Modifications to Henderson Dry Dock at the Port of Immingham
Authority: Associated British Ports
What is being bought2 lots · detail below
Published requirement descriptionProcurement of the Principal Contractor for the design and construction of works to modify Henderson Dry Dock, remove RORO (Roll On Roll Off) ramps, partially demolish the sill and undertake remodelling works required to the quay. Please respond to this PIN by email to procurement@abports.co.uk
CPV: Construction work for water projects · Dock construction work · Marine construction works · Quay construction work · Ro-ro terminal construction work
Lots and requirements (2)Procurement structure
2 lots · no lot values publishedLot #1Modifications to Henderson Dry Dock at the Port of Immingham Including Increasing the DepthPlanned
The aim of this project is to increase the draft of vessels can be accommodated in Henderson Dry Dock. The design and construction works to be undertaken by the principal contractor will include, but are not limited to the following main elements: Completion of the design. The Contractor will complete the design of the permanent works and undertake the full design and detail of the temporary works including shoring of the HDD (Henderson Dry Dock) walls and cofferdam. Site establishment and preparations. Construction Works - Installing a cofferdam to the front of the Dry Dock; - Pumping out the Dry Dock; - Install temporary works to restrain dry dock walls - Remove and dispose of the remaining sediment to the base of the dry dock; - Break out and remove sill; - Increase the depth of the dry dock by approximately 1m by means of breaking out or planning concrete; - Removal and disposal of the RORO ramps (concrete slab over steel ramp); - Extend broken back dry dock walls (under RORO Ramp) to ground level and make good surrounding paving; - Associated mooring / quay furniture - Removal of cofferdam and other temporary works; - Performance monitoring of the new structure including undertaking surveys during the defects period.
Lot #2Modifications to Henderson Dry Dock at the Port of Immingham Excluding Works Associated with Increasing the DepthPlanned
The aim of this project is to modify Henderson Dry Dock to meet business requirements without increasing the depth. The design and construction works to be undertaken by the principal contractor will include, but are not limited to the following main elements: Completion of the design. The Contractor will complete the design of the permanent works and undertake the full design and detail of the temporary works. Site establishment and preparations. Construction Works - Install temporary works to allow breaking out of sill; - Break out and remove sill; - Removal and disposal of the RORO ramps (concrete slab over steel ramp); - Extend broken back Dry dock walls (under RORO Ramp) to ground level and make good surrounding paving; - Removal of temporary works;- Associated mooring / quay furniture
Procedure terms & legal framework
From the official record- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Past planning notice
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 1 Aug 2023, 15:32 BST
- Last source update
- 1 Aug 2023, 15:32 BST
- FTS notice number
2023/S 000-022350- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-03ec1fFind a Tender
How it was run
Official notice- Submission deadline
- —
Timeline
1 Aug 2023 → 5 Sept 2023 · 2 dates- Notice published1 Aug 2023, 15:32 BST
- Tender notice expected5 Sept 2023, 00:00 BST
Commercial outcome & contract awards
Pipeline notice- Awards (0)
- No award published
- Contracts (0)
- No contract published
- Bid statistics
- No aggregate bid statistics published
Contracting authority & participating public bodies
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.