Tower of the 1894 Building, including the design, installation, and dismantling of specialist internal scaffolding required to facilitate the removal of the circular staircase.
- Published value
- £187k
- Annual run-rate
- —term under 6 months
- Term
- 24 Sept 2026 → 31 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-066c12
- Ends · in 65 days
Paul Street Public Convenience Upgrades
Taunton Town Council · Local authority · South West England
Incumbent: KARESA CONSTRUCTION LTD
Taunton Town Council are looking for a high quality solution from high quality bidders that is clearly focused on the needs of the Town Council's residents. Taunton Town Council is open to creative and innovative ideas. The appointed contra…
- Published value
- £180k
- Annual run-rate
- £202kpublished value ÷ term, exc. VAT
- Term
- 10 Feb 2026 → 31 Dec 2026 · 11 months
- Reference
ocds-h6vhtk-04fa41
- Ends · in 65 days
Contract for Extension Works at 134 Vale Avenue, Brighton
Brighton and Hove City Council · Local authority · South East England
Incumbent: BCS Robertson Ltd
Brighton and Hove City Council is seeking quotations from suitably qualified suppliers for the provision of a two-storey side extension and associated internal and external works at 134 Vale Avenue, Brighton, BN1 8YF. The contract will be f…
- Published value
- £175k
- Annual run-rate
- —term under 6 months
- Term
- 20 Jul 2026 → 31 Dec 2026 · 5 months
- Reference
ocds-h6vhtk-06ce09
- Ends · in 65 days
Star Square Development-Ainsworth Street Works
Blackburn With Darwen Borough Council · Local authority · North West England
Incumbent: Bethell Construction Ltd
Surface Water Drainage Diversion Works for Star Square development
- Published value
- £165k
- Annual run-rate
- —term under 6 months
- Term
- 18 Sept 2026 → 31 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-077fe2
- Ends · in 65 days
Separation of units at Portside, Avonmouth
Staffordshire County Council · Local authority · South West England
Incumbent: HILLS CONSTRUCTION (SOUTH WEST) LIMITED
Construction works to split units 1 & 2 Portside Park, Kings Weston Lane, Avonmouth, into separate units.
- Published value
- £160k
- Annual run-rate
- —term under 6 months
- Term
- 10 Sept 2026 → 31 Dec 2026 · 4 months
- Reference
ocds-h6vhtk-06f8b3
- Ends · in 65 days
Contract for the Execution of External Insulation Cladding and Render System, Penlan, Swansea.
City & County of Swansea · Local authority · Wales (Cymru)
Incumbent: SAM DRYLINING LIMITED
To comply with the current WHQS, works will include the application of insulated render system as detailed in the specification/Works Information. The project details are set out in The Contract Data. Site of the Works Phase 2 – Properties …
- Published value
- £150k
- Annual run-rate
- £256kpublished value ÷ term, exc. VAT
- Term
- 1 Jun 2026 → 31 Dec 2026 · 7 months
- Reference
ocds-h6vhtk-06763c
- Ends · in 65 days
Greenbank school 2026
Cheshire west and Chester Borough Council · Education · North West England
Incumbent: Skyline Property Solutions Limited
construction work at Greenbank School, Northwich
- Published value
- £145kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 22 Sept 2026 → 31 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-077702
- Ends · in 65 days
Contract for Roofing Works
City & County of Swansea · Local authority · Wales (Cymru)
Incumbent: Glamorgan Services Limited · Last contest: awarded 2% over the estimate
Contract for the Execution of Re-roofing of Pitched Roofs to 20 properties at Heol Gwyrosydd, Linsdale Road, Llangrose Road, Morlais Road, Pensalam Road, Eidden Road and Pen Y Mor, Penlan, Swansea.
- Published value
- £143k
- Annual run-rate
- £156kpublished value ÷ term, exc. VAT
- Term
- 2 Feb 2026 → 31 Dec 2026 · 11 months
- Reference
ocds-h6vhtk-052b3b
- Ends · in 65 days
LINAC Room Refurbishment
Guy's and St Thomas' NHS Foundation Trust · Central government · Greater London
Incumbent: CFES Ltd
The Trust has a requirement for a new a medical linear accelerator (LINAC) as part of the Large Medical Equipment Replacement Programme and enabling works are required.
- Published value
- £140k
- Annual run-rate
- £123kpublished value ÷ term, exc. VAT
- Term
- 12 Nov 2025 → 31 Dec 2026 · 1.2 yrs
- Reference
ocds-h6vhtk-066848
- Ends · in 65 days
Fire RA work - Gas and Electric 25/26
Southern Housing · Other public body · East Midlands, West Midlands, Greater London, South East England, South West England
Incumbent: BSW Heating Ltd
Fire risk assessment work - Gas and Electric 25/26
- Published value
- £140kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 21 Sept 2026 → 31 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-06e374
- Ends · in 65 days
Atrium Replacement and Remedial Works
Uttlesford District Council · Local authority · East of England
Incumbent: Evander Glazing and Locks Limited · Last contest: awarded 13% over the estimate
Uttlesford district Council is seeking to commission remedial/refurbishment works to the glazed atrium at the London Road offices, specifically the atrium over the main entrance linking the Grade II Saffron Walden building with the adjacent…
- Published value
- £138kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 21 Sept 2026 → 31 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-06b6ba
- Ends · in 65 days
Tender for Phase1River Restoration Works on Lough More Catchment supported by PEACEPLUS CALM
Armagh City Banbridge and Craigavon Borough Council · Local authority
Incumbent: ARBOR FOREST MANAGEMENT LTD
Armagh City, Banbridge and Craigavon Borough Council (“the Council”) invites Tenders from suitably experienced and qualified contractors to carry out river restoration work on the Lough More Catchment south east of Augher village in Co Tyro…
- Published value
- £131kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 5 Sept 2026 → 31 Dec 2026 · 4 months
- Reference
ocds-h6vhtk-06c79e
- Ends · in 65 days
27425 - Grave Digging for Cemetries
Plymouth City Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Duchy Cemetery's Ltd
For digging graves in 3 cemeteries in Plymouth, services commencing 01 February 2025 covering to 31 December 2026. Services to include; - Dig grave, remove surplus soil transported to waste management centre - Cover dug grave with lock down…
- Published value
- £115kinc. VAT as published
- Annual run-rate
- £61kpublished value ÷ term, inc. VAT
- Term
- 12 Feb 2025 → 31 Dec 2026 · 1.9 yrs
- Reference
ocds-h6vhtk-059c73
- Ends · in 65 days
Grave Digging Services 2026
Plymouth City Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Duchy Cemeteries
To dig graves to the requirements and the needs of the Bereavement Service and to ensure that the excavation is safe and in line with Health and Safety Standards.
- Published value
- £115k
- Annual run-rate
- £115kpublished value ÷ term, exc. VAT
- Term
- 1 Jan 2026 → 31 Dec 2026 · 1 yr
- Reference
ocds-h6vhtk-065c07
- Ends · in 65 days
Park and Dare Theatre - Cathodic Protection to Existing Masonry
Rhondda Cynon Taf CBC · Other public body · Wales (Cymru)
Incumbent: VaultStone Ltd
Park and Dare Theatre - Cathodic Protection to Existing Masonry 2026
- Published value
- £113k
- Annual run-rate
- £194kpublished value ÷ term, exc. VAT
- Term
- 2 Jun 2026 → 31 Dec 2026 · 7 months
- Reference
ocds-h6vhtk-06ecb0
- Ends · in 65 daysExtension option · up to 31 Aug 2029
Chilton School Boiler Replacement
Oxfordshire County Council · Local authority · South East England
Incumbent: CME Heating Ltd
JCT Minor works contract for the removal and replacement of Boilers at title and associated works and making good.
- Published value
- £110k
- Annual run-rate
- £82kpublished value ÷ term, exc. VAT
- Term
- 1 Sept 2025 → 31 Dec 2026 · 1.3 yrs · up to 31 Aug 2029 with extensions
- Reference
ocds-h6vhtk-065e9d
- Ends · in 65 daysExtension option · up to 31 Aug 2029
Longworth Primary Boiler Replacement
Oxfordshire County Council · Local authority · South East England
Incumbent: MECHANICAL INSTALLATION HEATING SERVICES (GLOS) LIMITED
JCT MW 2024 contract for removal, replacement, associated works and making good of gas boiler heating system at title.
- Published value
- £107k
- Annual run-rate
- £80kpublished value ÷ term, exc. VAT
- Term
- 1 Sept 2025 → 31 Dec 2026 · 1.3 yrs · up to 31 Aug 2029 with extensions
- Reference
ocds-h6vhtk-065ecf
- Ends · in 65 days
Heather Close Refurbishment (Lifts)
South London and Maudsley NHS Foundation Trust · Central government · Greater London
Incumbent: Apex Lift & Escalator Engineers Limited
The No.1 Heather Close Lift has come to its end of life and a replacement of key components are obsolete and required to be replaced for continuous service provision. The Lift replacement would also support the reconfiguration of the buildi…
- Published value
- £105k
- Annual run-rate
- £84kpublished value ÷ term, exc. VAT
- Term
- 1 Oct 2025 → 31 Dec 2026 · 1.3 yrs
- Reference
ocds-h6vhtk-055cf3
- Ends · in 65 days
To complete Flood drying out remediation measure within New Science Building
University of East Anglia · Education · East of England
Incumbent: AJS Restoration Services Ltd
Following a major flood which occurred in the New Science building on UEA campus, a supplier was suggested by the advice of an Insurance Agency to perform the remediation measures and services as a matter of urgency. This was to reduce the …
- Published value
- £100kinc. VAT as published
- Annual run-rate
- £85kpublished value ÷ term, inc. VAT
- Term
- 28 Oct 2025 → 31 Dec 2026 · 1.2 yrs
- Reference
ocds-h6vhtk-05d58d
- Ends · in 65 days
Smart Street Lighting - Network Rail - BAPA
City of Bradford Metropolitan District Council · Local authority · Yorkshire and the Humber
Incumbent: Network Rail Infrastructure
A Basic Asset Protection Agreement (BAPA) with Network Rail in order to remove the Councils lighting columns that run juxtapose to the network rail boundary, line and overheads. Awarded under Schedule 5 para 5 of the Procurement Act
- Published value
- £100k
- Annual run-rate
- £196kpublished value ÷ term, exc. VAT
- Term
- 29 Jun 2026 → 31 Dec 2026 · 6 months
- Reference
ocds-h6vhtk-06bf0a
- Ends · in 65 days
Asbestos Remedial and Make Safe Works
London Borough of Harrow · Local authority · Greater London
Incumbent: SOLO ASBESTOS CONSULTANTS LIMITED
Provision of asbestos remedial and associated make safe works, including the removal and disposal of asbestos-containing materials, environmental monitoring, ground remediation works, and urgent health and safety related remedial activities…
- Published value
- £100k
- Annual run-rate
- —term under 6 months
- Term
- 22 Sept 2026 → 31 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-0779a0
- Ends · in 65 days
W838 - Nottingham Road Cemetery Grounds Maintenance 2026
Derby City Council · Local authority · Nationwide (UK)
Incumbent: idverde Ltd
Provision of Grounds Maintenance services at Nottingham Road Cemetery for the 2026 growing season.
- Published value
- £100k
- Annual run-rate
- —term under 6 months
- Term
- 3 Aug 2026 → 31 Dec 2026 · 5 months
- Reference
ocds-h6vhtk-06f49b
- Ends · in 65 daysExtension option · up to 31 Dec 2027
Shop Fronts Improvements Fund Project at Falcon Road
London Borough of Wandsworth · Local authority
Incumbent: ALL LONDON SIGNS LIMITED
Shop front improvements in Falcon Road, Grant Road and Bramlands Close as part of the Winstanley Regeneration Plan in Clapham Junction.
- Published value
- £98k
- Annual run-rate
- —not computed
- Term
- 15 Jul 2026 → 31 Dec 2026 · 6 months · up to 31 Dec 2027 with extensions
- Reference
ocds-h6vhtk-06a244
- Ends · in 65 days
Remediation Painting Works
National Armament Director Group · Central government
Incumbent: Henderson Decorators
Painting works are required to support security accreditation activities and achieve the required wall finish in designated areas of RAF Lossiemouth
- Published value
- £97k
- Annual run-rate
- —term under 6 months
- Term
- 27 Aug 2026 → 31 Dec 2026 · 4 months
- Reference
ocds-h6vhtk-07746e
- Ends · in 65 days
Specialist Surfacing for Bus Stop Pads - Temple Way
Bristol City Council · Local authority · South West England
Incumbent: Miles Macadam Ltd
Specialist Surfacing for Bus Stop Pads - Temple Way - DN807348
- Published value
- £90k
- Annual run-rate
- £98kpublished value ÷ term, exc. VAT
- Term
- 30 Jan 2026 → 31 Dec 2026 · 11 months
- Reference
ocds-h6vhtk-06a703
- Ends · in 65 days
Fire Alarm Installation
The Royal Borough of Kingston upon Thames · Local authority · Greater London
Incumbent: THERMOSERV LIMITED
Installation of Integrated fire alarm & detection system Sobraon House
- Published value
- £90k
- Annual run-rate
- £164kpublished value ÷ term, exc. VAT
- Term
- 15 Jun 2026 → 31 Dec 2026 · 7 months
- Reference
ocds-h6vhtk-06b4c1
- Ends · in 65 days
New Crematorium Landscaping / Tree maintenance
Plymouth City Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Glendale Countryside Limited
Plymouth City Council ('The Council') would like to invite you to provide a tender for Landscaping and maintenance services in line with The Plymouth Crematorium Landscape and Ecological Management Plan (LEMP) The anticipated duration of th…
- Published value
- £85k
- Annual run-rate
- £117kpublished value ÷ term, exc. VAT
- Term
- 10 Apr 2026 → 31 Dec 2026 · 9 months
- Reference
ocds-h6vhtk-06ac22
- Ends · in 65 days
Minor Works for the Revolution 250 Exhibition
The National Archives · Central government · Greater London, South East England
Incumbent: MER Services Ltd
Build and install of onsite exhibition Revolution 250
- Published value
- £85k
- Annual run-rate
- £118kpublished value ÷ term, exc. VAT
- Term
- 13 Apr 2026 → 31 Dec 2026 · 9 months
- Reference
ocds-h6vhtk-06a612
- Ends · in 65 days
Eastney Swimming Pool Baths Demolition
Portsmouth City Council · Local authority · South East England
Incumbent: Portsmouth Demolition & Salvage Ltd
provision to demolish Eastney Swimming Pool Baths
- Published value
- £81kinc. VAT as published
- Annual run-rate
- £58kpublished value ÷ term, inc. VAT
- Term
- 7 Aug 2025 → 31 Dec 2026 · 1.4 yrs
- Reference
ocds-h6vhtk-05fdda
- Ends · in 65 days
Phase C of cycleway
Stratfield Mortimer Parish Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: RC SAUNDERS LIMITED
Phase C of the Mortimer to Burghfield Cycleway
- Published value
- £80k
- Annual run-rate
- —term under 6 months
- Term
- 1 Sept 2026 → 31 Dec 2026 · 4 months
- Reference
ocds-h6vhtk-069fef
- Ends · in 65 daysExtension option · up to 31 Dec 2029
Langford Village Primary School Boiler Replacement
Oxfordshire County Council · Local authority · South East England
Incumbent: CME Heating Ltd
Removal and replacement of boiler and associated works and making good.
- Published value
- £78k
- Annual run-rate
- £58kpublished value ÷ term, exc. VAT
- Term
- 1 Sept 2025 → 31 Dec 2026 · 1.3 yrs · up to 31 Dec 2029 with extensions
- Reference
ocds-h6vhtk-065e67
- Ends · in 65 days
UKRI-6417 NERC BAS Achive Chiller Plant Upgrade
UK Research and Innovation · Central government · East of England
Incumbent: 4 Way Refrigeration Services Ltd
Critical upgrades to the existing BAS chiller plant
- Published value
- £77k
- Annual run-rate
- —term under 6 months
- Term
- 30 Sept 2026 → 31 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-077ddb
- Ends · in 65 daysExtension option · up to 31 Jan 2027
Southwark Park Outdoor Gym Upgrade and Refurbishment
London Borough of Southwark · Local authority · Greater London
Incumbent: KOMPAN Limited
Southwark Council has undertaken a procurement exercise to appoint a suitably qualified and experienced contractor to deliver the refurbishment and enhancement of the outdoor gym facilities within Southwark Park, SE16. The project forms par…
- Published value
- £73k
- Annual run-rate
- —term under 6 months
- Term
- 1 Oct 2026 → 31 Dec 2026 · 3 months · up to 31 Jan 2027 with extensions
- Reference
ocds-h6vhtk-0783da
- Ends · in 65 days
Repair and Refurbishment to External Areas at Bill Sargent Crescent
VIVID Housing Ltd · Other public body
Incumbent: LOGIC CONTRACT SERVICES LTD (10111623) · Last contest: awarded 52% under the estimate
VIVID has employed a Principal Contractor to carry out the repair and refurbishment of external areas to Blocks 1 & 2 of flats at Bill Sargent Crescent in Portsmouth. The nature of the works include replacement of timber balcony decking, in…
- Published value
- £73k
- Annual run-rate
- —term under 6 months
- Term
- 1 Aug 2026 → 31 Dec 2026 · 5 months
- Reference
ocds-h6vhtk-067b8d
- Ends · in 65 days
Strengthening of bridge beams at Exeter Waterloo Railway bridge
National Highways Limited · Central government
Incumbent: Network Rail Infrastructure
GW5942 BAPA – Strengthening of bridge beams at Exeter Waterloo Railway bridge.
- Published value
- £72k
- Annual run-rate
- —term under 6 months
- Term
- 29 Sept 2026 → 31 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-077c83
- Ends · in 65 days
Fire Door Replacement and Remedial Works
The Royal Air Force Museum · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: VISO GROUP LTD
Fire door replacement and remedial works identified by periodic inspection
- Published value
- £71k
- Annual run-rate
- —term under 6 months
- Term
- 16 Sept 2026 → 31 Dec 2026 · 4 months
- Reference
ocds-h6vhtk-077e1e
- Ends · in 65 days
Burnham Beeches - Car Park Retaining Wall
The Mayor and Commonalty and Citizens of the City of London · Local authority
Incumbent: IBBCO Civil Engineering
Suppliers selected were deemed appropriate contractors to undertake the specified works within the Burnham Beeches Estate, possessing the necessary competence and capability, as well as the geographical proximity required to attend site.
- Published value
- £66kinc. VAT as published
- Annual run-rate
- £116kpublished value ÷ term, inc. VAT
- Term
- 8 Jun 2026 → 31 Dec 2026 · 7 months
- Reference
ocds-h6vhtk-06b730
- Ends · in 65 days
Refurbishment of Bouverie Square toilets, Folkestone
The District Council of Folkestone and Hythe · Local authority · South East England
Incumbent: KENT PLASTERING CONTRACTORS LIMITED
refurbishment of public convenience toilets x3 (gents, ladies and disabled) at Bouverie Square, Folkestone.
- Published value
- £65k
- Annual run-rate
- —term under 6 months
- Term
- 1 Sept 2026 → 31 Dec 2026 · 4 months
- Reference
ocds-h6vhtk-06e690
- Ends · in 65 days
A38 Lee Mill to Ivybridge FHS - C4s
National Highways Limited · Central government
Incumbent: Openreach
BT Openreach - A38 Lee Mill to Ivybridge FHS - C4s
- Published value
- £64k
- Annual run-rate
- —term under 6 months
- Term
- 26 Aug 2026 → 31 Dec 2026 · 4 months
- Reference
ocds-h6vhtk-06ece9
- Ends · in 65 days
Lead Mains Replacement
Gentoo Group Limited · Other public body · North East England
Incumbent: Advantage Utilities Services Limited
Procurement of a contractor to undertake works on existing lead mains replacement (Domestic cold water supply) from external water meter/isolation tap to internal stop tap. Due to leaking supply or damaged supply pipework. This is an interi…
- Published value
- £60kinc. VAT as published
- Annual run-rate
- £60kpublished value ÷ term, inc. VAT
- Term
- 1 Jan 2026 → 31 Dec 2026 · 1 yr
- Reference
ocds-h6vhtk-05f270
- Ends · in 65 days
Void cleans and clearances
The North Yorkshire Council · Local authority · Yorkshire and the Humber
Incumbent: ORBIS PROTECT LIMITED
Cleaning voids in the Selby and Harrogate areas by Orbis. To ensure properties are to lettable standards
- Published value
- £60k
- Annual run-rate
- —term under 6 months
- Term
- 24 Aug 2026 → 31 Dec 2026 · 4 months
- Reference
ocds-h6vhtk-06f5f6
- Ends · in 65 days
Remedial Repair Works to Eastern Boundary Wall at St Mary's Closed Churchyard, Henley
South Oxfordshire District Council · Local authority · South East England
Incumbent: D R Jones Yeovil Ltd · Last contest: awarded 27% under the estimate
South Oxfordshire District Council require a building Contractor, experienced in works to historic or listed structures, to carry out remedial repairs, reinforcement and localised re-pointing works to the eastern retaining boundary wall at …
- Published value
- £54k
- Annual run-rate
- —not computed
- Term
- 15 Jul 2026 → 31 Dec 2026 · 6 months
- Reference
ocds-h6vhtk-05e66d
- Ends · in 65 days
DH1438 49 Alumhurst Road Ward Kitchen Refurbishment Works
Dorset HealthCare University NHS Foundation Trust · Central government
Incumbent: Westmade Ltd
Refurbishment of the main ward Kitchen on the Perinatal unit (Florence)at 49 Alumhurst road
- Published value
- £53k
- Annual run-rate
- —term under 6 months
- Term
- 14 Nov 2026 → 31 Dec 2026 · 2 months
- Reference
ocds-h6vhtk-078d50
- Ends · in 65 days
Alexander Park
Bath & North East Somerset Council · Local authority · South West England
Incumbent: H. Mealing & Sons Limited
Alexander Park - Provision of for the Repair and Maintenance Work
- Published value
- £52k
- Annual run-rate
- —term under 6 months
- Term
- 1 Oct 2026 → 31 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-06fa78
- Ends · in 65 days
Replacement Roofing Works at Hawley Lane and Ratcliffe Road
VIVID Housing Ltd · Other public body · South East England
Incumbent: Cade Roofing and Building Services Ltd
Planned roofing replacement works carried out at Hawley Lane (30-36 Block) and Ratcliffe Road (74-80 EVENS Block), Farnborough.
- Published value
- £51k
- Annual run-rate
- —term under 6 months
- Term
- 10 Sept 2026 → 31 Dec 2026 · 4 months
- Reference
ocds-h6vhtk-06e5b7
- Ends · in 65 days
TVCA-PROC-0780 - Connected Automated Strategic Teesside Logistics Ecosystem (CASTLE) Phase 1 - autonomous vehicle charging and storage
Tees Valley Combined Authority · Local authority
Incumbent: Teesside International Airport Limited
Tees Valley Combined Authority (TVCA) (the ‘Contacting Authority’), part of the Tees Valley Combined Authority Group, have awarded a contract to supply and deliver a vehicle parking shelter, charging facilities and office facilities for Con…
- Published value
- £50k
- Annual run-rate
- £71kpublished value ÷ term, exc. VAT
- Term
- 17 Apr 2026 → 31 Dec 2026 · 9 months
- Reference
ocds-h6vhtk-068559
- Ends · in 65 days
Restoration works at Y Graig SAM, near Crickhowell, Powys
Natural Resources Wales · Other public body · Wales (Cymru)
Incumbent: iBEX Technical Access
Y Graig Scheduled Ancient Monument Restoration Work - to undertake the restoration work on key buildings (The Dairy and Bakehouse) that make up part of Y Graig Settlement SAM, in Y Graig woodland near Crickhowell.
- Published value
- £50k
- Annual run-rate
- £59kpublished value ÷ term, exc. VAT
- Term
- 25 Feb 2026 → 31 Dec 2026 · 10 months
- Reference
ocds-h6vhtk-065fb0
- Ends · in 65 days
Ashmount and St. Ebbas Flooring
Surrey and Borders Partnership NHS Foundation Trust · Central government
Incumbent: Tangent Facilities and Construction
Flooring and minor works to Ashmount and St. Ebbas sites
- Published value
- £49k
- Annual run-rate
- £97kpublished value ÷ term, exc. VAT
- Term
- 1 Jul 2026 → 31 Dec 2026 · 6 months
- Reference
ocds-h6vhtk-06cf27
- Ends · in 65 days
Crematorium Office Refurb
Cheshire west and Chester Borough Council · Local authority · North West England
Incumbent: Skyline Property Solutions Limited
refurbishment work at the crematorium office
- Published value
- £48kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 20 Jul 2026 → 31 Dec 2026 · 5 months
- Reference
ocds-h6vhtk-067c8f
- Ends · in 65 days
SSD Plantroom
West Suffolk NHS Foundation Trust · Central government · Nationwide (UK)
Incumbent: DPL Group Ltd
The proposed works has an estimated construction value of £2800,000, this includes all associated builders work in connection with BWIC, preliminaries and ancillary costs. The associated construction period is:
- Published value
- £45k
- Annual run-rate
- —term under 6 months
- Term
- 1 Aug 2026 → 31 Dec 2026 · 5 months
- Reference
ocds-h6vhtk-068af5
- Ends · in 65 days
Darrenlas Primary Roofing Works
Rhondda Cynon Taf CBC · Other public body · Wales (Cymru)
Incumbent: Davies Brothers (Wales) Ltd
Darrenlas Primary Roofing Works 2026
- Published value
- £45k
- Annual run-rate
- £77kpublished value ÷ term, exc. VAT
- Term
- 1 Jun 2026 → 31 Dec 2026 · 7 months
- Reference
ocds-h6vhtk-06b3c6
- Ends · in 65 days
Doors
EMH HOUSING & REGENERATION LIMITED · Other public body · East Midlands
Incumbent: Grosvenor ApTec
Specialist doors
- Published value
- £44k
- Annual run-rate
- £61kpublished value ÷ term, exc. VAT
- Term
- 15 Apr 2026 → 31 Dec 2026 · 9 months
- Reference
ocds-h6vhtk-068c7e
- Ends · in 65 days
A19 - Doncaster Road / Sutton Road
City of Doncaster Council · Local authority · Yorkshire and the Humber
Incumbent: Yunex Limited
Traffic signal equipment for the above junction.
- Published value
- £40k
- Annual run-rate
- £42kpublished value ÷ term, exc. VAT
- Term
- 19 Jan 2026 → 31 Dec 2026 · 11 months
- Reference
ocds-h6vhtk-060cce
- Ends · in 65 days
Groundworks at Cranford Park
London Borough of Hillingdon · Local authority · Greater London
Incumbent: O'HARA BROS. SURFACING LIMITED
Groundworks at Cranford Park for connection of services and associated works.
- Published value
- £40kinc. VAT as published
- Annual run-rate
- £47kpublished value ÷ term, inc. VAT
- Term
- 23 Feb 2026 → 31 Dec 2026 · 10 months
- Reference
ocds-h6vhtk-069e49
- Ends · in 65 days
Stubbington Study Centre Structural Roof Repairs
Hampshire County Council · Local authority · South East England
Incumbent: MKG Building Services Ltd
To affect structural repairs to timber framed building. Installation of fabricated steelwork and associated structural timber framing.
- Published value
- £38k
- Annual run-rate
- —term under 6 months
- Term
- 10 Aug 2026 → 31 Dec 2026 · 5 months
- Reference
ocds-h6vhtk-06e644
- Ends · in 65 days
Red House Court
Accent Group Ltd · Other public body · Yorkshire and the Humber
Incumbent: The Purple Roofing Company Ltd
Accent's wishes to procure a single Contractor to provide Roof Replacement Works at Flats 1-6, Red House Court, Stokesley, North Yorkshire TS9 5AA.
- Published value
- £37kinc. VAT as published
- Annual run-rate
- £73kpublished value ÷ term, inc. VAT
- Term
- 1 Jul 2026 → 31 Dec 2026 · 6 months
- Reference
ocds-h6vhtk-069836
- Ends · in 65 days
Thorne Moors tower relocation
NATURAL ENGLAND (Defra Network eTendering Portal) · Central government · Yorkshire and the Humber
Incumbent: NOFI ENGINEERING SOLUTIONS LTD · Last contest: awarded 5% over the estimate
Dismantle and then reconstruct viewing tower approximately 700m from current location.Tower requires some minor remedial works. Work to be undertaken on Thorne Moors, Humberhead Peatlands National Nature Reserve.
- Published value
- £37k
- Annual run-rate
- —term under 6 months
- Term
- 20 Oct 2026 → 31 Dec 2026 · 2 months
- Reference
ocds-h6vhtk-077479
- Ends · in 65 days
Beach Base Improvements - Replacement Doors
Redcar and Cleveland Borough Council · Local authority
Incumbent: METADOR LIMITED
Contract for the supply and installation of specialist metal doors at the Beach Base
- Published value
- £32k
- Annual run-rate
- —term under 6 months
- Term
- 1 Oct 2026 → 31 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-078554
- Ends · in 65 days
Plant Equipment, Leeds
Royal Armouries Museum · Central government
Incumbent: Fes FM Limited
£31,612.76 Exc. VAT £37,935.31 Inc. VAT A 7-month contract for the planned, preventative maintenance of critical plant at Royal Armouries Leeds, new Dock Hall and National Firearms Centre. Servicing HVAC and mechanical plant including air-h…
- Published value
- £32k
- Annual run-rate
- £54kpublished value ÷ term, exc. VAT
- Term
- 1 Jun 2026 → 31 Dec 2026 · 7 months
- Reference
ocds-h6vhtk-06b017
- Ends · in 65 days
Supply and Installation of New and Repair of existing Fences and Associated Services
Staffordshire County Council · Local authority · West Midlands
Incumbent: Dawkes & Co Ltd
Awarded call off contract from Staffordshire County Councils IA3601 Supply and Installation of New and Repair of existing Fences and Associated Services for July 2026.
- Published value
- £32k
- Annual run-rate
- —term under 6 months
- Term
- 26 Oct 2026 → 31 Dec 2026 · 2 months
- Reference
ocds-h6vhtk-06df97
- Ends · in 65 days
Village Hall Rain Garden Little Blakenham
Suffolk County Council · Local authority
Incumbent: Mixbrow Construction
Suffolk County Council has requested quotations for the provision of the Little Blakenham Village Hall Rain Garden and is now awarding a contract.
- Published value
- £31kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 10 Aug 2026 → 31 Dec 2026 · 5 months
- Reference
ocds-h6vhtk-06aa35
- Ends · in 65 days
Waiver - UHB_QEH - Britec Bright Technologies LTD - EPR Permit Compliance Works
University Hospitals Birmingham NHS Foundation Trust · Central government
Incumbent: Bright Technologies Ltd
This service relates to the EPR compliance works required in the Nuclear Medicine counting room provided by Britec Bright Technologies LTD
- Published value
- £30k
- Annual run-rate
- £30kpublished value ÷ term, exc. VAT
- Term
- 30 Dec 2025 → 31 Dec 2026 · 1 yr
- Reference
ocds-h6vhtk-066604
- Ends · in 65 days
Provision of Scaffolding Services to support DCP Stores Extension Project (DCPSE)
Nuclear Restoration Services Limited · Central government
Incumbent: Caithness Scaffolding Contractors Ltd
A contract has been awarded by Nuclear Restoration Services Limited (Dounreay), as a result of a direct award through the Framework Agreement for Scaffolding Services, for the Provision of Scaffolding Services to support Dounreay Cementatio…
- Published value
- £29k
- Annual run-rate
- £45kpublished value ÷ term, exc. VAT
- Term
- 7 May 2026 → 31 Dec 2026 · 8 months
- Reference
ocds-h6vhtk-069384
- Ends · in 65 days
SP2025/26-28 - PMVA Training
Sussex Partnership NHS Foundation Trust · Central government
Incumbent: LADBROKES BETTING & GAMING LTD
Despite attempts to find alternatives, this is the only venue with sufficient storage for all the required equipment as well as space for training.
- Published value
- £29k
- Annual run-rate
- £29kpublished value ÷ term, exc. VAT
- Term
- 1 Jan 2026 → 31 Dec 2026 · 1 yr
- Reference
ocds-h6vhtk-06c4c9
- Ends · in 65 days
Separators and sewage pumps
The Police, Fire and Crime Commissioner for Essex · Police & fire
Incumbent: Pinnacle Housing Limited
Planned Maintenance Of Interceptors, Silt Traps And Associated Equipment
- Published value
- £28k
- Annual run-rate
- £28kpublished value ÷ term, exc. VAT
- Term
- 12 Jan 2026 → 31 Dec 2026 · 1 yr
- Reference
ocds-h6vhtk-060355
- Ends · in 65 days
Mature_Scrub_Mechanical clearance_Unit 12_Goss NNR'
NATURAL ENGLAND (Defra Network eTendering Portal) · Central government · South West England
Incumbent: ES MITIGATION AND MANAGEMENT LIMITED · Last contest: awarded 30% under the estimate
Natural England is seeking to appoint a suitably qualified and experienced contractor with a demonstrable track record of working on designated sites, specifically Sites of Special Scientific Interest (SSSI) and Special Areas of Conservatio…
- Published value
- £21k
- Annual run-rate
- —term under 6 months
- Term
- 1 Sept 2026 → 31 Dec 2026 · 4 months
- Reference
ocds-h6vhtk-06af9c
- Ends · in 65 days
Light to Semi Mature_Scrub_Manual Clearance_Unit 12_Goss NNR
NATURAL ENGLAND (Defra Network eTendering Portal) · Central government · South West England
Incumbent: The Habitat Restoration Company Ltd · Last contest: awarded 8% under the estimate
Natural England is seeking to appoint a suitably qualified and Experienced contractor to undertake scrub and semi-mature tree clearance . The contractor must be able to demonstrate prior experience working on designated sites, including Sit…
- Published value
- £20k
- Annual run-rate
- —term under 6 months
- Term
- 31 Aug 2026 → 31 Dec 2026 · 4 months
- Reference
ocds-h6vhtk-06bcc4
- Ends · in 65 days
A483 - Bangor Road (Junction 2) and Ruthin Road (Junction 4) Barrier Repairs
Wrexham County Borough Council · Local authority · Wales (Cymru)
Incumbent: Varley & Gulliver (Hill & Smith VRS)
Repair the vehicle restraint systems at Junction 2 and Junction 4 on the A483 in our role as a Partner Authority to the North and Mid Wales Trunk Road Agency (NMWTRA) Direct award in line with WCBC financial regs Contract by PO
- Published value
- £17k
- Annual run-rate
- —term under 6 months
- Term
- 7 Sept 2026 → 31 Dec 2026 · 4 months
- Reference
ocds-h6vhtk-06e05d
- Ends · in 65 days
Security Fencing - Thorne Moors
NATURAL ENGLAND (Defra Network eTendering Portal) · Central government · Yorkshire and the Humber
Incumbent: BURN FENCING LIMITED · Last contest: awarded 31% under the estimate
Supply and Install 134m of Paladin Fencing and vehicle gates on Thorne Moors, Humberhead Peatlands NNR.
- Published value
- £14k
- Annual run-rate
- —term under 6 months
- Term
- 15 Oct 2026 → 31 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-06f771
- Ends · in 65 days
Contract for Woodland Establishment & Maintenance of new woodlands at various sites across County Durham
Durham County Council · Local authority · North East England
Incumbent: Microsite · Last contest: 5 bids
This Contract for Woodland Establishment & Maintenance of new woodlands at various sites across County Durham. Durham County Council is intending to appoint a single provider to carry out the planting of approximately 35,000 mainly broadlea…
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Ends 31 Dec 2026 · start not published
- Reference
ocds-h6vhtk-041abf
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.