Find a TenderAwarded
Published 25 Feb 2025, 12:36 GMT

Official UK procurement notice

Building Decarbonisation Projects at Williamson Park, The Storey and City Lab

Official notice

Authority: Lancaster City Council (Local council)·Consortium: 2 public authorities

WorksOpen procedure
Published estimate£3,200,000exc. VAT8.2% below published estimate
Submissions closed 13 Mar 2025awarded 7 Jul 2025
Awarded to Alternative Heat Ltd.

What is being bought

Published requirement description

Phase 1 – Pre-Construction Services (RIBA Stage 4)

The initial appointment will be for the pre-construction services, which encompass the

completion of RIBA Stage 4 (Technical Design). The contractor will be responsible for

providing detailed input on the buildability of the design, collaborating with the design team

to ensure constructability, and contributing to cost estimation, planning, and risk

identification during this phase.

Key Responsibilities for RIBA Stage 4:

  • Provide buildability input to ensure the design can be practically constructed and meets the

required performance specifications.

  • Assist with detailed cost estimation, including providing open book pricing.
  • Contribute to risk management by identifying potential risks and proposing mitigation

strategies.

  • Review and validate the design to confirm that it aligns with project requirements and is

feasible for construction.

Page 4 to 10

Phase 2 – Construction Works (RIBA Stage 5 and 6)

The ITT also includes the potential for the appointed Contractor to undertake the

construction works, which cover RIBA Stage 5 (Construction) and RIBA Stage 6 (Handover

and Close Out). However, the appointment for these stages is not guaranteed at this point.

Upon the completion of RIBA Stage 4, a formal review will be conducted to assess the

Contractor’s performance and the project’s requirements.

The Council reserves the right to proceed with the contractor for the construction works,

subject to satisfactory performance during RIBA Stage 4, confirmation of costs, and overall

project alignment. A break clause will be in place, allowing the Council to either proceed with

the appointed Contractor or re-tender for the construction works.

The Council retains Intellectual Property over full design work specific to the sites of this

project for use with another contractor if required.

Key Points for RIBA Stage 5 and 6:

  • The ITT outlines the requirements for both pre-construction services and potential

construction works, but the contractor is only guaranteed the work for RIBA Stage 4.

  • Following the completion of RIBA Stage 4, the Council will review whether to appoint the

contractor for RIBA Stage 5 and 6 based on performance, costs, and other considerations.

The main contract is subject to obtaining all necessary planning consents. The responsibility

for securing these consents will primarily rest with the Council. However, the appointed

contractor will be expected to provide technical support and relevant information as

required during the planning process.

The contractor must be aware that no construction works, particularly any equipment

ordering or significant on-site activities, can commence until all planning permissions are

secured. The timeline for the project may be extended if planning approvals are delayed.

Coordination with external parties, may also impact the timing of planning approvals and

should be factored into the project delivery plan.

The project is partially funded through the Public Sector Decarbonisation Scheme (PSDS),

and the key funding condition is that the project must be fully delivered, reach Practical

Completion (PC), and be signed off by the end of January 2026. This is the final deadline for

the project, and all works must be completed, tested, commissioned, and handed over

before this date to ensure compliance with funding requirements.

While an initial target of December 2025 has been identified for completion, this is flexible to

avoid unnecessary risk. The Council prefers to extend the timeline if required to ensure

quality and performance, rather than rush delivery.

CPV: Construction work

The lotProcurement structure

single lot · value published
Lot #1AwardedPublished value£3,200,000
Delivery: UK
Variant bids: allowed

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
Quality: 60%Price: 30%Social value: 10%
Published award criteria (3)
  • Quality: 60
  • Social Value: 10
  • Price: 30
What this means for your bid
  • Price carries 30 of 100 points: a 10% discount moves about 3 points. The method statement decides this lot, not the discount.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Open procedure
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Works
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
No (one-off requirement)
First published
25 Feb 2025, 12:36 GMT
Last source update
7 Jul 2025, 11:30 BST
Award evaluation window
13 Mar 2025 – …
Authority reference
DN752184
FTS notice number
2025/S 000-037694
Classification (CPV)
Construction work
Delivery area
UK
Official registry OCID
ocds-h6vhtk-04e7c4 Find a Tender

How it was run

Official notice
Run through: ProContract (Due North) · Who buys & how to bid on ProContract
Supplier login requiredLanguage: EN
Access & registration note: Free · short registration with manual review; public opportunity list
Submission deadline
13 Mar 2025, 12:00 GMT
Submission channel
{"electronicSubmission"}
Accepted languages
en
Bids opened
13 Mar 2025, 12:05 GMT
Detailed submission instructions & authority contactsFrom official release

Timeline

13 Mar 2025 → 7 Jul 2025 · 3 dates
  1. Submission deadline
    13 Mar 2025, 12:00 GMT
  2. Bids opened
    13 Mar 2025, 12:05 GMT
  3. Notice published
    7 Jul 2025, 11:30 BST

Notice history

2 events · 2 releases on Find a Tender · since 7 Jul 2025
  1. Status changed to complete
    7 Jul 2025, 11:30 BST
  2. Buyer details updated
    7 Jul 2025, 11:30 BST

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 1
Awarded value £2,937,3171 contract exc. VAT
Bids received 10
Contracts signed 1latest 7 Jul 2025
Awarded toValueDateStatus
Alternative Heat Ltd.SME£2,937,317 †—Awarded

Contracts

Bid statistics published by the authority

BidsSMEVCSEValid bid range
10bids———

Contracting authority & participating public bodies

2 public bodies on the notice

Lancaster City Council

Contracting authorityLocal CouncilRegional or local authorityGeneral public services Town Hall, Dalton Square, Lancaster, UK, LA1 1PJContact name, email, phone

Bidders & participating suppliers

1 commercial party on the notice

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.