Roscrow Wind Turbine Supply
Authority: University of Exeter (Central government)
What is being bought
Published requirement descriptionThe University intends to procure a single wind turbine and associated service & maintenance agreement to position on its land at Tremough.
The Turbine must meet specific criteria set out by Cornwall Council planning requirements and the selected turbine is the only one that meets these criteria.
CPV: Wind turbines
The lotProcurement structure
single lot · no lot value publishedLot #1The University has the requirement to procure a single wind turbine and associated…
The University has the requirement to procure a single wind turbine and associated service & maintenance agreement which complies with the Cornwall Council planning requirements for wind turbines. An EWT turbine has been selected for the below reasons:
- The selected turbine meets the national planning policy requirements in respect of sound levels at residential receptors, where these levels might be exceeded, the turbine must be capable of depowering to reduce sound output or curtailing operation completely.
- Ecological surveys confirm the presence of several bat species, some rare, therefore the selected turbine must have the capability to provide programmed start up of the rotor to mitigate against bat mortality which is most likely at normal wind turbine start up conditions. Time of day/seasonal curtailments will also be required if bat mortality levels are excessive.
- Due to electricity network reverse power congestion, the selected turbine has the capability to provide an ‘Active Network Management’ (ANM) connection. This will require that the turbine curtails or reduces generation at times of network stress. This action is automated, being controlled by signals sent by the network; power down to the acceptable level must be actioned within 5 seconds.
The only manufacturer that offers this level of control performance on a turbine of the required size is EWT, the 54x model with 50m hub height is selected from the EWT range as the model that will deliver the most energy, whilst conforming to the Cornwall Council planning policy that requires new wind turbines being placed close to existing machines, to be of a similar size.
Procedure terms & legal framework
From the official record- Procedure method
- Negotiated without publication of a contract notice
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Goods
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Unspecified in notice
- First published
- 7 Feb 2025, 11:16 GMT
- Last source update
- 7 Feb 2025, 11:16 GMT
- Authority reference
UOE/2024/093/DB- FTS notice number
2025/S 000-004129- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-04dca7Find a Tender
- Why no open competition
The works, supplies or services can be provided only by a particular economic operator due to absence of competition for technical reasons
- Published justification
The University has the requirement to procure a single wind turbine and associated service & maintenance agreement which complies with the Cornwall Council planning requirements for wind turbines. An EWT turbine has been selected for the below reasons:
- The selected turbine meets the national planning policy requirements in respect of sound levels at residential receptors, where these levels might be exceeded, the turbine must be capable of depowering to reduce sound output or curtailing operation completely.
- Ecological surveys confirm the presence of several bat species, some rare, therefore the selected turbine must have the capability to provide programmed start up of the rotor to mitigate against bat mortality which is most likely at normal wind turbine start up conditions. Time of day/seasonal curtailments will also be required if bat mortality levels are excessive.
- Due to electricity network reverse power congestion, the selected turbine has the capability to provide an ‘Active Network Management’ (ANM) connection. This will require that the turbine curtails or reduces generation at times of network stress. This action is automated, being controlled by signals sent by the network; power down to the acceptable level must be actioned within 5 seconds.
The only manufacturer that offers this level of control performance on a turbine of the required size is EWT, the 54x model with 50m hub height is selected from the EWT range as the model that will deliver the most energy, whilst conforming to the Cornwall Council planning policy that requires new wind turbines being placed close to existing machines, to be of a similar size.
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| Emergya Wind Technologies (EWT) DirectWind UK LtdRoscrow Wind Turbine and associated service & maintenance agreement | £1,550,000 † | — | Awarded |
Contracts
Roscrow Wind Turbine and associated service & maintenance agreement · Emergya Wind Technologies (EWT) DirectWind UK Ltd
- Signed
- 22 Jan 2025
- Value
- £1,550,000
- Status
- active
Contracting authority & participating public bodies
Dispute resolution & review bodies
- Royal Court of JusticeReview body
Bidders & participating suppliers
1 commercial party on the notice- Emergya Wind Technologies (EWT) DirectWind UK LtdAwarded supplier
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.