FW Supply & Deliver - 11kV Indoor Switchgear - Multi Site 0637
Authority: Scottish Hydro Electric Power Distribution plc·Consortium: 2 public authorities
What is being bought4 lots · detail below
Published requirement descriptionScottish Hydro Electric Power Distribution plc and Southern Electric Power Distribution plc (SSEN) intends to establish multi-supplier Framework Agreements for the design, manufacture, testing, supply and delivery of 11kV indoor metal-enclosed primary switchgear for use across the SSEN Distribution network.
The Framework will support asset replacement, network reinforcement, customer connections and strategic investment programmes throughout the remainder of ED2, ED3 and the early years of ED4. Current planning assumptions indicate forecast demand of approximately 2,600 switchgear panels over the anticipated Framework lifecycle, although these volumes are indicative only and no minimum volume or value of work is guaranteed.
The procurement is structured across four lots:
Lot 1: Conventional CT/VT Fixed-Pattern Switchgear
Lot 2: LPIT-Enabled Fixed-Pattern Switchgear
Lot 3: Conventional CT/VT Withdrawable Switchgear
Lot 4: LPIT-Enabled Withdrawable Switchgear
The Framework will support SSEN's wider switchgear standardisation strategy, intended to improve affordability, manufacturing efficiency, security of supply, supply-chain resilience, lead-time performance and whole-life asset value through increased standardisation and product rationalisation.
Fixed-pattern switchgear remains SSEN's preferred architecture and is expected to account for the majority of Framework demand. Dedicated withdrawable lots have been included to support specific project requirements and future network investment needs.
The scope may include, but is not limited to:
- 11kV indoor metal-enclosed primary switchgear;
- fixed-pattern and withdrawable switchgear assemblies;
- conventional CT/VT and LPIT-enabled instrument transformer solutions;
- protection and control interfaces;
- manufacturer testing and certification;
- technical support and engineering assistance;
- installation and commissioning support services;
- training, warranty and after-sales support;
- spare parts and lifecycle support; and
- associated software, firmware, cyber-security support and obsolescence management activities where applicable.
Applicants may apply for one, multiple or all lots. Framework appointments and subsequent call-off opportunities will be awarded in accordance with the procurement documents.
- How the procedure runs: All interested parties are welcome to view the Opportunity Listing in our Source to Contract System, Jaggaer. Under 'Current Opportunites' you will find all the details on how to register and be invited to the Pre Qualification Questionnaire in Jaggaer: https://sse.app.jaggaer.com/esop/guest/go/opportunity/detail?opportunityId=454 All criteria for the PQQ are included in the link above and on registration to participate in the PQQ. All eligible suppliers will be invited to participate in the tender (ITT) where all relevant critera will be provided.
CPV: Circuit breakers · Electric switchboards · Electrical apparatus for switching or protecting electrical circuits · Switchgear
How this framework works
From the published notice- Type
- Open framework
- Call-offs
- call-offs may be awarded directly or by further competition
- Framework period
- 8 yrs · up to 10 yrs from 1 Jul 2027
Who may buy through it
In addition to the establishing contracting authorities, the Framework may be available for use by other eligible SSE Group entities. The full list of participating entities and any conditions relating to Framework access will be detailed within the Invitation to Tender documentation and the resulting Framework Agreement.
Published description of the framework
Suppliers will be appointed to the Framework following completion of the competitive procurement process described within the procurement documents.
The Framework is anticipated to comprise four lots covering:
- Lot 1 – Conventional CT/VT Fixed-Pattern Switchgear
- Lot 2 – LPIT-Enabled Fixed-Pattern Switchgear
- Lot 3 – Conventional CT/VT Withdrawable Switchgear
- Lot 4 – LPIT-Enabled Withdrawable Switchgear
Suppliers may apply for one, multiple or all lots. Framework appointments will be made separately for each lot.
Framework awards will be made to the suppliers submitting the most advantageous tenders in accordance with the evaluation methodology detailed within the procurement documents.
Public contracts may be awarded either directly or following a competitive selection process between the suppliers appointed to the relevant lot, in accordance with the Framework Agreement.
Prices may be established through supplier framework pricing schedules, agreed pricing mechanisms, project-specific quotations and/or further competition, as detailed within the Invitation to Tender and Framework documentation.
SSEN currently anticipates appointing multiple suppliers to each lot, although the final number of framework suppliers appointed to each lot will be determined through the procurement process and may vary by lot.
Lots and requirements (4)Procurement structure
4 lots · all with a published value · same conditions of participation on every lotEvery one of these 4 lots carries the same published figure, £105,000,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.
Lot #1Conventional CT/VT Fixed-Pattern SwitchgearRenewalceiling above
Design, manufacture, testing, supply and delivery of 11kV indoor metal-enclosed fixed-pattern primary switchgear incorporating conventional current transformer (CT) and voltage transformer (VT) technology. The scope may include associated equipment, technical support, testing, certification, training, warranty, spare parts and lifecycle support services.
- Economic & financial standing
Applicants will be required to demonstrate appropriate economic and financial standing to perform the Framework obligations. This will include provision of financial information and supporting evidence as set out within the procurement documents. Applicants may also be required to provide information relating to insurance arrangements, although evidence of insurance cover will not be required prior to contract award. Equivalent information and evidence will be accepted where appropriate.
- Technical & professional ability
Applicants will be required to demonstrate the technical ability and capability necessary to design, manufacture, test, supply and support 11kV indoor primary switchgear. Assessment may include evidence relating to relevant experience, manufacturing capability, testing capability, product approval status or approval strategy, UK support arrangements, quality management systems, health and safety management arrangements and associated technical resources. Equivalent standards, certifications and evidence will be accepted where appropriate.
Lot #2LPIT-Enabled Fixed-Pattern SwitchgearRenewalceiling above
Design, manufacture, testing, supply and delivery of 11kV indoor metal-enclosed fixed-pattern primary switchgear incorporating low power instrument transformer (LPIT) technology. The scope may include associated equipment, technical support, testing, certification, training, warranty, spare parts, lifecycle support and activities associated with product approval and deployment.
- Economic & financial standing
Applicants will be required to demonstrate appropriate economic and financial standing to perform the Framework obligations. This will include provision of financial information and supporting evidence as set out within the procurement documents. Applicants may also be required to provide information relating to insurance arrangements, although evidence of insurance cover will not be required prior to contract award. Equivalent information and evidence will be accepted where appropriate.
- Technical & professional ability
Applicants will be required to demonstrate the technical ability and capability necessary to design, manufacture, test, supply and support 11kV indoor primary switchgear. Assessment may include evidence relating to relevant experience, manufacturing capability, testing capability, product approval status or approval strategy, UK support arrangements, quality management systems, health and safety management arrangements and associated technical resources. Equivalent standards, certifications and evidence will be accepted where appropriate.
Lot #3Conventional CT/VT Withdrawable SwitchgearRenewalceiling above
Design, manufacture, testing, supply and delivery of 11kV indoor metal-enclosed withdrawable primary switchgear incorporating conventional current transformer (CT) and voltage transformer (VT) technology. The scope may include associated equipment, technical support, testing, certification, training, warranty, spare parts and lifecycle support services.
- Economic & financial standing
Applicants will be required to demonstrate appropriate economic and financial standing to perform the Framework obligations. This will include provision of financial information and supporting evidence as set out within the procurement documents. Applicants may also be required to provide information relating to insurance arrangements, although evidence of insurance cover will not be required prior to contract award. Equivalent information and evidence will be accepted where appropriate.
- Technical & professional ability
Applicants will be required to demonstrate the technical ability and capability necessary to design, manufacture, test, supply and support 11kV indoor primary switchgear. Assessment may include evidence relating to relevant experience, manufacturing capability, testing capability, product approval status or approval strategy, UK support arrangements, quality management systems, health and safety management arrangements and associated technical resources. Equivalent standards, certifications and evidence will be accepted where appropriate.
Lot #4LPIT-Enabled Withdrawable SwitchgearRenewalceiling above
Design, manufacture, testing, supply and delivery of 11kV indoor metal-enclosed withdrawable primary switchgear incorporating low power instrument transformer (LPIT) technology. The scope may include associated equipment, technical support, testing, certification, training, warranty, spare parts, lifecycle support and activities associated with product approval and deployment.
- Economic & financial standing
Applicants will be required to demonstrate appropriate economic and financial standing to perform the Framework obligations. This will include provision of financial information and supporting evidence as set out within the procurement documents. Applicants may also be required to provide information relating to insurance arrangements, although evidence of insurance cover will not be required prior to contract award. Equivalent information and evidence will be accepted where appropriate.
- Technical & professional ability
Applicants will be required to demonstrate the technical ability and capability necessary to design, manufacture, test, supply and support 11kV indoor primary switchgear. Assessment may include evidence relating to relevant experience, manufacturing capability, testing capability, product approval status or approval strategy, UK support arrangements, quality management systems, health and safety management arrangements and associated technical resources. Equivalent standards, certifications and evidence will be accepted where appropriate.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- Economic & financial standing
Applicants will be required to demonstrate appropriate economic and financial standing to perform the Framework obligations. This will include provision of financial information and supporting evidence as set out within the procurement documents. Applicants may also be required to provide information relating to insurance arrangements, although evidence of insurance cover will not be required prior to contract award. Equivalent information and evidence will be accepted where appropriate.
- Technical & professional ability
Applicants will be required to demonstrate the technical ability and capability necessary to design, manufacture, test, supply and support 11kV indoor primary switchgear. Assessment may include evidence relating to relevant experience, manufacturing capability, testing capability, product approval status or approval strategy, UK support arrangements, quality management systems, health and safety management arrangements and associated technical resources. Equivalent standards, certifications and evidence will be accepted where appropriate.
- “FW Supply & Deliver - 11kV Indoor Switchgear - Multi Site 0637” is a framework: the contest is a place on its panel, not a single contract: call-offs may be direct or by further competition.
Competition analysis · published record, not a forecast of who will bid
How Scottish Hydro Electric Power Distribution plc buys Electrical apparatus for switching or protecting electrical circuits (CPV 3121), and who usually turns up
Scottish Hydro Electric Power Distribution plc’s published record next to the market for the same work. Compared with other frameworks and DPS only. Whole-market view: Electrical apparatus for switching or protecting electrical circuits (CPV 3121) →
How the contest usually goes
Winner shares use published awards; bid and price charts use contested lots.
i
How often small and medium firms win.
Share of awards where the winner’s size is known.
The counts under this question show how many awards have a known supplier size.
Small firms have won here. Neither number says whether you qualify; it describes who has been winning.
i
How often local firms win similar work.
Winners with a registered address in the delivery region, out of awards with a known address.
Local means the winner is registered in the region where that award was delivered.
A local branch does not count if the registered address is elsewhere.
Most of this buyer’s recorded winners were registered outside the region where that award was delivered.
i
How long buyers here take to decide after bids close.
Middle value in days from the bid deadline to the award date, on competitions that published both.
Only decided tenders count, so slow ones still waiting are not in.
Half of these awards have an award date within 56 days of the bid deadline.
i
How often work is awarded with no recorded rival.
Direct awards and tenders where every published lot count shows one bid.
Both shares are minimums: some awards have no bid count.
Thin markets produce this too; it is not proof of a tailored specification.
Missing bid counts may hide more single-bid awards. This share is a minimum.
How many bids did past lots attract?
i
How many bids past lots received.
Each colour is a bid-count range. Only competed lots with a published count are included.
Past bids do not predict this tender.
1 bid7%
2–312%
4–638%
7+43%
How did awards compare with estimates?
i
Where winning prices landed against estimates.
Each colour shows awards below, close to or above the published estimate, one lot at a time.
On a framework or DPS, prices are agreed when work is called off.
Past prices are a guide, not a bid price.
Not comparable on a framework or DPS: the price is set later, on each call-off.
Assess each lot i
What past awards tell you about each lot.
See the forecast, this buyer’s earlier suppliers and firms with relevant wins.
No supplier is confirmed as a bidder.
i
What past awards tell you about each lot.
See the forecast, this buyer’s earlier suppliers and firms with relevant wins.
No supplier is confirmed as a bidder.
Open a lot for its forecast, this buyer’s previous supplier and possible competitors, from published award history, not a bid list
Lot #1Conventional CT/VT Fixed-Pattern SwitchgearCPV 3121Published estimate£105m
i
How many bids this lot may attract.
The forecast uses similar past competitions. The bar shows either that forecast or past bid counts; the line below says which.
Each lot shows its own forecast based on its own category; forecasts for different lots of the same notice are not comparative.
A forecast, not a list of bidders.
1 bid0%
2–315%
4–648%
7+36%
i
Where the award price may land.
The forecast uses similar awards and the buyer’s estimate. The band covers the middle half of likely prices.
No comparable awards for this lot yet.
A statistical guide from past awards, not a price to bid.
Who has supplied this buyer on similar work? i
Who has done similar work for this buyer.
Past contracts are matched by buyer, title and type of work.
A past supplier may not bid again.
i
Who has done similar work for this buyer.
Past contracts are matched by buyer, title and type of work.
A past supplier may not bid again.
No earlier contract of this buyer matches this lot on the published record.
Who could compete for this lot? i
Who could compete for this lot?
Firms with relevant past wins. On a framework, we show firms on that agreement.
None is confirmed as a bidder.
i
Who could compete for this lot?
Firms with relevant past wins. On a framework, we show firms on that agreement.
None is confirmed as a bidder.
| Supplier | Won in this category | Live contracts | Award vs estimate |
|---|---|---|---|
ABB LimitedLarge | £7.1m29 awards in 36m · last 1 month ago | 8 live · £90m iPublic contracts this supplier still holds. Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book. Unexpired says nothing about spare capacity. | no comparable pairs |
| £472k7 awards in 36m · last 2 months ago | 5 live · £229k iPublic contracts this supplier still holds. Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book. Unexpired says nothing about spare capacity. | no comparable pairs | |
Brenntag UK LimitedLarge | £727k9 awards in 36m · last 7 months ago | 1 live · £467k iPublic contracts this supplier still holds. Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book. Unexpired says nothing about spare capacity. | no comparable pairs |
| £146k3 awards in 36m · last 11 months ago | None on file | no comparable pairs | |
| £19k2 awards in 36m · last 15 months ago | None on file | no comparable pairs |
Lot #2LPIT-Enabled Fixed-Pattern SwitchgearCPV 3121Published estimate£105m
i
How many bids this lot may attract.
The forecast uses similar past competitions. The bar shows either that forecast or past bid counts; the line below says which.
Each lot shows its own forecast based on its own category; forecasts for different lots of the same notice are not comparative.
A forecast, not a list of bidders.
1 bid0%
2–315%
4–649%
7+36%
i
Where the award price may land.
The forecast uses similar awards and the buyer’s estimate. The band covers the middle half of likely prices.
No comparable awards for this lot yet.
A statistical guide from past awards, not a price to bid.
Who has supplied this buyer on similar work? i
Who has done similar work for this buyer.
Past contracts are matched by buyer, title and type of work.
A past supplier may not bid again.
i
Who has done similar work for this buyer.
Past contracts are matched by buyer, title and type of work.
A past supplier may not bid again.
No earlier contract of this buyer matches this lot on the published record.
Who could compete for this lot? i
Who could compete for this lot?
Firms with relevant past wins. On a framework, we show firms on that agreement.
None is confirmed as a bidder.
i
Who could compete for this lot?
Firms with relevant past wins. On a framework, we show firms on that agreement.
None is confirmed as a bidder.
| Supplier | Won in this category | Live contracts | Award vs estimate |
|---|---|---|---|
| £52m32 awards in 36m · last 1 month ago | 12 live · £35m iPublic contracts this supplier still holds. Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book. Unexpired says nothing about spare capacity. | 3% below n=15 | |
| £9.9m9 awards in 36m · last 1 month ago | 2 live · £6.7m iPublic contracts this supplier still holds. Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book. Unexpired says nothing about spare capacity. | no comparable pairs | |
| £472k7 awards in 36m · last 2 months ago | 5 live · £229k iPublic contracts this supplier still holds. Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book. Unexpired says nothing about spare capacity. | no comparable pairs | |
| £534k6 awards in 36m · last 3 months ago | None on file | no comparable pairs | |
| 1 award in 36m · last 14 months ago | None on file | no comparable pairs |
Lot #3Conventional CT/VT Withdrawable SwitchgearCPV 3121Published estimate£105m
i
How many bids this lot may attract.
The forecast uses similar past competitions. The bar shows either that forecast or past bid counts; the line below says which.
Each lot shows its own forecast based on its own category; forecasts for different lots of the same notice are not comparative.
A forecast, not a list of bidders.
1 bid0%
2–315%
4–648%
7+36%
i
Where the award price may land.
The forecast uses similar awards and the buyer’s estimate. The band covers the middle half of likely prices.
No comparable awards for this lot yet.
A statistical guide from past awards, not a price to bid.
Who has supplied this buyer on similar work? i
Who has done similar work for this buyer.
Past contracts are matched by buyer, title and type of work.
A past supplier may not bid again.
i
Who has done similar work for this buyer.
Past contracts are matched by buyer, title and type of work.
A past supplier may not bid again.
No earlier contract of this buyer matches this lot on the published record.
Who could compete for this lot? i
Who could compete for this lot?
Firms with relevant past wins. On a framework, we show firms on that agreement.
None is confirmed as a bidder.
i
Who could compete for this lot?
Firms with relevant past wins. On a framework, we show firms on that agreement.
None is confirmed as a bidder.
| Supplier | Won in this category | Live contracts | Award vs estimate |
|---|---|---|---|
ABB LimitedLarge | £7.1m29 awards in 36m · last 1 month ago | 8 live · £90m iPublic contracts this supplier still holds. Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book. Unexpired says nothing about spare capacity. | no comparable pairs |
| £472k7 awards in 36m · last 2 months ago | 5 live · £229k iPublic contracts this supplier still holds. Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book. Unexpired says nothing about spare capacity. | no comparable pairs | |
Brenntag UK LimitedLarge | £727k9 awards in 36m · last 7 months ago | 1 live · £467k iPublic contracts this supplier still holds. Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book. Unexpired says nothing about spare capacity. | no comparable pairs |
| £146k3 awards in 36m · last 11 months ago | None on file | no comparable pairs | |
| £19k2 awards in 36m · last 15 months ago | None on file | no comparable pairs |
Lot #4LPIT-Enabled Withdrawable SwitchgearCPV 3121Published estimate£105m
i
How many bids this lot may attract.
The forecast uses similar past competitions. The bar shows either that forecast or past bid counts; the line below says which.
Each lot shows its own forecast based on its own category; forecasts for different lots of the same notice are not comparative.
A forecast, not a list of bidders.
1 bid0%
2–315%
4–648%
7+36%
i
Where the award price may land.
The forecast uses similar awards and the buyer’s estimate. The band covers the middle half of likely prices.
No comparable awards for this lot yet.
A statistical guide from past awards, not a price to bid.
Who has supplied this buyer on similar work? i
Who has done similar work for this buyer.
Past contracts are matched by buyer, title and type of work.
A past supplier may not bid again.
i
Who has done similar work for this buyer.
Past contracts are matched by buyer, title and type of work.
A past supplier may not bid again.
No earlier contract of this buyer matches this lot on the published record.
Who could compete for this lot? i
Who could compete for this lot?
Firms with relevant past wins. On a framework, we show firms on that agreement.
None is confirmed as a bidder.
i
Who could compete for this lot?
Firms with relevant past wins. On a framework, we show firms on that agreement.
None is confirmed as a bidder.
| Supplier | Won in this category | Live contracts | Award vs estimate |
|---|---|---|---|
| £52m32 awards in 36m · last 1 month ago | 12 live · £35m iPublic contracts this supplier still holds. Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book. Unexpired says nothing about spare capacity. | 3% below n=15 | |
| £9.9m9 awards in 36m · last 1 month ago | 2 live · £6.7m iPublic contracts this supplier still holds. Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book. Unexpired says nothing about spare capacity. | no comparable pairs | |
| £472k7 awards in 36m · last 2 months ago | 5 live · £229k iPublic contracts this supplier still holds. Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book. Unexpired says nothing about spare capacity. | no comparable pairs | |
| £534k6 awards in 36m · last 3 months ago | None on file | no comparable pairs | |
| 1 award in 36m · last 14 months ago | None on file | no comparable pairs |
About this data
- Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
- Two views, kept apart. The authority’s own track record and the wider market for the same kind of work sit side by side and are never mixed. Where the local picture is too thin, a figure widens to a broader market and says which one it used.
- Forecasts are labelled. The price forecast and its range, possible competitors and the earlier-work matches are our estimates from past awards: not published facts, not win chances and not price advice. Official notices do not say who is bidding.
- Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.
Procedure terms & legal framework
From the official record- Procedure method
- Competitive flexible procedure
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Goods
- Notice status
- Open admission
- Procurement threshold
- Above threshold (FTS publication)
- Regulatory regime
- Utilities
- Commercial structure
- Framework agreement
- Who may use this agreement
- In addition to the establishing contracting authorities, the Framework may be available for use by other eligible SSE Group entities. The full list of participating entities and any conditions relating to Framework access will be detailed within the Invitation to Tender documentation and the resulting Framework Agreement.
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 21 Sept 2026, 15:57 BST
- Last source update
- 23 Sept 2026, 10:01 BST
- Award evaluation window
- Submission end – 30 Apr 2027
- Authority reference
PQQ_519- FTS notice number
2026/S 000-089302- Latest notice
- Tender notice (UK4)
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-0776c1Find a Tender
- How it runs
All interested parties are welcome to view the Opportunity Listing in our Source to Contract System, Jaggaer. Under 'Current Opportunites' you will find all the details on how to register and be invited to the Pre Qualification Questionnaire in Jaggaer: sse.app.jaggaer.com/esop/guest/go/opport… ↗
All criteria for the PQQ are included in the link above and on registration to participate in the PQQ.
All eligible suppliers will be invited to participate in the tender (ITT) where all relevant critera will be provided.
How to participate & submission route
Official notice Apply via Jaggaer- Requests to participate (first stage)
- 2 Nov 2026, 12:00 GMT
- Appointment period ends
- 2 Nov 2026, 12:00 GMT
- Clarification deadline
- 26 Oct 2026, 12:00 GMT
- Submission channel
- Official e-sourcing portal
- Electronic submission
- Allowed
- Accepted languages
- en
All interested parties are welcome to view the Opportunity Listing in our Source to Contract System, Jaggaer. Under 'Current Opportunites' you will find all the details on how to register and be invited to the Pre Qualification Questionnaire in Jaggaer: sse.app.jaggaer.com/esop/guest/go/opport… ↗
General Jaggaer Supplier Guide can be accessed here: www.sse.com/potential-suppliers ↗ and all questions can be sent to Racahel.Abercrombie@sse.com
All PQQ responses must be submitted via Jaggaer, we will not accept email submissions.
Timeline
21 Sept 2026 → 1 Jul 2027 · 6 dates- Tender notice published37 days ago21 Sept 2026, 15:57 BST
- Latest notice published35 days ago23 Sept 2026, 10:01 BST
- Clarification questions by2 days ago26 Oct 2026, 12:00 GMT
- Today28 Oct 2026
- Admission / appointment period endsin 4 days · period end, not a bid countdown2 Nov 2026, 12:00 GMT
- Award decision expected byin 184 days30 Apr 2027, 23:59 BST
- Contract startsin 245 days1 Jul 2027, 00:00 BST
Notice history
2 events · 2 releases on Find a Tender · since 21 Sept 2026- Tender notice published21 Sept 2026, 15:57 BSTUK4
- Tender notice published23 Sept 2026, 10:01 BSTUK4
Commercial outcome & contract awards
Nothing awarded yet- Awards (0)
- No award published
- Contracts (0)
- No contract published
- Bid statistics
- No aggregate bid statistics published
Contracting authority & participating public bodies
2 public bodies on the noticeConsortium members and other public bodies
- SOUTHERN ELECTRIC POWER DISTRIBUTION PLCContracting authorityPrivate utility
Official documents & specifications (6)
Official links; attachments are not copiedTender pack and attachments
- Bidding documents and specificationsAccess: Additional procurement documents will be issued to applicants who successfully satisfy the Conditions of Participation and are invited to participate in subsequent stages of the competitive flexible procedure. Such documents may include the Invitation to Tender, Framework Agreement, contract conditions, pricing schedules, detailed technical specifications, evaluation criteria, call-off procedures and associated supporting documentation. Documents will be made available electronically through the SSE Jaggaer eSourcing portal.
- Bidding documents and specifications Service Information
- Bidding documents and specifications PQQ Toolbox
- Bidding documents and specifications Procurement Document
Notices published for this procedure
- Tender notice Tender notice on Find a Tender
- Tender notice Tender notice on Find a Tender