Toilet Demolition, Design and Rebuild

Official notice

Authority: Wareham Town Council (Local council)

WorksOpen procedure
Published estimate£140,000exc. VAT
Submissions closed 31 Jan 2025
Contract term 3 moends 30 Jun 2025 · extension options published · starts 31 Mar 2025

What is being bought

Published requirement description

Wareham Town Council invites tenders from experienced and qualified contractors for the demolition, design, and construction of the public toilets located in Howard's Lane, Wareham, BH20 4HU.

This project must meet the Council's requirements for modern

public amenities, be sensitive to the historic character of the area, and include pay-to use functionality, as well as disability-friendly provisions.

The contract value for this project is £140,000, inclusive of all works, in accordance with UK public procurement legislation and the Public Contracts Regulations 2015, which govern this tender process.

CPV: Construction work

The lotProcurement structure

single lot · value published
Lot #1SCOPE OF WORK 3 moPublished value£140,000

SCOPE OF WORK

Demolition Works

  • Safe demolition and removal of the existing public toilet structure.
  • Disposal of all waste materials in accordance with environmental and regulatory standards.
  • Ensuring practicable measures to minimise disruption to the surrounding area and residents during demolition.
  • Ensuring and arranging cap off work for utilities on site for the required duration.

3.2 Potential for Rectification of Structural Integrity Issues

Wareham Town Council will also consider tenders proposing works which will rectify existing structural integrity issues within the building such as rising damp in place of a demolition.

Should the tender proposal rectify the building's structural integrity issues, the redesign of the facilities within the building must still be in-keeping with the Council's vision for the facility outlined below.

Design Requirements

  • Architectural Design: The new toilet block must reflect the character and heritage of the Wareham Conservation Area. The design must incorporate traditional materials (e.g., brick, stone, timber) and be sensitive to the heritage of the area, as outlined in the Wareham Neighbourhood Plan.

Functional Layout: The facility must be well-planned to offer:

  • Unisex, self-contained toilet facilities integrated with accessibility features such as wide doorways, grab rails, and accessible cubicles.
  • A pay-to-use entry system, designed to ensure ease of use for all visitors, including those with disabilities.
  • Baby changing facilities in all sections.
  • Durable fixtures and fittings that are vandal-resistant and easy to clean.

Pay-to-Use System: A pay-to-use entry mechanism must be installed. This system should:

  • Be modern and robust allowing contactless payments (e.g., via card or mobile payment).
  • Be fully accessible for individuals with disabilities.
  • Include appropriate signage and user instructions.

Sustainability and Accessibility: The facility should be energy and water efficient, incorporating low-flush toilets, sensor-activated lighting, and eco-friendly materials where practicable, cost-effective and in keeping with planning requirements. The toilets

must comply with UK building regulations, including Part M (Access to and Use of Buildings), and should ideally avoid the need for a separate disabled cubicle by incorporating accessibility into the main male and female sections.

Construction Works

  • Construction of the toilet block in line with approved designs and compliance with all relevant building regulations.
  • Installation of utilities (water, drainage, electricity), the pay-to-use system, and fixtures.
  • External landscaping, if required, to integrate the building within its surroundings.
  • Ensuring the safety of the site throughout construction and minimising disruption to the public.

Health and Safety

The contractor must submit a detailed Health and Safety Plan covering both the demolition and construction phases of the project. This plan must include:

  • Measures for ensuring worker and public safety on and around the site.
  • Compliance with the Construction (Design and Management) Regulations 2015 (CDM Regulations) and provision of a Construction Phase Plan to be approved by the Town Council prior to work commencing on-site.

Planning Permission and Building Regulations

The successful contractor will be responsible for ensuring that all works comply with the planning permissions and building regulations applicable to the project. The design

and construction must adhere to:

The Wareham Neighbourhood Plan and guidelines for the Wareham Conservation Area.

  • Relevant sections of the Town and Country Planning Act 1990.
  • UK Building Regulations, particularly Part M (Access to and Use of Buildings) and any additional local conservation requirements.

The contractor carries the onus and final responsibility for securing planning and any other required permissions.

Sustainability and Accessibility The design and construction of the new public toilets must promote environmental sustainability and full accessibility for all users. In line with best practices, the contractor must:

  • Utilise eco-friendly materials and construction methods, including the use of recycled materials where feasible and low VOC paints.
  • Wareham Town Council favours designs and constructions which incorporate or include sustainable energy generation features such as solar panels, photovoltaic equipment, etc.
  • Incorporate energy-efficient technologies, such as low-flush toilets, sensor activated lighting, and other water- and energy-saving devices.
  • Ensure compliance with Part M of the Building Regulations, providing wide doorways, grab rails, and accessible cubicles integrated within the male and female facilities. Tactile signage should be installed for visually impaired users.

These sustainability and accessibility features should be clearly outlined in the contractor's design proposal and will be a key evaluation criterion.

Defects Liability Period

The successful contractor will be required to provide a Defects Liability Period of 12 months from the date of practical completion of the works. During this period, the contractor shall be responsible for rectifying any defects or faults arising from the

construction at their own cost.

Retention

The retention amount to be held over the Rectification Period will be 2.5% of the contract sum. Subject to the satisfactory remedying of all defects the retention will be released to the contractor at the expiry of the Rectification Period which shall be

mutatis mutandis the Due Date for Payment.

Defects Correction

During the Defects Liability Period, any defects identified must be corrected by the contractor within a reasonable timeframe, not exceeding 14 days from notification. Persistent failure to correct defects may result in the council seeking remedial action at

the contractor's expense.

Warranties and Guarantees

The contractor shall provide a minimum two-year warra…

Contract period: 31 Mar 2025 – 30 Jun 2025 (3 mo)
Delivery: South West · Howard's Lane, Wareham, BH20 4HU
Extensions: Proposed timeline available in tender specification.Variant bids: allowed

Procedure terms & legal framework

From the official record
Procedure method
Open procedure
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Works
Notice status
Closed
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
No (one-off requirement)
First published
18 Oct 2024, 16:51 BST
Last source update
18 Oct 2024, 16:51 BST
Award evaluation window
5 Feb 2025 – …
FTS notice number
2024/S 000-033839
Classification (CPV)
Construction work
Delivery area
South West (UKK)
Official registry OCID
ocds-h6vhtk-04af47 Find a Tender

How it was run

Official notice
Submission deadline
31 Jan 2025, 23:59 GMT
Submission channel
{"written"}
Accepted languages
en
Bids opened
5 Feb 2025, 10:00 GMT

Timeline

18 Oct 2024 → 31 Mar 2025 · 4 dates
  1. Notice published
    18 Oct 2024, 16:51 BST
  2. Submission deadline
    31 Jan 2025, 23:59 GMT
  3. Bids opened
    5 Feb 2025, 10:00 GMT
  4. Contract starts
    31 Mar 2025, 00:00 BST

Contracting authority & participating public bodies

Wareham Town Council

Contracting authorityLocal CouncilRegional or local agency/officeGeneral public services Town Hall,East Street, WAREHAM, South West, BH204NSContact name, email, phone Published organisation website ↗