Hire of earthmoving equipment with operator: UK Tenders, Buyers & Competition
CPV 45520000·Works · class·in Construction & Civil Engineering
Open now0no tender open for bids right now
i
Tenders you can still bid for.
Notices at tender stage whose deadline has not passed, counted the way the search counts them: a notice shows under every code and region it names.
Notices, last 12 months11 contracting authorities · 2 in the catalogue
i
Notices published in the last 12 months.
Counted per tender, not per lot, against the 12 months before where shown.
Thin record: 2 notices carry this code in the catalogue. Mix and competition sections need more notices and are not shown.
Codes and neighbouring classes
The 8-digit CPV codes notices in this class actually use, and the other classes of the same division
45520000 Hire of earthmoving equipment with operator2 notices · 100%Other classes in Construction & Civil Engineering
- Building construction work 1,627 · 12m
- Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork 891 · 12m
- Roof works and other special trade construction works 884 · 12m
- Other building completion work 708 · 12m
- Electrical installation work 701 · 12m
- Building demolition and wrecking work and earthmoving work 465 · 12m
- Joinery and carpentry installation work 355 · 12m
- Plumbing and sanitary works 341 · 12m
- Fencing, railing and safety equipment installation work 220 · 12m
- Engineering works and construction works 186 · 12m
- All of Construction & Civil Engineering →
About this data
- Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
- What counts here. Every notice with a CPV code starting 4552. A notice with several codes counts in each sector it names. Notices from 2021 to 10 Sept 2026.
- Competition. Bids and winners cover the last three years and count each lot as its own contest; frameworks and dynamic purchasing systems are shown apart from ordinary contracts.
- Why no total spend. Notice estimates often repeat a framework’s ceiling, so adding them up would overstate the market. Typical contract values are shown instead.
- Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.