Official UK procurement notice
Asset Delivery Maintenance & Response East Region
Authority: National Highways Limited (Central government)
What is being bought
Published requirement descriptionThis VEAT Notice relates to a Deed of Variation to a National Highways' Maintenance and Response Contract. This Contract currently provides and undertakes all cyclical and reactive maintenance, incident response, defect rectification and severe weather delivery on the trunk roads and motorways within Bedfordshire, Hertfordshire, Cambridgeshire, Essex, Norfolk, Suffolk with traffic management function in Oxfordshire, Buckinghamshire and Berkshire (Area 6&8 East Region) (the "Contract"). Duties also include maintenance of roadside technology, the provision of traffic management for the contractor, maintenance and incident response activities, and traffic management for others who may be working on the network.
The variation will add two sections of road into the Contract covering the A1(m) Alconbury to Peterborough and the M40 which are currently maintained under Design Build Finance & Operate ("DBFO") contracts due to expire on 31 March 2026 and 5 January 2027. Consequently the total value of the Contract will increase by approximately 24%.
It will also shorten the Contract which will have a new end date of 1st July 2029 instead of 30th September 2034 in order to align with the procurement process for the next Maintenance & Response contracts.
CPV: Construction work for highways · Electrical installation work · Engineering services · Highway maintenance work · Road-maintenance works · Roadworks · Surface work for highways
The lotProcurement structure
single lot · no lot value publishedLot #1A Design Build Finance Operate (DBFO) contract covers A1(m) Alconbury to Peterborough…
A Design Build Finance Operate (DBFO) contract covers A1(m) Alconbury to Peterborough expires on 31st March 2026 and M40 expires 5th January 2027. National Highways therefore must appoint an alternative maintenance contractor and it considers that the scope of these works is already included within this existing Maintenance and Response Contract which is adjacent geographically. Therefore these roads will be incorporated into this existing Maintenance and Response (M&R) Contract for Area 6&8 of the Strategic Road Network following the award of the Deed of Variation. This together with the need for national alignment of the expiry dates for all of the M&R contracts, ready for their re-procurement, means that the term of the Area 6&8 M&R Contract will be shortened and will have a new end date of 1st July 2029 instead of 30th September 2034. The new estimated total Contract value will be £607,670,000.
Procedure terms & legal framework
From the official record- Procedure method
- Award procedure without prior publication of a call for competition
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Awarded without competition
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Direct award (no call for competition)
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Unspecified in notice
- First published
- 12 Aug 2025, 10:06 BST
- Last source update
- 12 Aug 2025, 10:06 BST
- FTS notice number
2025/S 000-047884- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-0585b7Find a Tender
- Why no open competition
- The procurement falls outside the scope of application of the directive
- Published justification
The modifications to the Contract fall within the permissible grounds set out under Regulation 72(1)(e) of the Public Contracts Regulations 2015 in that the modifications are not substantial within the meaning of Regulation 72(8) of the Public Contracts Regulations 2015 because:
The inclusion of Design Build Finance and Operate (DBFO) roads into the Contract does not render the Contract materially different compared to when it was originally procured. The type of work originally required of the Contract (i.e. maintenance and response) is the same as that which it will carry out on the previous DBFO stretches of the Strategic Road Network, it is just a case that the total lane coverage to be maintained under the Contract increases.
Adding the additional roads would not have changed the outcome of the original procurement in any way. The Contract will be fully operated in accordance with their current terms and pricing;
As the current Contract will be operated for the new roads on the same terms and pricing, this does not alter the economic balance of the Contract in favour of the contractor;
The change does not considerably alter the scope of the Contract as the works and services provided will remain unchanged and the roads have been included in this Contract because they are adjacent in terms of geographical scope also. Any increase in scope is also mitigated by a shortening in Contract term;
This is not a change in contractor.
In addition, National Highways also considers that the exemption at Regulation 72(1)(b) would in any event apply. This permits additional services or supplies that have become necessary and were not included in the initial procurement where a change of contractor cannot be made for economic or technical reasons and another supplier/procurement would cause significant inconvenience or substantial duplication of costs for the contracting authority; and where any increase in price does not exceed 50% of the value of the original Contract.
The Deed of Variation ensures continuity of service on the Strategic Road Network and aligns with National Highways' wider asset delivery and procurement strategy, thereby safeguarding public value and network integrity. The Contract is being shortened to better align with the re-procurement strategy for all Maintenance & Response contracts. It would provide significant technical difficulties and duplication of procurement costs for National Highways to procure a contractor simply for this short stretch of network given the current re-procurement strategy.
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| Ringway Infrastructure Services LimitedSubcontracting: declared | £607,670,000 † | — | Awarded |
Contracts
Contract 047884-2025-1 · Ringway Infrastructure Services Limited
- Signed
- 12 Jun 2019
- Value
- £607,670,000
- Status
- active
Contracting authority & participating public bodies
Bidders & participating suppliers
1 commercial party on the notice- Ringway Infrastructure ServicesAwarded supplier
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.