Find a TenderPast planning notice
Published 15 Nov 2023, 14:56 GMT

Official UK procurement notice

Rapid Response & Tunnel Access Services for the Thames Tideway Tunnel - Market Engagement

Official notice

Authority: Bazalgette Tunnel Limited t/a Tideway

Services
Planned pipeline valueValue not publishedpipeline notice, not a live tender
Tender notice expected 26 Feb 2024from the planned procurement notice

What is being bought

Published requirement description

Rapid Response & Tunnel Access Services for the Thames Tideway Tunnel - Market Engagement:

Following completion of the Works on the Thames Tideway Tunnel (TTT) project, Tideway is responsible for maintaining the TTT network during the System Acceptance period which currently runs from approximately mid 2025 for a minimum of 18 and up to a 36 month period.

Tideway is therefore exploring service delivery options for rapid response & tunnel access capability across the 21 project sites during the System Acceptance period.

Tideway is inviting suppliers in relevant industries to respond initially to a market engagement questionnaire so that Tideway can better understand the industry, its capabilities, capacity and appetite for a potential service package.

To express interest in this opportunity and to receive the market engagement documentation, suppliers should register through emailing procurement@tideway.london with relevant organisation and individual contact details.

Suppliers who register will then be provided with a market engagement briefing paper which will provide further details of the package in question and a market engagement questionnaire for review and completion for issue back to Tideway. Information provided will assist with internal procurement planning prior to issue of Pre-Qualification Questionnaire, currently planned for March 2024.

Further details of the Thames Tideway Tunnel Project can be found at www.tideway.london ↗.

CPV: Architectural, construction, engineering and inspection services · Civil engineering machinery · Construction equipment · Construction management services · Construction project management services · Cranes · Hire of cranes with operator · Tunnel operation services · Tunnelling works

The lotProcurement structure

single lot · no lot value published
Lot #1Rapid Response & Tunnel Access Services for the Thames Tideway Tunnel - Market Engagement:Planned

Rapid Response & Tunnel Access Services for the Thames Tideway Tunnel - Market Engagement:

The Thames Tideway Tunnel (TTT) is 25km (15.5m) long, stretching from Acton in west London to Abbey Mills Pumping Station in the east, and is built on a gradient so flows travel west to east. At its deepest, it is 67m underground (33m at its shallowest) and the internal diameter of the tunnel is 7.2m. There are 21 shafts constructed on the project which will be used to divert sewage flows from London’s existing Victorian sewage network to the new 25-kilometre tunnel, which range in depth from c.35-c.65 metres across the project.

Following completion of the Works on the TTT project, Tideway is responsible for maintaining the TTT network during the System Acceptance period which currently runs from approximately mid 2025 for a minimum of 18 and up to a 36-month period. Tideway is therefore exploring service delivery options for rapid response & tunnel access capability across the 21 project sites during the System Acceptance period.

The Service consists of three core elements to be delivered by the Contractor which are summarised as follows:

  1. Rapid response tunnel access: In support of search and rescue missions that will be carried out by Tideway’s Search & Rescue Contractor.

Tideway’s Search & Rescue Contractor may be called upon at any time to undertake search and rescue missions in the TTT network. For example, they may be called upon to locate and rescue intruders. Whilst the Search & Rescue Contractor will provide the specialist rescue teams and equipment, their entry to and egress from the tunnel network will be facilitated by the Contractor who will provide the lifting plant and people-carrier baskets that can be rapidly deployed at two project locations simultaneously.

  1. Planned tunnel access: In support of tunnel inspections and repairs that will be carried out by Tideway’s Inspection Services Contractor and Others as appropriate.

Tideway’s Tunnel Inspection Contractor will undertake a detailed inspection of the TTT network under a planned tunnel shutdown during the System Acceptance Period. If the inspections uncover defects and/or high levels of sediment in the tunnels that require removal, then a further planned tunnel shutdown may be required during the System Acceptance Period to facilitate the repairs and sediment removal by Other Contractors.

The Contractor will manage the tunnel shutdowns; provide temporary air ventilation; provide over pumping and tankering; facilitate the Tunnel Inspection Contractor’s and Other Contractors with access to and egress from the tunnels by providing the lifting plant and carrier baskets at up to twenty-one project locations simultaneously.

  1. Rapid response access to remove blockages: From near surface parts of the tunnel infrastructure.

When instructed by Tideway, the Contractor will be responsible for the removal of blockages from near surface civil structures (called vortex generators) at any time during the System Acceptance Period. The Contractor will provide the plant and the people that can be rapidly deployed to undertake the removal.

Further details of the Thames Tideway Tunnel Project can be found at www.tideway.london ↗.

Delivery: UK · Various site locations across London, more specifically described in the market engagement documents.

Procedure terms & legal framework

From the official record · publisher note attached
Legal basis
CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
Procurement category
Services
Notice status
Past planning notice
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
15 Nov 2023, 14:56 GMT
Last source update
15 Nov 2023, 14:56 GMT
FTS notice number
2023/S 000-033793
Classification (CPV)
Architectural, construction, engineering and inspection servicesCivil engineering machineryConstruction equipmentConstruction management servicesConstruction project management servicesCranesHire of cranes with operatorTunnel operation servicesTunnelling works
Delivery area
UK
Official registry OCID
ocds-h6vhtk-041a14 Find a Tender

Publisher note: Rapid Response & Tunnel Access for the Thames Tideway Tunnel - Market Engagement: Following completion of the Works on the Thames Tideway Tunnel (TTT) project, Tideway is responsible for maintaining the TTT network during the System Acceptance period which currently runs from approximately mid 2025 for a minimum of 18 and up to a 36 month period. Tideway is therefore exploring service delivery options for rapid response & tunnel access capability across the 21 project sites during the System Acceptance period. Tideway is inviting suppliers in relevant industries to respond initially to a market engagement questionnaire so that Tideway can better understand the industry, its capabilities, capacity and appetite for a potential service package. To express interest in this opportunity and to receive the market engagement documentation, suppliers should register through emailing procurement@tideway.london with relevant organisation and contact details. Suppliers who register will then be provided with a market engagement briefing paper, which will provide details of the package in question and key dates etc, and a market engagement questionnaire for review and completion. This exercise is being carried out in advance of any formal procurement process. It is not a pre-qualification or tendering exercise. Tideway is under no obligation to issue any procurement opportunity as a result of this engagement exercise, and this exercise should not be taken as any indication of intent. The market engagement process may be terminated or suspended at any time without cost or liability to Tideway. No contractual rights, express or implied, arise out of this Periodic Indicative Notice or the procedures envisaged by it.

How it was run

Official notice
Submission deadline
—

Timeline

15 Nov 2023 → 26 Feb 2024 · 2 dates
  1. Notice published
    15 Nov 2023, 14:56 GMT
  2. Tender notice expected
    26 Feb 2024

Commercial outcome & contract awards

Pipeline notice
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Contracting authority & participating public bodies

Bazalgette Tunnel Limited (trading as Tideway)

Contracting authorityDesign, finance, construct and operate the Thames Tideway Tunnel Cottons Centre, Cottons Lane, London, London, UK, SE1 2QGContact email, phone

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.