BP1054 - Design and Build of Community Pavilion and Young People's Centre
Authority: Broxtowe Borough Council (Local council)
What is being bought
Published requirement descriptionThis is the shortlisting stage. Please ensure you read the procurement documentation especially PART ONE and provide the required information.
Broxtowe Borough Council (the Council) is undertaking this procurement to find a Contractor to finalise the design and build a Community Pavilion and Young People's Centre at Hickings Road, Recreation Ground in Stapleford, Nottingham. NG9 8PJ.
This project forms one of six core projects identified in the Stapleford Town Improvement Plan (TIP) and is funded by Towns Fund Deal.
The scope of the building works will comprise of the demolition of the existing changing pavilion and the construction of a new community leisure pavilion together with associated external works including installation of MUGA and replacement of skate park with community garden.
A new 11 a-side 3G football pitch is also planned on the site, and it is envisaged that this will be constructed concurrent to the building contract for the new pavilion, albeit the football pitch will be constructed by others. The successful contractor for the Pavilion will be expected to coordinate and work collaboratively with the 3G pitch contractor to ensure a safe working environment and coordination of site access and use.
Planning permission for the new pavilion has been approved (Reference 23/00051/REG3 dated 7th July 2023) which can be found: www.planning.broxtowe.gov.uk/ApplicationDetail ↗
The works are planned to be let utilising either a JCT D&B 2016 or NEC4 Option A form of Building Contract on a design and build basis.
The Council invites the successful Contractor to take a novation of the Architect and Structural Engineer appointments. The successful Contractor may however propose alternatives in the tender (Stage 2) process. The Building Services Engineer will be retained by the Council.
The Contractor will be required to work collaboratively with the Client's professional team and the Clients' partners to coordinate the detailed design. It is envisaged that the works will commence Spring 2024 and take approximately 12 months. The project is funded by the Towns Deal and must be completed prior to April 2025.
The Council requires a competitive build price and would imagine maximum price of bids to be up to the value of £6.5m, but with potential to be lower.
NOTE: All Candidates should access the 'Messages' section of the e-procurement system on a regular basis to check for any clarifications issued on this project and/or any public exchange of information between interested parties, before final submission of their bid. It is the sole responsibility of Candidates to do so.
CPV: Building construction work · Works for complete or part construction and civil engineering work
The lotProcurement structure
single lot · no lot value publishedLot #1See II.1.4
See II.1.4 . Short Description and Part 3 of the Selection Stage documents. Additional information: NOTE: All Candidates should access the 'Messages' section of the e-procurement system on a regular basis to check for any clarifications issued on this project and/or any public exchange of information between interested parties, before final submission of their bid. It is the sole responsibility of Candidates to do so.
Procedure terms & legal framework
From the official record- Procedure method
- Restricted procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Closed
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 1 Sept 2023, 16:05 BST
- Last source update
- 1 Sept 2023, 16:05 BST
- Authority reference
BP1054- FTS notice number
2023/S 000-025884- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-03f938Find a Tender
- Review procedure
The contracting authority will incorporate a minimum 10 calendar day standstill period following electronic notification (minimum of 15 calendar days for any other means of communication) to tenderers of the award decision. This period allows unsuccessful tenderers to seek further debriefing from the contracting authority before the contract is entered into. If an appeal regarding the award of a contract has not been successfully resolved the Public Contracts Regulations 2015 (Si 2015 No 102) provide for aggrieved parties who have been harmed or are at risk of harm by a breach of the rules to take action in the High Court (England, Wales and Northern Ireland). Any such action must be brought promptly (generally within 3 months). Where a contract has not been entered into the Court may order the setting aside of the award decision or order the authority to amend any document and may award damages. If the contract has been entered into the Court may only award damages. The purpose of the standstill period referred to above is to allow parties to apply to the Courts to set aside the award decision before the contract is entered into.
How it was run
Official notice- Submission deadline
- 2 Oct 2023, 10:00 BST
- Submission channel
- {"electronicSubmission","written"}
- Accepted languages
- en
Timeline
1 Sept 2023 → 27 Oct 2023 · 3 dates- Notice published1 Sept 2023, 16:05 BST
- Submission deadline2 Oct 2023, 10:00 BST
- Invitations to tender expected27 Oct 2023, 00:00 BST
Contracting authority & participating public bodies
Official documents & specifications (1)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria