Find a TenderPast planning notice
Published 12 May 2023, 14:22 BST

Official UK procurement notice

Hinkley Point B Decommissioning Waste Processing Facility Design and Build

Official notice

Authority: EDF Energy Nuclear Generation Limited

Works
Planned pipeline valueValue not publishedpipeline notice, not a live tender
Tender notice expected 26 Jun 2023from the planned procurement notice

What is being bought

Published requirement description

The design and build of a Decommissioning Waste Processing Facility (DWPF) is a key requirement to support pre-Care and Maintenance (C&M) decommissioning and waste management activities within Hinkley Point B's Baseline Decommissioning Plan. The DWPF is required to process the significant quantities of Low Level Waste (LLW) arising from the initial phase of decommissioning prior to the site entering an acquiescent state (Care and Maintenance).

CPV: Construction work

The lotProcurement structure

single lot · no lot value published
Lot #1EDF wishes to carry out pre-market engagement with potential tenderers to investigate…Planned

EDF wishes to carry out pre-market engagement with potential tenderers to investigate the current market capability to design and build the Decommissioning Waste Processing Facility (DWPF) at Hinkley Point B power station in Somerset. This may inform EDF in the finalisation of the tender documentation, ensure that the requirements are effectively met and delivered in a procurement that meets market capabilities and requirements. It also provides procurement awareness for suppliers regarding this requirement.

The establishment of a DWPF is a key requirement to support pre-Care and Maintenance (C&M) decommissioning and waste management activities within Hinkley Point B's Baseline Decommissioning Plan. The DWPF is required to process the significant quantities of Low Level Waste (LLW) arising from the initial phase of decommissioning prior to the site entering an acquiescent state (Care and Maintenance).

Delivery: South West · Hinkley Point B Power Station, Nr Bridgwater, Somerset, TA5 1UD

Procedure terms & legal framework

From the official record
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Works
Notice status
Past planning notice
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
12 May 2023, 14:22 BST
Last source update
12 May 2023, 14:22 BST
Authority reference
PCR2/2023/BM
FTS notice number
2023/S 000-013616
Classification (CPV)
Construction work
Delivery area
South West (UKK23)
Official registry OCID
ocds-h6vhtk-03c85f Find a Tender

How it was run

Official notice
Run through: portal not identified

Tender documents are also served through a separate tool: https://pha2.edf.com ↗

Submission deadline
—
Participation fee
document

Timeline

12 May 2023 → 26 Jun 2023 · 2 dates
  1. Notice published
    12 May 2023, 14:22 BST
  2. Tender notice expected
    26 Jun 2023, 00:00 BST

Commercial outcome & contract awards

Pipeline notice
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Contracting authority & participating public bodies

EDF Energy Nuclear Generation Limited

Contracting authorityPrivate company subsidised by the Nuclear Liabilities Fund (NLF)Nuclear Decommissioning GB-COH: 03076445 Javelin House, Building 1420, Charlton Court, Gloucester Business Park, GLOUCESTER, South West, GL3 4AEContact name, email Published organisation website ↗

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.