Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 1–10
- Estimated end · in 29 daysFramework recordPanel · 7 suppliers
Highways Construction Materials Framework 2022
Dorset Council · Local authority · South West England
Panel: Aggregate Industries UK Ltd, G Crook and Sons, Harold Doonan Building Materials Ltd +4 more
Re-procurement plannedFramework for the Supply of Highway Construction Materials · tender expected
- Published value
- £10mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 25 Nov 2026 · start not published
- Reference
ocds-h6vhtk-036977
- Estimated end · in 71 daysFramework record
The Supply of Metals
LEIDOS SUPPLY, LIMITED · Nationwide (UK)
Incumbent: Righton Blackburn Ltd
- Published value
- £2.0mpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 6 Jan 2027 · start not published
- Reference
ocds-h6vhtk-03284c
- Estimated end · in 88 daysFramework record
Household Waste Recycling Centres (HWRCs) Containers
Staffordshire County Council · Local authority · West Midlands
Incumbent: GJF Fabrications Ltd
- Published value
- £480kpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 23 Jan 2027 · start not published
- Reference
ocds-h6vhtk-037785
- Estimated end · in 124 days
HOUSEHOLD WASTE RECYCLING CENTRES (HWRCS) RO-RO CONTAINERS
Staffordshire County Council · Local authority · West Midlands
Incumbent: Ridgeway Manufacturing Ltd · Last contest: 3 bids (3 SME) · awarded at the estimate
The Council is seeking tenders for the purchase of new open top hook lift ro-ro containers of 40 (forty) cubic yards. Within the HWRC network there are circa one hundred and eighty (180) containers in operation. In the first instance, repai…
- Published value
- £280k
- Annual run-rate
- —start date not published
- Term
- Estimated end 27 Feb 2027 · start not published
- Reference
ocds-h6vhtk-04dc8b
- Estimated end · in 126 daysFramework recordPanel · 3 suppliers
HCC Nov 2022 - Framework Agreement for the Supply of Clay and Modelling Materials
Hertfordshire County Council · Local authority · East of England
Panel: Artstraws Ltd, Daler-Rowney Limited, Major Brushes Limited
- Published value
- £372kpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 2 Mar 2027 · start not published
- Reference
ocds-h6vhtk-0384a0
- Ends · in 156 days
Supply of Raw Metal Materials
Ministry of Justice · Central government · Yorkshire and the Humber
Incumbent: Hall & Pickles Ltd · Last contest: 4 bids (2 SME)
Raw Metal Materials for manufacturing products in the HMP Prison Engineering Workshops across the United Kingdom
- Published value
- £1.7m
- Annual run-rate
- —start date not published
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-0289c5
- Ends · in 156 days
Supply of Raw Metal Materials
Ministry of Justice · Central government · Yorkshire and the Humber
Incumbent: Hall & Pickles Ltd · Last contest: 4 bids (1 SME)
Raw Metal Materials for manufacturing products in the HMP Prison Engineering Workshops across the United Kingdom
- Published value
- £1.5m
- Annual run-rate
- —start date not published
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-0289c5
- Ends · in 156 daysCall-offPanel · 5 suppliers
Lot 1 - Doughs, Clays and Moulding
ESPO · Nationwide (UK)
Panel: A B Gee of Ripley Ltd, DRYAD CREATIVE LIMITED (Previously DRYAD EDUCATION LIMITED), Daler-Rowney Limited +2 more · Last contest: 8 bids (8 SME)
Framework for the supply of Air Drying and Kiln Drying Modelling Clays and Glazes, Soft Modelling Dough, Silver and Modelling Sand and Construction Materials including Foam, Wood for educational use for delivery to the ESPO Distribution Cen…
- Published value
- £1.0mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-0487fc
- Ends · in 156 daysCall-off
Lot 5 - Play Sand
ESPO · Nationwide (UK)
Incumbent: PENNINE AGGREGATES LIMITED · Last contest: 8 bids (8 SME)
Framework for the supply of Air Drying and Kiln Drying Modelling Clays and Glazes, Soft Modelling Dough, Silver and Modelling Sand and Construction Materials including Foam, Wood for educational use for delivery to the ESPO Distribution Cen…
- Published value
- £600kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-0487fc
- Ends · in 156 days
Supply of Raw Metal Materials
Ministry of Justice · Central government · Yorkshire and the Humber
Incumbent: Hall & Pickles Ltd · Last contest: 3 bids (1 SME)
Raw Metal Materials for manufacturing products in the HMP Prison Engineering Workshops across the United Kingdom
- Published value
- £569k
- Annual run-rate
- —start date not published
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-0289c5
When contracts end · Mining, basic metals and related products i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
25 contracts and agreements end within 24 months, 33 in total · £7.0m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 44 divisions shown.
85Health and social work services2,71579Business services: law, marketing, consulting67560Transport services (except waste transport)61650Repair and maintenance services60390Sewage, refuse, cleaning and environmental52245Construction work50072IT services: consulting, software, internet46771Architectural, construction, engineering454
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.