Find a TenderPast planning notice
Published 19 Oct 2021, 08:33 BST

Official UK procurement notice

PIN - Modern Methods of Construction Supplier Engagement

Official notice

Authority: Great Places Housing Group (Housing)·Consortium: 3 public authorities

3 lotsWorks
Planned pipeline value£4,000,000,000total for 3 lots · pipeline notice, not a live tender
Tender notice expected 15 Nov 2021from the planned procurement notice
Lots 3see the lot list below

What is being bought3 lots · detail below

Published requirement description

The Offsite Homes Alliance wish to engage with MMC (Modern Methods of Construction) suppliers offering categories 1,2,and 5 solutions as defined in the MMC Definition Framework, to evaluate the current OSHA designs and zero carbon roadmap. This is to ensure that the client(s) and the MMC supply chain, are in agreement with the Design for Manufacturing and Assembly (DfMA) strategy, before a full procurement process begins with selected partners.

CPV: Construction materials · Construction work

Lots and requirements (3)Procurement structure

3 lots · no lot values published
Lot #1Pre-Manufacturing - 3D primary structural systemsPlanned

Pre-Manufacturing - 3D primary structural systems

A systematised approach based on volumetric construction involving the production of three-dimensional units in controlled factory conditions prior to final installation. Volumetric units can be brought to the final site in a variety of forms ranging from a basic structure only to one with all internal and external finishes and services installed, all ready for installation.

The system includes structural performance. Full volumetric units in apartment buildings can include apartment space and common area space. Mini volumetric structural units can include bathroom pods and the like which are structurally stacked and loaded.’

Delivery: UK
Lot #2Pre-manufacturing (2D primary structural systems)Planned

Pre-manufacturing (2D primary structural systems)

A systematised approach using flat panel units for basic floor, wall and roof structures of varying materials which are produced in a factory environment and assembled at the final workface to produce a final three-dimensional structure. The most common approach is to use open panels or frames, which consist of a skeletal structure only, with services, insulation, external cladding and internal finishing being installed on site.

‘More complex panels – typically referred to as closed panels – involve more factory-based fabrication and include lining materials and insulation. These may also include services, windows, doors, internal wall finishes and external claddings. The system includes structural performance for primary walls and all floors (note – this excludes unitised or composite external walling systems that are not load bearing included in Category 5).

Delivery: UK
Lot #3Pre-manufacturing (non structural assemblies and sub-assemblies)Planned

Pre-manufacturing (non structural assemblies and sub-assemblies)

A series of different pre-manufacturing approaches that includes unitised non-structural walling systems, roofing finish cassettes or assemblies (where not part of a wider structural building system), non-load bearing mini-volumetric units (sometimes referred to as ‘pods’) used for the highly serviced and more repeatable areas such as kitchens and bathrooms, utility cupboards, risers, plant rooms as well as pre-formed wiring looms, mechanical engineering composites would fall into this category.

‘Conventional masonry site constructed schemes utilising conventional building products such as windows and or door-sets – which might otherwise be part of the fabrication process in the other pre-manufacturing categories – should not be included as sub-assemblies or components in this category unless there is a further level of consolidation from traditional configurations. Also excludes and structural base elements that composite assemblies are fixed to and which are to be included in Cats 1-4. Any structure in this category is purely to support the sub-assembly in transit / install phase.

Delivery: UK

Procedure terms & legal framework

From the official record · publisher note attached
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Works
Notice status
Past planning notice
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
19 Oct 2021, 08:33 BST
Last source update
19 Oct 2021, 09:40 BST
Authority reference
DN573213
FTS notice number
2021/S 000-026062
Classification (CPV)
Construction materialsConstruction work
Delivery area
UK
Official registry OCID
ocds-h6vhtk-02ed22 Find a Tender

Publisher note: Great Places Housing Group is publishing this notice on behalf of The Offsite Homes Alliance (OSHA) which consists of 23 Registered Providers, largely based in the North of England. The alliance partners’ strategy is to deliver circa 10,000+ high quality homes per annum from 2023 onwards across the North, with a focus on as many Modern Methods of Construction (MMC)/off-site technologies it can within reason, to support the ambition. OSHA partners wish to conduct soft market testing (SMT) with MMC suppliers offering categories 1,2,and 5 solutions as defined in the MMC Definition Framework and as set out in the proposed lots above. The purpose of this SMT is to evaluate the current OSHA designs and zero carbon roadmap. This is to ensure that the OSHA members and the MMC supply chain are in agreement with the Design for Manufacturing and Assembly (DfMA) strategy, before OSHA considers moving forward to procurement. As part of the SMT, OSHA has designed a short questionnaire that is available to download from https://www.offsiteha.org/supply-chain-engagement/ . OSHA partners would be grateful for potential suppliers’ time in completing this questionnaire as the responses will be helpful in formulating OSHA’s procurement, design and contracting strategy. OSHA and Great Places may request that potential suppliers discuss their responses through clarification meetings as part of the SMT process. Great Places and OSHA are ensuring that this SMT process is run in a fair and transparent manner. Any relevant information made available in this process will also be made available during any later procurement process. Potential suppliers should note that this notice does not commit Great Places or OSHA to proceeding to procurement at the time indicated or at all. If there are any queries about the process, please contact robert.ireland@greatplaces.org.uk.

How it was run

Official notice
Submission deadline
—

Timeline

19 Oct 2021 → 15 Nov 2021 · 2 dates
  1. Notice published
    19 Oct 2021, 09:40 BST
  2. Tender notice expected
    15 Nov 2021

Notice history

1 event · 2 releases on Find a Tender
  1. Buyer details updated
    19 Oct 2021, 09:40 BST
Published amendments (1 · 0 deadline changes)
WhenWhatBeforeAfterShift
—TextName and addresses · I.1Off-Site Homes Alliance Norfolk House, Hardwick Square North Buxton SK17 6PUGreat Places Housing Group 2A Derwent Avenue West Didsbury Manchester M21 7QP

Incorrect address entered on first submission

Commercial outcome & contract awards

Pipeline notice
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Contracting authority & participating public bodies

2 public bodies on the notice

Great Places Housing Group

Contracting authorityHousingBody governed by public lawHousing and community amenities 2A Derwent Avenue, Manchester, UK, M21 7QPContact name, email, phone

Consortium members and other public bodies

  • Off-Site Homes AllianceContracting authority Buxton, UKContact email

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.