Find a TenderAwarded without competitionContract details notice
Published 8 Jul 2025, 13:55 BST

Official UK procurement notice

CCTV Shared Service Control Room Upgrade

Official notice

Authority: Huntingdonshire District Council (Local council)

Direct awardSME suitable
Awarded value£230,000published award · exc. VAT
Awarded 18 Jul 2025no call for competition
Awarded to DSSL Group

What is being bought

Published requirement description

The CCTV Shared Service Control Room forms a critical part of our public safety and security infrastructure, operating as the central hub for live surveillance, incident response, evidentiary capture, and integration with law enforcement and emergency services.

As part of its lifecycle, the control room undergoes scheduled technology refreshes approximately once every decade to remain aligned with evolving security threats, software support cycles, hardware obsolescence, and operational standards.

We have reached a mandatory upgrade point driven primarily by Microsoft's transition to Windows 11, which in turn requires a concurrent upgrade of our deployed Video Management System (VMS), Veracity (iComply).

This has now been Direct awarded and contracts signed after the mandatory standstill period following the Contract Award notice.

The lotProcurement structure

single lot · no lot value published
Lot #1AwardedSME
Delivery: East of EnglandEligibility: SME eligible

Procedure terms & legal framework

From the official record
Procedure method
Direct award
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Notice status
Awarded without competition
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Direct award (no call for competition)
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
8 Jul 2025, 13:55 BST
Last source update
6 Aug 2025, 16:53 BST
Authority reference
C/2025/624
FTS notice number
2025/S 000-046689
Latest notice
Contract details notice (UK7)
Delivery area
East of England (UKH1)
Official registry OCID
ocds-h6vhtk-055b2a Find a Tender
Why no open competition
Additional Repeat Extension Partial Replacement
Published justification

1.1 Security-Sensitive Infrastructure

The existing CCTV infrastructure operates within a highly secure environment that includes:

  • Internet Protocol (IP) based architecture across servers, switches, and camera networks.
  • End-to-end encrypted video transmission and data storage.
  • Controlled integration with police, local authority, and national security platforms.
  • Role-based access controls and hardened cybersecurity policies.

Any modification to this architecture introduces inherent risks to system integrity, data protection, and operational resilience. The incumbent supplier holds full knowledge of the security architecture, encryption keys, firewall rules, VLAN segregation, failover protocols, and other critical system parameters.

1.2 Continuity of Service Obligations

The CCTV Shared Service is a 24/7 operational environment. Any prolonged downtime or system instability during the upgrade process would:

  • Expose public safety risks.
  • Jeopardize evidential continuity for criminal investigations.
  • Breach legal and statutory obligations under GDPR, DPA, and surveillance codes of practice.

The incumbent supplier is uniquely positioned to undertake the upgrade without disruption, leveraging their intimate familiarity with existing configurations, historical issues, and contingency protocols.

  1. Incumbent-Specific Configuration & Compliance Requirements

2.1 Proprietary System Configuration

The Veracity (iComply) VMS has been heavily customised over its operational life cycle, incorporating:

  • Custom integration with multiple third-party data feeds (ANPR, Help Points, Blue Light integration, etc.).
  • Bespoke alerting, audit trails, and control room user interfaces.
  • Unique failover and recovery protocols developed by the incumbent.

Attempting to replicate or reverse-engineer these configurations via a third party would require:

  • Extensive reverse engineering.
  • Risk of misconfiguration.
  • Loss of undocumented institutional knowledge.

2.2 Warranty, Liability & Maintenance Conflicts

  • The incumbent supplier holds full responsibility for system warranties, ongoing maintenance, and post-installation support.
  • Introducing a third-party installer would result in split liability and non-alignment of warranty obligations.
  • Should technical issues arise post-upgrade, the incumbent would be contractually and commercially entitled to decline support on non-standard installations.

2.3 Regulatory & Audit Compliance

The incumbent supplier maintains full compliance with external and statutory audits including SSAIB certification, which validates:

  • System integrity.
  • Data security.
  • Operational competence.
  • Resilience to cyber and physical threats.

Any deviation from the incumbent's service introduces compliance risks that may trigger adverse audit findings or even operational shutdown pending rectification

  1. Access to Secure Data & Controlled Environments

3.1 Access to Sensitive Information

The upgrade process requires privileged access to:

  • Historical and live surveillance footage.
  • Secure server environments containing criminal investigation data.
  • Law enforcement integration nodes.
  • Critical physical access to secured data centres and control rooms.

The incumbent supplier already holds the required security clearances, training, and vetted personnel approved for working within these highly restricted environments.

3.2 Contractor Vetting & Validation

  • Engaging new contractors would trigger extensive security vetting, vetting agency approvals, police background checks, and control room familiarisation.
  • This process is time-consuming, costly, and carries the risk of failed clearances, delaying the upgrade.
  • The incumbent's team remains fully cleared, trained, and embedded within current security protocols.
  1. Market Comparison & Financial Analysis

4.1 Market Alternatives Considered

A comparative market assessment was undertaken to evaluate alternative suppliers and solutions, including:

  • Full replacement options such as Genetec and Milestone VMS platforms.
  • Re-engagement with previous suppliers offering similar solutions.

4.2 Comparative Cost Analysis

  • A full system replacement was priced at approximately 400% higher than the incumbent's quoted costs due to hardware, licensing, integration, and training expenses.
  • A previous supplier's proposal was 200% more expensive than the incumbent's quote for equivalent scope.
  • Ancillary costs such as staff retraining, operational downtime, and interface redevelopment further inflate non-incumbent solutions.

4.3 Value for Money Conclusion

The incumbent's proposal represents:

  • Full backward compatibility.
  • Minimal retraining requirements.
  • No service downtime.
  • Lowest capital and operational expenditure.

How it was run

Official notice
Submission deadline
—

Timeline

30 Jul 2025 → 6 Aug 2025 · 2 dates
  1. Standstill ends
    30 Jul 2025, 23:59 BST
  2. Notice published
    6 Aug 2025, 16:53 BST

Notice history

4 events · 3 releases on Find a Tender · since 8 Jul 2025
  1. Transparency notice published
    8 Jul 2025, 13:55 BST
    UK5
  2. Contract award notice published
    21 Jul 2025, 11:10 BST
    UK6
  3. Contract signature expected
    1 Aug 2025, 23:59 BST
    scheduled
  4. Contract details notice published
    6 Aug 2025, 16:53 BST
    UK7

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 1
Awarded value £230,0001 award exc. VAT
Contracts signed 1latest 28 Jul 2025
Awarded toValueDateStatus
DSSL GroupSMECCTV shared control room upgrade award to DSSL Group Ltd2 Aug 2025 – 1 Oct 2025£230,00018 Jul 2025Awarded

Contracts

  • CCTV shared control room upgrade award to DSSL Group Ltd · DSSL GroupSME

    Signed
    28 Jul 2025
    Value
    £230,000
    Period
    2 Aug 2025 – 1 Oct 2025
    Status
    active
    3 agreed KPIs: On-time Delivery Rate · Downtime / Service Interruption · Compliance with Technical Standards
    • On-time Delivery Rate
    • Downtime / Service Interruption
    • Compliance with Technical Standards

Contracting authority & participating public bodies

Huntingdonshire District Council

Contracting authorityPublic authority - sub-central government GB-PPON: PXCY-8219-LWDM Pathfinder House St Mary's Street Huntingdon,, Cambridgeshire, East of England, PE29 3TNContact email

Bidders & participating suppliers

2 commercial parties on the notice
  • DSSL GROUP LIMITEDAwarded supplierGB-COH: 06993052GB-PPON: PLTX-4334-WQWT 1-3 Britannia Court, Basildon, East of England, SS13 1EUContact email
  • DSSL Group LtdAwarded supplierGB-COH: 6993052GB-PPON: PNWG-7295-ZPZH 1-3 Britannia Court, Burnt Mills Industrial Estate, Basildon, ESX, SS13 1EU, United Kingdom, Basildon, East of England, SS13 1EUContact email

Official documents & specifications (3)

Official links; attachments are not copied

Notices published for this procedure

  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Transparency notice awardTransparency noticeUK5Transparency notice on Find a Tender