Official UK procurement notice
Dorset Green H2 - Hydrogen System Installation
Authority: HYENERGY CONSULTANCY LIMITED
What is being bought
Published requirement descriptionThis project comprises of the installation of an electrolyser with a compressor directly connected to a solar farm that has operational capacity of 5MW with supplemental energy either coming from locally installed gas engines or the grid.
The proposed 1 to 1.5 mega-Watt (MW) Proton Exchange Membrane (PEM) electrolyser will be installed on-site and used to produce green hydrogen, from a potable water feed and will be powered by the co-located solar farm - producing a carbon free fuel and energy storage opportunity that can be used to help decarbonise a number of downstream applications.
Within this project, the green hydrogen will be produced, compressed and filled into hydrogen trailers.
This hydrogen is anticipated to be transported off-site for a variety of applications, however, neither of these distribution/use scenarios are included within this Tender.
CPV: Hydrogen
The lotProcurement structure
single lot · no lot value publishedLot #1This tender covers the delivery of hydrogen production, compression and trailer…
This tender covers the delivery of hydrogen production, compression and trailer filling system which is required as soon as possible.
Parties interested in supplying their services for this tender should refer to the attachments (access via links) for all the necessary information relating to the application process and all equipment specifications.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- Suitability
Conditions for participation as stated in procurement documents (access via links)
- Economic & financial standing
Selection criteria as stated in the procurement documents (access via links)
- Technical & professional ability
Selection criteria as stated in the procurement documents (access via links)
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Goods
- Notice status
- Closed
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- No (one-off requirement)
- First published
- 26 Apr 2021, 19:28 BST
- Last source update
- 26 Apr 2021, 19:28 BST
- Award evaluation window
- 7 Jun 2021 – …
- FTS notice number
2021/S 000-008944- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-02aa61Find a Tender
- Performance terms
Terms and Conditions as stated in the procurement documents (access via links)
- Review procedure
Review and Evaluation Procedure as stated in procurement documents (access via links)
How it was run
Official notice- Submission deadline
- 26 May 2021, 16:00 BST
- Submission channel
- {"electronicSubmission"}
- Accepted languages
- en
- Bids opened
- 7 Jun 2021, 09:00 BST
Timeline
26 Apr 2021 → 22 Oct 2021 · 5 dates- Notice published26 Apr 2021, 19:28 BST
- Submission deadline26 May 2021, 16:00 BST
- Bids opened7 Jun 2021, 09:00 BST
- Contract starts1 Oct 2021, 00:00 BST
- Bids must remain valid until22 Oct 2021, 23:59 BST
Contracting authority & participating public bodies
Dispute resolution & review bodies
- Canford Renewable EnergyReview body
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.