Official UK procurement notice
GMCA 1185 Salford Road MRF Equipment
Authority: Greater Manchester Combined Authority (Local council)
What is being bought
Published requirement descriptionUnder the national Resources and Waste strategy and requirements of Simpler Recycling policy, waste collection authorities (WCAs) that are part of the GMCA waste management arrangements will be required to make changes to current dry, mixed recycling (DMR) collections increasing the range of materials to be collected.
The existing materials recovery facility (MRF) at Longley Lane, Sharston does not have the capacity or the sorting equipment required to process these additional materials.
GMCA (the Authority) is therefore looking to procure the design, build, installation, commissioning, and testing of new commingled dry recyclable material processing systems to be installed within the existing building at the Salford Road, Over Hulton, Bolton site to create a new Mechanical Recovery Facility (MRF).
The Salford Road site building has previously operated as an In-Vessel Composting facility and most recently a Bio Transfer Loading Station. The previous equipment has been removed and internal structure of the building refurbished to provide a clean operational space to accommodate new recyclable sorting equipment.
On completion of the works the site will be able to process commingled dry recyclable material collected from households across Greater Manchester, with plant outputs in the form of loose material (glass) or baled recyclable materials, with a capacity 140,000 tonnes per annum of input commingled material.
The new plant is expected to operate across two x 8 hours shifts daily (Monday - Friday) plus one additional 8-hour shift (Saturday). It is expected to employ one 8-hour daily cleaning shift (Monday - Friday).
Maintenance which cannot be completed with the plant "on-line" will be scheduled for non-operational periods, i.e. overnight and at weekends.
The key objectives of the procurement are:
- That the Works are executed with the highest regard for Health and Safety.
- In considering Plant performance, the design and equipment selection shall consider the following objectives:
o High equipment availability
o High equipment reliability over the long term
o Consideration of Capital vs Operational Costs to produce the lowest total cost of ownership
o Minimising low-grade operator roles through the use of automated processes
o The use of AI to enhance capture and purity rates of materials
o Good access for maintenance, demonstrated through HAZOP and Access, Lifting and Maintenance workshops
o Good design and access for regular cleaning
o High capture rate and purity of Aluminium
o High capture rate and purity of natural HDPE
o High capture rate and purity of clear PET
o High capture rate of glass
o High capture rate of film
o Flexibility in the design to allow for the future capture of new materials, or to adapt to changes in market specifications of existing materials (eg purity levels), or to allow integration of AI/automation
Civil works do not form part of this procurement.
Following the Pre-Market Engagement Events, which were carried out on Monday 30th June 2025 and Wednesday 2nd July 2025, the Authority will now commence with the Competitive Flexible Procedure.
The Authority reserves the right to issue updated versions (Modifications) of the documents to Suppliers as and when the need arises, in order to reflect the corresponding stage of the Competitive Flexible Procedure, together with any changes to the Procurement or any other new information.
The Authority also reserves the right following contract award, as reflected in Schedule 8 of the new Procurement Act 2023, to make various Modifications (unforeseen at this moment) as the contract evolves over the full term of the agreement.
In order to bid for this procurement, interested parties must ensure they are registered on the Central Digital Platform (www.gov.uk/find-Tender ↗) and the Chest e-tendering portal (www.the-chest.org.uk ↗).
- How the procedure runs: This Competitive Flexible Procedure (CFP) procurement process is being conducted in adherence with the Procurement Act 2023. This CFP will consist of three stages: Stage 1 - Selection Stage/Conditions of Participation Stage 2 - Invitation to Tender Stage 3 - Detailed Negotiation & Best and Final Offer/Design This Tender Notice will commence the start of Stage 1 of the process. Details of the step-by-step process, and detailed requirements are provided within the documents attached to the opportunity that can be found by visiting the GMCA's e-tendering portal, The Chest: https://www.the-chest.org.uk/
CPV: Engineering-design services for industrial process and production · Miscellaneous special-purpose machinery · Recycling equipment
The lotProcurement structure
single lot · value publishedLot #1RenewalPublished value£20,000,000
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (2)
- Technical: 60%
- Commercial: 40%
Published award criteria (2)
- Technical
- Commercial
- Price carries 40 of 100 points: a 10% discount moves about 4 points. The method statement decides this lot, not the discount.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Competitive flexible procedure
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Goods
- Notice status
- Closed
- Procurement threshold
- Above threshold (FTS publication)
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 16 May 2025, 10:41 BST
- Last source update
- 30 Sept 2025, 17:22 BST
- Award evaluation window
- Submission end – 20 Apr 2026
- Authority reference
GMCA 1185- FTS notice number
2025/S 000-054296- Latest notice
- Tender notice (UK4)
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-051574Find a Tender
- How it runs
This Competitive Flexible Procedure (CFP) procurement process is being conducted in adherence with the Procurement Act 2023.
This CFP will consist of three stages:
Stage 1 - Selection Stage/Conditions of Participation
Stage 2 - Invitation to Tender
Stage 3 - Detailed Negotiation & Best and Final Offer/Design
This Tender Notice will commence the start of Stage 1 of the process.
Details of the step-by-step process, and detailed requirements are provided within the documents attached to the opportunity that can be found by visiting the GMCA's e-tendering portal, The Chest: www.the-chest.org.uk ↗
- Risks
- Known Risk
Due to the volatility of the international economic global economy including (but not limited to) war and conflict, and the trade tariffs imposed by the United States and China in 2025, there is a risk that the supply chain of goods into the United Kingdom could be affected resulting in scarcity of supply and additional or increased costs for the goods. The materialisation of this risk would need to be demonstrated to the Authority by clear evidence of the impact of the global economy on the supply chain and costs of goods to be provided under the Contract as detailed in the Specification. The Authority, acting reasonably, will determine whether they are satisfied with the evidence prior to any modification of the Contract.
How it was run
Official notice- Requests to participate (first stage)
- 17 Oct 2025, 13:00 BST
- Submission deadline
- 17 Oct 2025, 13:00 BST
- Electronic submission
- Allowed
- Accepted languages
- en
All Tenders must be submitted through The Chest, the North West Procurement portal, and can be accessed using the following link: www.the-chest.org.uk ↗. For the avoidance of doubt, submissions made by any other method will not be accepted.
Documents must be downloaded from the Chest and reviewed in detail before Bidders submit any responses.
Timeline
16 May 2025 → 20 Apr 2026 · 8 dates- Planning notice published16 May 2025, 10:41 BST
- Market engagement2 Jul 2025, 23:59 BST
GMCA will be conducting a market engagement event in relation to GMCA 1185 Materials Recovery Facility (MRF) Salford Road, Over Hulton, Bolton.
Market Engagement will take place on: Monday 30th June 2025 and Wednesday 2nd July 2025.
- Session 1 AM 09.00-12.00 inclusive of x3 (20min) 1-2-1 slots available (following the presentation)
- 12.00 - 13.00 Lunch break
- Session 2 PM 13.00-16.00 inclusive of x3 (20min) slots available (following the presentation)
(All sessions will be the same.)
The purpose of this event is to present the project, engage with the market and to inform the procurement process.
Structure of day: Presentation to explain high level detail of the proposed project, opportunity for individual conversations (time slotted) and Site Visit.
Due to the limited capacity of space, booking prior to attendance is imperative. Bookings can be made via Michael Kelly at: Michael.Kelly@greatermanchester-ca.gov.uk
Attendance will be limited to a maximum of 2 representatives per supplier.
Booking Deadline: Friday 27th June 12noon
Timed slots will be allocated upon booking & on a first come first served basis.
Please provide:
- Names of Participants
- Organisation Name
All slides and relevant findings in line with PA23 regulations will be shared publicly following the market engagement events.
Attendance is not mandatory. Non -attendance will not exclude you from participating in this opportunity.
Chest address: The Chest: North West Procurement Portal and reference GMCA 1185 Salford Road MRF. Address: Recycle for Greater Manchester, Solar Farm, Salford Road, Bolton, BL5 1DG
- Next notice expected31 Jul 2025, 23:59 BST
- Tender notice published5 Sept 2025, 13:54 BST
- Latest notice published393 days ago30 Sept 2025, 17:22 BST
- Submission deadline376 days ago17 Oct 2025, 13:00 BST
- Contract starts191 days ago20 Apr 2026, 00:00 BST
- Award decision expected by190 days ago20 Apr 2026, 23:59 BST
Notice history
7 events · 4 releases on Find a Tender · since 16 May 2025- Pipeline notice published16 May 2025, 10:41 BSTUK1
- Preliminary market engagement notice published16 Jun 2025, 16:25 BSTUK2
- Published value published: £20,000,00016 Jun 2025, 16:25 BST
- Tender notice published5 Sept 2025, 13:54 BSTUK4
- Status changed to active5 Sept 2025, 13:54 BST
- Procurement method changed5 Sept 2025, 13:54 BST
- Tender notice published30 Sept 2025, 17:22 BSTUK4
Published amendments (1)
Submission deadline corrected from 23:59 on 17/10/2025 to 13:00 on 17/10/2025 in line with published tender documents
Routine re-releases (4)
- 2025-05: 1 release · 16 May 2025
Contracting authority & participating public bodies
Official documents & specifications (4)
Official links; attachments are not copiedNotices published for this procedure
- Tender notice Tender notice on Find a Tender
- Tender notice Tender notice on Find a Tender
- Preliminary market engagement notice Preliminary market engagement notice on Find a Tender
- Pipeline notice Pipeline notice on Find a Tender