Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 81–90

  1. Ends · in 11 days

    Housing Needs Assessment

    Blackburn With Darwen Borough Council · Local authority · North West England

    Incumbent: ARC4 LIMITED

    Deliver of an enhanced Housing Needs Assessment (HNA) for Supported Housing,

    Published value
    £26k
    Annual run-rate
    £52kpublished value ÷ term, exc. VAT
    Term
    8 May 2026 → 7 Nov 2026 · 6 months
    Reference
    ocds-h6vhtk-069940
  2. Ends · in 12 days

    A contract to undertake fire door inspections.

    SUTTON HOUSING PARTNERSHIP LIMITED · Central government

    Incumbent: Bellrock Consulting UK Ltd TA Summers-Inman

    A contract to undertake fire door inspections for Sutton Housing Partnership who manage properties on behalf of the London Borough of Sutton.

    Published value
    £60k
    Annual run-rate
    —term under 6 months
    Term
    8 Nov 2026 → 8 Nov 2026 · 1 day
    Reference
    ocds-h6vhtk-06db8b
  3. Ends · in 13 days

    Contract for Climate Change Consultancy

    Stafford Borough Council · Local authority · West Midlands

    Incumbent: Bioregional Development Group · Last contest: awarded at the estimate

    Stafford Borough Council (SBC) have procured the services of a supplier to meet the requirements of the Council's new Local Plan. The Local Plan requires an Economic and Housing Delivery Needs Assessment (EHDNA) to identify future growth ne…

    Published value
    £80k
    Annual run-rate
    £80kpublished value ÷ term, exc. VAT
    Term
    10 Nov 2025 → 9 Nov 2026 · 1 yr
    Reference
    ocds-h6vhtk-054e99
  4. Ends · in 13 days

    Homes England - Bristol - George & Railway Hotel Design

    Homes England (the name adopted by the Homes and Communities Agency) · Other public body · South West England

    Incumbent: TRS GROUP (SOUTH WEST) LIMITED

    The George & Railway Hotel is a Grade 2 Listed Asset acquired from Bristol City Council as part of a Land Assembly process linked to the Bristol Temple Quarter Redevelopment Programme. The asset is in urgent need of an external stabilising …

    Published value
    £20k
    Annual run-rate
    —term under 6 months
    Term
    4 Aug 2026 → 9 Nov 2026 · 3 months
    Reference
    ocds-h6vhtk-06da30
  5. Ends · in 13 days

    Provision of Professional Consultancy Services – Structural and Civil Engineer Design (Bury Park)

    Luton Borough Council · Local authority · East of England

    Incumbent: Gyoury Self Partnership (St Albans) LLP

    A consultant to provide a full, complete and accurate Civil and structural design drawings set and Specifications, carry out on site visits and co-ordinate the process of the associated Civil, Below Ground Drainage (internal and external) a…

    Published value
    £9k
    Annual run-rate
    £8kpublished value ÷ term, exc. VAT
    Term
    22 Sept 2025 → 9 Nov 2026 · 1.2 yrs
    Reference
    ocds-h6vhtk-05a42d
  6. Estimated end · in 14 daysFramework recordPanel · 23 suppliers

    ID5230772 - UREGNI - CEO Office - Framework for Economic, Financial Consultancy and Other Professional Services

    Utility Regulator NI · Northern Ireland

    Panel: Action Renewables, CEPA LLP, COGNISENSE LTD +20 more

    • Energy and related services
    Published value
    £8.0mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 10 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-046fa4
  7. Ends · in 14 days

    TEP PBC Exemplar Costing & BoQ Development

    ENVIRONMENT AGENCY · Other public body

    Incumbent: AECOM LIMITED

    bills of quantities for each of the 15 exemplars for major repair and replacement with present day cost figures

    Published value
    £52kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    10 Aug 2026 → 10 Nov 2026 · 3 months
    Reference
    ocds-h6vhtk-06dca3
  8. Estimated end · in 15 days

    PMSB275 Water Sampling

    MSE Group · East of England

    Incumbent: Proeconomy Limited · Last contest: 9 bids

    PMSB275 Water Sampling

    • Technical testing, analysis and consultancy services
    Published value
    £342k
    Annual run-rate
    —start date not published
    Term
    Estimated end 11 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-02e4cc
  9. Estimated end · in 15 days

    Contract

    The Education Authority · Education · Nationwide (UK), Northern Ireland

    Incumbent: Collins Rolston Architects · Last contest: 17 bids (1 SME) · awarded 6% under the estimate

    Appointment of Integrated Consultant Team to provide design services to RIBA Stages 2-6– The provision of additional SEN accommodation comprising ancillary and support rooms complete with associated site works at Sperrinview Special School,…

    • Architectural, construction, engineering and inspection services
    Published value
    £156k
    Annual run-rate
    —start date not published
    Term
    Estimated end 11 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-0419ee
  10. Ends · in 15 days

    CBC-1814-Q-AS Maulden & Clophill Flood Studies

    Central Bedfordshire Council · Local authority

    Incumbent: Jeremy Benn Associates Ltd

    Central Bedfordshire Council has awarded a coordinated flood risk study contract covering the rural parishes of Maulden and Clophill. These neighbouring catchments are hydrologically connected, with complex and recurring flooding challenges…

    Published value
    £107k
    Annual run-rate
    £106kpublished value ÷ term, exc. VAT
    Term
    10 Nov 2025 → 11 Nov 2026 · 1 yr
    Reference
    ocds-h6vhtk-078864

When contracts end · Architectural, construction, engineering
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,285 contracts and agreements end within 24 months, 3,292 in total · £790m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months395
  2. 3–6 months489
  3. 6–12 months529
  4. 12–24 months872

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.