Bray, Burnham, Dorney, Taplow Towers Major Works Project
Authority: London Borough of Camden (Local council)
What is being bought
Published requirement descriptionThe London Borough of Camden (‘the Council’) is seeking to award a contract for recladding works to the Bray, Burnham, Dorney and Taplow towers, together with associated works to the envelope of the buildings, including full window replacement, renewal of flat roofs, installation of building maintenance units (BMU), replacement of brickwork to the ground and first floor levels, including vents, louvers and canopies as well as insulation to the undercroft as required. Related works will include radiator installations, internal making good and decorating as well as installation of relevant power supplies to BMUs and louvers.
The project will comprise of the replacement of the previous cladding system, which has been removed, the curtain walling, associated remedial work and making good, and window replacement throughout. The total façade area is approximately 30,000m2.
Construction Duration: 22 to 25 months
CPV: Bricklaying work · Cladding works · Installation of windows · Roof repair · Windows
The lotProcurement structure
single lot · no lot value publishedLot #1The scope of the major works are detailed in the technical specification and can be…
The scope of the major works are detailed in the technical specification and can be summarised as follows: The London Borough of Camden (‘the Council’) is seeking to award a contract for recladding works to the Bray, Burnham, Dorney and Taplow towers, together with associated works to the envelope of the buildings, including full window replacement, renewal of flat roofs, installation of building maintenance units (BMU), replacement of brickwork to the ground and first floor levels, including vents, louvers and canopies as well as insulation to the undercroft as required. Related works will include radiator installations, internal making good and decorating as well as installation of relevant power supplies to BMUs and louvers.
The project will comprise of the replacement of the previous cladding system, which has been removed, the curtain walling, associated remedial work and making good, and window replacement throughout. The total façade area is approximately 30,000m2.
Construction Duration: 22 to 25 months
Procedure terms & legal framework
From the official record- Procedure method
- Restricted procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Closed
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 6 May 2021, 09:06 BST
- Last source update
- 6 May 2021, 09:06 BST
- Authority reference
EU Supply Tender Reference: 44355- FTS notice number
2021/S 000-009784- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-02ada9Find a Tender
How it was run
Official notice- Submission deadline
- 17 Jun 2021, 12:00 BST
- Submission channel
- {"electronicSubmission","written"}
- Accepted languages
- en
- Bid validity
- 90 days from the deadline
Timeline
6 May 2021 → 16 Jul 2021 · 3 dates- Notice published6 May 2021, 09:06 BST
- Submission deadline17 Jun 2021, 12:00 BST
- Invitations to tender expected16 Jul 2021, 00:00 BST
Contracting authority & participating public bodies
Dispute resolution & review bodies
- Cabinet OfficeReview body
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria