Find a TenderPast planning notice
Published 1 Aug 2023, 15:32 BST

Official UK procurement notice

Modifications to Henderson Dry Dock at the Port of Immingham

Official notice

Authority: Associated British Ports

2 lotsWorks
Planned pipeline valueValue not publishedpipeline notice, not a live tender
Tender notice expected 5 Sept 2023from the planned procurement notice
Lots 2see the lot list below

What is being bought2 lots · detail below

Published requirement description

Procurement of the Principal Contractor for the design and construction of works to modify Henderson Dry Dock, remove RORO (Roll On Roll Off) ramps, partially demolish the sill and undertake remodelling works required to the quay. Please respond to this PIN by email to procurement@abports.co.uk

CPV: Construction work for water projects · Dock construction work · Marine construction works · Quay construction work · Ro-ro terminal construction work

Lots and requirements (2)Procurement structure

2 lots · no lot values published
Lot #1Modifications to Henderson Dry Dock at the Port of Immingham Including Increasing the DepthPlanned

The aim of this project is to increase the draft of vessels can be accommodated in Henderson Dry Dock. The design and construction works to be undertaken by the principal contractor will include, but are not limited to the following main elements: Completion of the design. The Contractor will complete the design of the permanent works and undertake the full design and detail of the temporary works including shoring of the HDD (Henderson Dry Dock) walls and cofferdam. Site establishment and preparations. Construction Works - Installing a cofferdam to the front of the Dry Dock; - Pumping out the Dry Dock; - Install temporary works to restrain dry dock walls - Remove and dispose of the remaining sediment to the base of the dry dock; - Break out and remove sill; - Increase the depth of the dry dock by approximately 1m by means of breaking out or planning concrete; - Removal and disposal of the RORO ramps (concrete slab over steel ramp); - Extend broken back dry dock walls (under RORO Ramp) to ground level and make good surrounding paving; - Associated mooring / quay furniture - Removal of cofferdam and other temporary works; - Performance monitoring of the new structure including undertaking surveys during the defects period.

Delivery: Yorkshire & Humber · Port of Immingham
Lot #2Modifications to Henderson Dry Dock at the Port of Immingham Excluding Works Associated with Increasing the DepthPlanned

The aim of this project is to modify Henderson Dry Dock to meet business requirements without increasing the depth. The design and construction works to be undertaken by the principal contractor will include, but are not limited to the following main elements: Completion of the design. The Contractor will complete the design of the permanent works and undertake the full design and detail of the temporary works. Site establishment and preparations. Construction Works - Install temporary works to allow breaking out of sill; - Break out and remove sill; - Removal and disposal of the RORO ramps (concrete slab over steel ramp); - Extend broken back Dry dock walls (under RORO Ramp) to ground level and make good surrounding paving; - Removal of temporary works;- Associated mooring / quay furniture

Procedure terms & legal framework

From the official record
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Works
Notice status
Past planning notice
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
1 Aug 2023, 15:32 BST
Last source update
1 Aug 2023, 15:32 BST
FTS notice number
2023/S 000-022350
Classification (CPV)
Construction work for water projectsDock construction workMarine construction worksQuay construction workRo-ro terminal construction work
Delivery area
Yorkshire & Humber (UKE13)
Official registry OCID
ocds-h6vhtk-03ec1f Find a Tender

How it was run

Official notice
Submission deadline
—

Timeline

1 Aug 2023 → 5 Sept 2023 · 2 dates
  1. Notice published
    1 Aug 2023, 15:32 BST
  2. Tender notice expected
    5 Sept 2023, 00:00 BST

Commercial outcome & contract awards

Pipeline notice
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Contracting authority & participating public bodies

Associated British Ports

Contracting authorityUtilityPort Operator 25 Bedford Street, London, Yorkshire & Humber, WC2E 9ESContact name, email

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.