Official UK procurement notice
Support of ALE 47 AND M147 Counter Measure Dispensing Systems (CMDS)
Authority: Ministry of Defence (Central government)
What is being bought
Published requirement descriptionThe through-life support of ALE-47 and M-147 Counter Measure Dispensing Systems (CMDS) fitted to the following platforms: Chinook (all marks), C-130, Puma and Merlin Mk.2 and Mk.4 aircraft.
CPV: Repair and maintenance services
The lotProcurement structure
single lot · no lot value publishedLot #1Repair, Maintenance, Technical Engineering Support and associated Spares Provision
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- Lowest price
Procedure terms & legal framework
From the official record- Procedure method
- Negotiated without publication of a contract notice
- Legal basis
- CELEX · 32009L0081 Defence and Security Public Contracts Regulations 2011 (Directive 2009/81/EC)
- Procurement category
- Services
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 1 Aug 2022, 11:58 BST
- Last source update
- 1 Aug 2022, 11:58 BST
- FTS notice number
2022/S 000-020939- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-0357caFind a Tender
- Why no open competition
The products involved are manufactured purely for the purpose of research, experiment, study or development under the conditions stated in the directive; The works, supplies or services can be provided only by a particular economic operator due to absence of competition for technical reasons
- Published justification
Air Platform Systems Delivery Team, part of the Ministry of Defence (“the Authority”), intends to enter into a contract with BAE Systems Ltd (“BAE”)) for the through-life support of ALE-47 and M-147 Counter Measure Dispensing Systems (CMDS)(“the Contract”) including repair, maintenance, technical engineering support and associated spares provision. This equipment for which BAE is the original equipment manufacturer and design authority is fitted to the following platforms: Chinook (all marks), C-130, Puma and Merlin Mk.2 and Mk.4 aircraft. The length of the new contract will be three years with two additional individual option years (3+1+1). The approximate value of the Contract is estimated to be £5 million ex VAT including the exercise of the option years.
In accordance with regulation 4 of The Defence and Security Public Contracts (Amendment) (EU Exit) Regulations 2019 (SI 2019/697) this procurement falls to be regulated under the provisions of the Defence and Security Public Contracts Regulations 2011 as amended (in particular by SI 2019/697 and SI 2020/1450). Prior publication of a contract notice in the Official Journal of the European Union is no longer appropriate. It is considered that the award of the contract without prior publication of a contract notice in the UK e-notification service (in accordance with the relevant legislation) is lawful in accordance with Regulation 16(1)(a)(ii) of the DSPCR 2011 on the basis that BAE alone can carry out the services under it for technical reasons.
This Single Source Justification is based on a Safety Assurance grounds. As the Original Equipment Manufacturer (OEM) and DAOS approved organisation for ALE-47 (UK.MAA.DAOS.0376), only BAE Systems have sufficient access to technical and safety information and competency to provide the safety assurance APS DT requires.
A key requirement for APS DT from a Design Organisation is the “DO Safety Assessment and Report”. This outlines the DO arguments and supporting evidence that the equipment is safe to operate, including identification of hazardous materials contained within the equipment. This evidence is contained in our Commodity Safety Assessment Report (CSAR), which is a fundamental component of our End Users Air System Safety Case. Only BAE Systems, as the OEM, now has access to the necessary data.
Finally, in order for BAE Systems to provide this safety assurance, they must ensure configuration control is maintained and repair activity is carried out correctly. For this to be assured, responsibility for both activities must be held by the same organisation. Only an OEM or a Contractor that has been licensed by the OEM can support the requirement and the OEM confirms that it will not license another contractor to carry out the necessary work
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION INC.Subcontracting: declared | US$5,000,000 † | — | Awarded |
Contracts
Support of ALE 47 AND M147 Counter Measure Dispensing Systems (CMDS) · BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION INC.
- Signed
- 25 Jul 2022
- Value
- US$5,000,000
- Status
- active
Contracting authority & participating public bodies
Dispute resolution & review bodies
- DE&SReview body
Bidders & participating suppliers
1 commercial party on the notice- BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION INC.Awarded supplier
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.