Official UK procurement notice
Replacement of the ECMB Chillers
Authority: APUC Ltd (Public body)
What is being bought
Published requirement descriptionThe Scottish Association for Marine Science are intending to publish an ITT for a main Contractor to carry out the Replacement of the ECMB Chillers in February 2025
CPV: Cooling and ventilation equipment
The lotProcurement structure
single lot · no lot value publishedLot #1SAMS Facilities department are responsible for building maintenance and…Planned
SAMS Facilities department are responsible for building maintenance and refurbishment/alteration projects on site. They have identified the need to progress with the following project and require a suitable main Contractor to undertake the works to the specification requirements.
This is a lifecycle/net zero decarbonisation project:
The existing cooling only chillers are to be replaced with modern high efficiency Air Source Heat Pumps which will provide cooling and heating.
Main Objective;
As a lifecycle/condition based replacement project which will provide another step in SAMS operational resilience and meet UK and Scottish Government Net Zero targets for decarbonisation of buildings.
In order to make this project achieve maximum energy and carbon saving benefits, we have an outline specification of requirements, subject to final design by completion by M&E consultants, which includes:
-Replacement of Cooling only chillers with combined heating and cooling function provides additional capability and by feeding Heating capacity into the existing fossil fuel powered LTHW system this will reduce fossil fuel usage
-Low to very low GWP refrigerant and reduced quantities over existing chillers which will achieve large F-Gas Tco2e savings
-Variable Speed Drive and multi compressor units to allow demand driven running (existing units are single compressor start-stop units) which provide extensive energy saving capability
-Incorporation of Free cooling capacity and a thermal store to integrate with our site BMS system control to charge at most economical periods providing an additional energy saving function.
-Incorporation of waste heat recovery within ASHP units to harvest all waste energy and provide further energy savings and fossil fuel use reduction
-Hydraulic Simulation and optimisation of design approved through Hysopt (or equivalent) HVAC modelling software
-Incorporate a Soft landings type follow up performance review/recommissioning to ensure system is operating at maximum efficiencies through year 1 and going forward thereafter
-Incorporate any other innovative technology provided by suppliers as part of their procurement proposals which will enhance the benefits of the new installation
Desired Outcomes;
An energy efficient cooling system with all possible decarbonisation and energy reduction methods incorporated which will provide effective cooling and supplementary heating output to the ECMB wing. Installed and commissioned by end of November 2025.
ITT to be issued in February 2025 with contract award before 31st March 2025
Procedure terms & legal framework
From the official record · publisher note attached- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Goods
- Notice status
- Past planning notice
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Unspecified in notice
- First published
- 12 Dec 2024, 15:27 GMT
- Last source update
- 12 Dec 2024, 15:27 GMT
- Authority reference
CS-SAMS-35299- FTS notice number
2024/S 000-040126- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-04c798Find a Tender
Publisher note: NOTE: To register your interest in this notice and obtain any additional information please visit the Public Contracts Scotland Web Site at https://www.publiccontractsscotland.gov.uk/Search/Search_Switch.aspx?ID=785637. (SC Ref:785637)
How it was run
Official notice- Submission deadline
- —
Timeline
12 Dec 2024 → 3 Feb 2025 · 2 dates- Notice published12 Dec 2024, 15:27 GMT
- Tender notice expected3 Feb 2025
Commercial outcome & contract awards
Pipeline notice- Awards (0)
- No award published
- Contracts (0)
- No contract published
- Bid statistics
- No aggregate bid statistics published
Contracting authority & participating public bodies
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.