Find a TenderPlanned procurementPipeline notice
Published 5 Oct 2026, 15:45 BST

Official UK procurement notice

Building Safety Contractors Framework

Authority: NOTTING HILL GENESIS

Framework agreementWorksCompetitive flexible procedureAbove threshold
Planned pipeline value£360,000,000pipeline notice, not a live tender
Tender notice expected 7 Jan 2027from the planned procurement notice
Framework period 4 yrsends 5 Sept 2031 · starts 7 Sept 2027

What is being bought

Published requirement description

Notting Hill Genesis are preparing to publish a two-stage Competitive Flexible procedure for a Closed Framework agreement. First stage is PSQ, with further ITT stage for Candidates to complete Quality, Technical Responses, with down selection to Commercial Pricing information. This framework has 2 lots: Lot 1 is for Specialist Façade works; Lot 2 is for Large Sites & Batching with a total number of 12 Bidders for each lot to be awarded onto the framework agreement.

FRAMEWORK VALUE: Please note the estimated value of the Framework Agreement is £360m. This estimation is based on NHG’s projected spend of £300m over the next 4 years, with an allowance for third-party Call-Offs entered into under the framework, estimated at £60m. NHG cannot give any guarantees that the goods/services totalling this value will in fact be called off from this framework and the award of any Call-Off contracts under the framework is at NHG's (or any other user's) discretion. Equally, the total value may increase, either if NHG’s own requirements increase unexpectedly or if the framework is used by other contracting authorities more extensively than anticipated.

Estimated Framework length - 4 years

CPV: Building consultancy services · Building surveying services · Building-inspection services · Construction work · Fire and explosion protection and control consultancy services · Hazard protection and control consultancy services · Health and safety consultancy services · Health and safety services

How this framework works

From the published notice
Framework period
4 yrs from 7 Sept 2027

The lotProcurement structure

single lot · no lot value published

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
What this means for your bid
  • “Building Safety Contractors Framework” is a framework: the contest is a place on its panel, not a single contract.

Pipeline intelligence · planning stage: how this market runs before the tender is published

How NOTTING HILL GENESIS buys Consultative engineering and construction services (CPV 7131), and who usually turns up

NOTTING HILL GENESIS has little published record in this market. Compared with other frameworks and DPS only. Whole-market view: Consultative engineering and construction services (CPV 7131) →

1

How the contest usually goes

Winner shares use published awards; bid and price charts use contested lots.

Question for the bid
This buyerNOTTING HILL GENESIS · this authority
What to do with it
How often do SMEs win?
i

How often small and medium firms win.

Share of awards where the winner’s size is known.

The counts under this question show how many awards have a known supplier size.

Last 36 months.

Buyer: no supplier sizes published · market: CPV 7131 · UK-wide, n=237
—39%

No supplier sizes published for this authority.

How often do local suppliers win?
i

How often local firms win similar work.

Winners with a registered address in the delivery region, out of awards with a known address.

Local means the winner is registered in the region where that award was delivered.

A local branch does not count if the registered address is elsewhere.

Last 36 months.

Buyer: no winner locations published · market: CPV 7131 · UK-wide, n=208
—56%

No winner locations published for this authority. Local means a registered address in the region where that award was delivered.

How long to a decision?
i

How long buyers here take to decide after bids close.

Middle value in days from the bid deadline to the award date, on competitions that published both.

Only decided tenders count, so slow ones still waiting are not in.

Last 36 months.

Buyer: no decision dates published · market: CPV 7131 · UK-wide, n=67
—91 days

Half of these awards have an award date within 91 days of the bid deadline.

How often single-bid or direct?
i

How often work is awarded with no recorded rival.

Direct awards and tenders where every published lot count shows one bid.

The market share is a minimum: some awards have no bid count.

Thin markets produce this too; it is not proof of a tailored specification.

Last 36 months.

Buyer: no awards on record · market: CPV 7131 · UK-wide, n=96
—26%

No awards recorded for this authority in this market.

How many bids did past lots attract?

i

How many bids past lots received.

Each colour is a bid-count range. Only competed lots with a published count are included.

Past bids do not predict this tender.

Last 36 months.

This buyer12 lots with bid counts · all categories
0% had one bid
The market322 lots with bid counts · CPV 7131 · UK-wide
2% had one bid
Buyer / market · select a colour for counts
1 bid0% / 2%
Buyer: 0 of 12 lots with published bid counts. Market: 8 of 322 lots with published bid counts.
2–30% / 9%
Buyer: 0 of 12 lots with published bid counts. Market: 30 of 322 lots with published bid counts.
4–658% / 25%
Buyer: 7 of 12 lots with published bid counts. Market: 79 of 322 lots with published bid counts.
7+42% / 64%
Buyer: 5 of 12 lots with published bid counts. Market: 205 of 322 lots with published bid counts.

How did awards compare with estimates?

i

Where winning prices landed against estimates.

Each colour shows awards below, close to or above the published estimate, one lot at a time.

On a framework or DPS, prices are agreed when work is called off.

Past prices are a guide, not a bid price.

Last 36 months.

Not comparable on a framework or DPS: the price is set later, on each call-off.

2

Assess each lot
i

What past awards tell you about each lot.

See the forecast, this buyer’s earlier suppliers and firms with relevant wins.

No supplier is confirmed as a bidder.

Open a lot for its forecast, this buyer’s previous supplier and possible competitors, from published award history, not a bid list

Lot #1CPV 713148 monthsPublished estimate£360m
Expected competition
i

How many bids this lot may attract.

The forecast uses similar past competitions. The bar shows either that forecast or past bid counts; the line below says which.

Each lot shows its own forecast based on its own category; forecasts for different lots of the same notice are not comparative. The bar shows 322 past lots.

A forecast, not a list of bidders.

—No model forecast yet2% chance of a single bid
Past bids on 322 similar lots
1 bid2%
8 of 322 similar past lots received 1 bid (2%).
2–39%
30 of 322 similar past lots received 2–3 (9%).
4–625%
79 of 322 similar past lots received 4–6 (25%).
7+64%
205 of 322 similar past lots received 7+ (64%).
Comparable past lots usually drew 9 bids.
Commercial price forecast
i

Where the award price may land.

The forecast uses similar awards and the buyer’s estimate. The band covers the middle half of likely prices.

No comparable awards for this lot yet.

A statistical guide from past awards, not a price to bid.

—Priced at call-off
On a framework or DPS the price is agreed on each call-off, so there is no award price to forecast here: the published figure is a ceiling.

Who has supplied this buyer on similar work?
i

Who has done similar work for this buyer.

Past contracts are matched by buyer, title and type of work.

A past supplier may not bid again.

No earlier contract of this buyer matches this lot on the published record.

Who could compete for this lot?
i

Who could compete for this lot?

Firms with relevant past wins. On a framework, we show firms on that agreement.

None is confirmed as a bidder.

Candidate suppliers for this notice have not been worked out yet, so this is not a verdict that nobody fits.

About this data
  • Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
  • Two views, kept apart. The authority’s own track record and the wider market for the same kind of work sit side by side and are never mixed. Where the local picture is too thin, a figure widens to a broader market and says which one it used.
  • Forecasts are labelled. The price forecast and its range, possible competitors and the earlier-work matches are our estimates from past awards: not published facts, not win chances and not price advice. Official notices do not say who is bidding.
  • Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.

Procedure terms & legal framework

From the official record
Procedure method
Competitive flexible procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Works
Notice status
Planned procurement
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
5 Oct 2026, 15:45 BST
Last source update
5 Oct 2026, 15:45 BST
Authority reference
PROC-1084
FTS notice number
2026/S 000-093946
Latest notice
Pipeline notice (UK1)
Classification (CPV)
Building consultancy servicesBuilding surveying servicesBuilding-inspection servicesConstruction workFire and explosion protection and control consultancy servicesHazard protection and control consultancy servicesHealth and safety consultancy servicesHealth and safety services
Delivery area
UK
Official registry OCID
ocds-h6vhtk-078103 Find a Tender

How it was run

Official notice
Appointment period ends
—

Timeline

5 Oct 2026 → 7 Sept 2027 · 3 dates
  1. Planning notice published21 days ago
    5 Oct 2026, 15:45 BST
  2. Today
    27 Oct 2026
  3. Tender notice expectedin 72 days
    7 Jan 2027, 23:59 GMT
  4. Contract startsin 314 days
    7 Sept 2027, 00:00 BST

Notice history

1 event · 1 release on Find a Tender
  1. Pipeline notice published
    5 Oct 2026, 15:45 BST
    UK1

Commercial outcome & contract awards

Pipeline notice
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Contracting authority & participating public bodies

Notting Hill Genesis

Contracting authorityPublic authority - sub-central government GB-PPON: PLMP-3644-HBBN Bruce Kenrick House, 2 Killick Street, London, London, N1 9FLContact name, email

Official documents & specifications (1)

Official links; attachments are not copied

Notices published for this procedure

  • Pipeline notice planningPipeline noticeUK1Pipeline notice on Find a Tender