Official UK procurement notice
Scheduled heavy maintenance of GWR's Fleet of 45 x Class 387 Electric Multiple units.
Authority: FIRST GREATER WESTERN LIMITED (Public body)
What is being bought
Published requirement descriptionThe current heavy maintenance requirements are a combination of mileage and time based events and it is proposed to align these into a weeklong single event for each unit. It should be assumed that one unit will be out of service at any one time for this programme.
This project shall be carried out as a turnkey solution, with the scope of work including; engineering design/approvals, project management, parts supply (limited scope of consumables only), overhaul and installation activities, logistics and approvals.
CPV: Installation services of electrical and mechanical equipment · Repair, maintenance and associated services related to aircraft, railways, roads and marine equipment
The lotProcurement structure
single lot · no lot value publishedLot #1First Greater Western Limited are seeking expressions of interest for the scheduled…
First Greater Western Limited are seeking expressions of interest for the scheduled heavy maintenance of its Fleet of 45 x Class 387 Electric Multiple units.
The current heavy maintenance requirements are a combination of mileage and time based events and it is proposed to align these into a weeklong single event for each unit. It should be assumed that one unit will be out of service at any one time for this programme.
A summary of the heavy maintenance jobs can be found via the link provided in this notice.
This project shall be carried out as a turnkey solution, with the scope of work including; engineering design/approvals, project management, parts supply (limited scope of consumables only), overhaul and installation activities, logistics and approvals.
The heavy maintenance works will be carried out off-site at the Supplier's location. The Supplier will be responsible for vehicle movements between Reading Tran Care Depot and the Supplier's works facility. The Supplier must have a stringent in-house quality control system and a thorough competence management system.
It is anticipated that the heavy maintenance programme will start May 2023, with a completion date of no later than July 2024.
Procedure terms & legal framework
From the official record- Procedure method
- Negotiated procedure with prior call for competition
- Legal basis
- CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
- Procurement category
- Services
- Notice status
- Closed
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 30 Aug 2022, 09:58 BST
- Last source update
- 31 Aug 2022, 10:11 BST
- FTS notice number
2022/S 000-024232- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-0363e2Find a Tender
How it was run
Official notice- Submission deadline
- 29 Sept 2022
- Submission channel
- {"written"}
- Accepted languages
- en
Timeline
31 Aug 2022 → 29 Sept 2022 · 2 dates- Notice published31 Aug 2022, 10:11 BST
- Submission deadline29 Sept 2022
Notice history
2 releases on Find a TenderPublished amendments (1)
Please register your interest via the link provided below : http://redirect.transaxions.com/events/oZ1zZ
Contracting authority & participating public bodies
Dispute resolution & review bodies
- High CourtReview body
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.