Official UK procurement notice
EV Charge Point Support & Maintenance Services
Authority: NETWORK RAIL INFRASTRUCTURE LIMITED (Central government)
What is being bought
Published requirement descriptionNetwork Rail is undertaking a Decarbonisation and Energy Efficiency Programme to transition towards sustainable and energy-efficient operations. This procurement is for the provision of maintenance services for Network Rail’s electric vehicle (EV) charging infrastructure, ensuring optimal uptime, operational reliability, and scalability to support the electrification of Network Rail’s fleet.
The contract covers preventive and corrective maintenance, including scheduled servicing, diagnostics, and rapid fault resolution for both AC and DC charge points. It also includes warranty management, spare parts provisioning, and seamless integration with Network Rail’s future Charge Point Management System (CPMS) for real-time monitoring, fault detection, and predictive maintenance analytics (procured separately and out of scope of this procurement).
The supplier must demonstrate multi-brand maintenance capability, as the network consists of chargers from multiple OEMs, including Schneider, Kenpower, and Rolec, alongside chargers managed by third parties such as APCOA. The network will expand from 1,000 chargers in Year 1 (currently up to 300 chargers are in operation) to approximately 8,600 chargers by Year 5, with a long-term target of 10,000 charge points.
The procurement aligns with Network Rail’s sustainability and operational strategy, ensuring a cost-effective, scalable, and high-quality maintenance framework that supports fleet electrification, decarbonisation targets, and long-term infrastructure resilience. The selected supplier must provide innovative, data-driven maintenance solutions, incorporating remote diagnostics, predictive analytics, and sustainable servicing practices to optimise performance and reduce environmental impact.
CPV: Battery chargers · Electricity distribution and related services · Street-lighting maintenance services · Telematics services
The lotProcurement structure
single lot · value publishedLot #1This procurement seeks to ensure the long-term reliability, scalability, and…Published value£16,400,000
This procurement seeks to ensure the long-term reliability, scalability, and operational efficiency of Network Rail’s expanding EV charging infrastructure. The contract will provide preventive and corrective maintenance services to support the growth of the charging network from an estimated 1,000 chargers in Year 1 (currently operating up to 300 chargers) to 8,600 chargers by Year 5, with a projected total of 10,000 chargers by the end of the contract term.
The contract includes preventive maintenance (PM) and corrective maintenance (CM) services, covering both AC and DC chargers from multiple OEMs (e.g., Schneider, Kenpower, Rolec). Preventive maintenance will involve scheduled inspections, cleaning, calibration, firmware updates, and proactive monitoring to optimise performance and extend charger lifespan. Corrective maintenance will provide rapid fault resolution, minimising downtime in accordance with strict Service Level Agreements (SLAs). This will ensure high operational availability.
Suppliers will be required to integrate seamlessly with Network Rail’s future Charge Point Management System (CPMS), which provides real-time performance monitoring, automated fault detection, and predictive analytics capabilities. The supplier must demonstrate the ability to leverage CPMS data for proactive issue resolution, optimise maintenance schedules, and provide detailed reporting on charger performance trends and fault trends.
The scope of the contract includes:
- Comprehensive Maintenance Services: Full lifecycle support for AC and DC EV charge points, ensuring continuous and efficient operation.
- Scalable Maintenance Framework: The ability to support a rapidly growing network, expanding from 1,000 chargers in Year 1 to over 8,600 by Year 5, with a long-term projection of up to 10,000 chargers.
- Performance Management & SLAs: Compliance with strict response and resolution times for critical and non-critical faults, ensuring minimal disruption to Network Rail’s fleet operations.
- Spare Parts & Warranty Management: Effective spare parts provisioning, including warranty coordination with OEMs.
- Integration with CPMS: The supplier must align maintenance activities with real-time monitoring, fault detection, and automated reporting through Network Rail’s CPMS.
- Sustainability & Innovation: Adoption of eco-friendly maintenance practices, waste minimisation, and deployment of advanced tools such as predictive analytics and remote diagnostics to enhance operational efficiency.
- Nationwide Coverage: The supplier must provide uniform service delivery across all urban, rural, and remote locations, ensuring consistent uptime and performance across the Network Rail estate. Additional information: In order to express an interest and download the procurement documentation you must register with the NR Bravo system at the address listed: networkrail.bravosolution.co.uk ↗
Procedure terms & legal framework
From the official record- Procedure method
- Negotiated procedure with prior call for competition
- Legal basis
- CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
- Procurement category
- Services
- Notice status
- Closed
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 5 Feb 2025, 15:11 GMT
- Last source update
- 5 Feb 2025, 15:11 GMT
- FTS notice number
2025/S 000-003841- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-04dbecFind a Tender- Contract terms summary
As stated in the procurement documentation.
- Electronic trading
- e-invoicing allowed · electronic ordering · electronic payment
- Performance terms
As stated in the procurement documentation.
How it was run
Official notice- Submission deadline
- 14 Mar 2025, 14:00 GMT
- Submission channel
- {"electronicSubmission","written"}
- Accepted languages
- en
- Bid validity
- 180 days from the deadline
- Deposits and guarantees
- As stated in the procurement documentation.
Timeline
5 Feb 2025 → 23 Apr 2025 · 3 dates- Notice published5 Feb 2025, 15:11 GMT
- Submission deadline14 Mar 2025, 14:00 GMT
- Invitations to tender expected23 Apr 2025, 00:00 BST
Contracting authority & participating public bodies
Dispute resolution & review bodies
- Network RailReview body
Official documents & specifications (4)
Official links; attachments are not copiedTender pack and attachments
- Technical selection criteria
- Economic and financial selection criteria
- Economic and financial selection criteria
- Technical selection criteria