Find a TenderAwarded
Published 13 Feb 2025, 18:19 GMT

Official UK procurement notice

Track Systems · UK public procurement notice

Official notice

Authority: High Speed Two (HS2) Limited (Public body)

Framework agreement4 lotsWorksNegotiated procedure with prior call for competition
Framework ceiling (notional)Value not publishedframework ceiling, not attributable revenue
Awarded 15 Jan 2025
Lots 4see the lot list below

What is being bought4 lots · detail below

Published requirement description

This procurement relates to track systems and HS2 Ltd has awarded the following contracts:

  1. Delivery contract for Track - Urban (Lot 1 below)
  2. Delivery contract for Track – Open Route Central (Lot 2 below)
  3. Delivery contract for Track – Open Route North including Birmingham Spur (Lot 3 below)
  4. Framework Agreement for Track delivery and other works (see Lot 4 below)

Further information about the scope of works and the lots is set out in the remainder of this Contract Notice.

Economic operators may have only expressed an interest in Lot 4 if they have also expressed an interest in one or more of Lots 1, 2 & 3.

HS2 Ltd invoked an exceptional circumstance detailed in the ITT to award Lots 1, 2 and 3 to a single Tenderer.

CPV: Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

How this framework works

From the published notice
Bids received
4 bids received · 3 suppliers appointed

Lots and requirements (4)Procurement structure

4 lots · no lot values published · same evaluation weights on every lot
Lot #1Track - UrbanAwarded

The scope of the Lot 1 works includes the installation of all track infrastructure within the

Urban geographical area, which includes stations, open route, bored tunnels and cut and-

cover tunnels.

The track infrastructure incorporates the design and construction of:

  • resilient and standard cast in-situ slab track;
  • standard pre-cast slab track (a separate supply arrangement);
  • mainline Switches & Crossings (S&C) units and Rail Expansion Devices (REDs) on a combination of the aforementioned track forms (a separate supply arrangement);
  • the above includes the construction of any Hydraulically Bonded Layer (HBL) or intermediate concrete layers, sleeper blocks or pre-cast elements, and the installation of long welded rails (to be supplied free-issue to the Contractor);
  • buffer stops - a combination of permanent and temporary units to support a phased entry into service;
  • track spacing infill to provide drainage continuity to drainage systems installed by others;
  • cable containment (troughing), to support the routing of HV and LV cables;
  • provision of (and subsequent removal of) a temporary railhead at West Ruislip for used for construction purposes; and
  • a permanent maintenance facility at West Ruislip.

The Lot 1 works include the development of the detailed design for all track infrastructure

within the Urban geographical area, and full integration of this design with the works of

others including Main Work Civils and Railway Systems packages. This Lot also includes

the undertaking of static integration testing of the track system, as well as providing onsite

support and facilitation of the dynamic testing phase coordinated by the client.

The Lot 1 works also include Principal Contractor duties under the Construction (Design

and Management) Regulations 2015 for the line of route up to and including the

permanent boundary, plus any railheads or temporary construction compounds required

to support the delivery of the works. This Principal Contractor role requires the provision

of support to the client to manage the integration and prioritisation of construction

activities, as well as the function of administering the Construction Railway Rulebook and

managing the movement of Engineering Trains for itself and others within the working

area.

Delivery: UK
Lot #2Track - CentralAwarded

The scope of the Lot 2 works includes the installation of all track infrastructure within the

Central geographical area, including through open route, viaducts and cut-and-cover

tunnels.

The track infrastructure incorporates the design and construction of:

  • standard pre-cast slab track (a separate supply arrangement);
  • mainline Switches & Crossings (S&C) units and 18 Rail Expansion Devices (REDs) on a combination of the aforementioned track forms (a separate supply arrangement);
  • the above includes the construction of any Hydraulically Bonded Layer (HBL) or intermediate concrete layers, sleeper blocks or pre-cast elements, and the installation of long welded rails (to be supplied free-issue to the Contractor);
  • buffer stops - a combination of permanent and temporary units to support a phased entry into service;
  • track spacing infill to provide drainage continuity to drainage systems installed by others;
  • cable containment (troughing), to support the routing of HV and LV cables; and
  • provision of (and subsequent removal of) a railhead at Calvert to be used for construction purposes, which is then subsequently converted into an Infrastructure Maintenance Depot (IMD) for the ongoing maintenance of HS2 Ltd's rail-mounted plant fleet.

The scope of the Lot 2 works includes the development of the detailed design for all track

infrastructure within the Central geographical area, and full integration of this design with

the works of other Railway Systems packages. This Lot also includes the undertaking of

static integration testing of the track system, as well as providing on-site support and

facilitation of the dynamic testing phase coordinated by the client.

The Lot 2 works also include the undertaking of Principal Contractor duties under the

Construction (Design and Management) Regulations 2015 for the line of route up to and

including the permanent boundary, plus any railheads or temporary construction

compounds required to support the delivery of the works. This Principal Contractor role

requires the provision of support to the client to manage the integration and prioritisation

of construction activities, as well as the function of administering the Construction

Railway Rulebook and managing the movement of Engineering Trains for itself and others

within the working area.

Delivery: UK
Lot #3Track - NorthAwarded

The scope of the Lot 3 works includes the installation of all track infrastructure within the North geographical area, including through open route, viaducts and cut-and-cover tunnels.

The track infrastructure incorporates the design and construction of:

  • standard pre-cast slab track (a separate supply arrangement);
  • High-Speed ballasted track (design and construction), to link the High-Speed infrastructure with the conventional rail national network in the vicinity of Handsacre (north of Birmingham);
  • mainline Switches & Crossings (S&C) units and 18 Rail Expansion Devices (REDs) on a combination of the aforementioned track forms (a separate supply arrangement);
  • The above includes the construction of any Hydraulically Bonded Layer (HBL) or intermediate concrete layers, sleeper blocks or pre-cast elements, and the installation of long welded rails (to be supplied free-issue to the Contractor);
  • track spacing infill to provide drainage continuity to drainage systems installed by others;
  • 324km of cable containment (troughing), to support the routing of HV and LV cables; and
  • provision of (and subsequent removal of) a temporary railhead at Berkswell to be used for construction purposes.

The scope of the Lot 3 works includes the development of the detailed design for all track

infrastructure within the North geographical area, and full integration of this design with

the works of other Railway Systems packages. This Lot also includes the undertaking of

static integration testing of the track system, as well as providing on-site support and

facilitation of the dynamic testing phase coordinated by the client.

The Lot 3 works also includes the undertaking of Principal Contractor duties under the

Construction (Design and Management) Regulations 2015 for the line of route up to and

including the permanent boundary, plus any railheads or temporary construction

compounds required to support the delivery of the works. This Principal Contractor role

requires the provision of support to the client to manage the integration and prioritisation

of construction activities, as well as the function of administering the Construction

Railway Rulebook and managing the movement of Engineering Trains for itself and others

within the working area.

Delivery: UK
Lot #4Track Systems Framework AgreementAwarded

HS2 Ltd has established a multi-supplier framework agreement (FA) alongside the delivery contracts for lots 1, 2 and 3. The scope of work covered by the FA will be: — the works covered by lots 1, 2 and 3 (or the residual elements of those works) in the event of the termination or other failure of those contracts due to contractor default — other parts of the scope of lots 1, 2 and 3 works in the event they are omitted from those contracts for any reasons; — other optional works scope relating to the HS2 Track Systems or wider HS2 Project. HS2 Ltd appointed the following suppliers to the FA:

  • the successful tenderers for lots 1, 2 and 3 and, in the event they are different entities,
  • the second highest scoring tenderer for lots 1,
  • the second highest scoring tenderer for lot 2, and
  • the second highest scoring tenderer for lot 3. Any call-off contracts under the FA will be awarded following a mini-competition procedure, the rules for which are set out in the full FA. Only those parties appointed to the FA will be eligible to participate in such mini-competitions. There is no guaranteed minimum or maximum value of work to be awarded under the FA and HS2 Ltd reserves the right not to launch any mini-competition or award any call-off contracts under the FA, including for the avoidance of doubt, any call-off contract for all or part of the Delivery contract. HS2 Ltd reserves the right to provide in the FA for its use by any delivery body or other of its contractors or successor body appointed in relation to the HS2 Project to call off the Delivery contract. HS2 Ltd therefore reserves the right for the Delivery contract to be entered into by that delivery body or other contractor or successor body. The Delivery contract: HS2 Ltd reserves the right to award one or more call-off contracts for the Delivery works. The scope of works included within the Delivery includes the following: design and construction of —standard pre-cast slab track (a separate supply arrangement); —standard cast in-situ slab track or optional pre-cast slab track; —mainline switches and crossings (S&C) units and rail expansion devices (REDs) on a combination of the aforementioned track forms (a separate supply arrangement). The above includes the construction of any hydraulically bonded layer (HBL) or intermediate concrete layers, sleeper blocks or pre-cast elements and the installation of long welded rails (to be supplied free-issue to the Contractor); —buffer stops — either permanent or temporary units to support a phased entry into service; —track spacing infill to provide drainage continuity to systems installed by others; —cable containment (troughing), to support the routing of HV and LV cables; — provision of (and subsequent removal of) a railhead at stone to be used for construction purposes, which is then subsequently converted into an Infrastructure maintenance base; — rail served (IMB-R) for the ongoing maintenance of the clients rail-mounted plant fleet. The extent of the Delivery contract scope lot 4 works includes the design and installation of all track infrastructure within the geographical area, incl. through open route.
Delivery: UK

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored · same split on all 4 lots
Price: 30
Published sub-criteria (1)
  • Commercial: 30
Published award criteria (1)
  • Commercial: 30%
What this means for your bid
  • Price carries 30 of 30 points: a 10% discount moves about 3 points. This one is won on the number: sharpen the price before polishing the prose.
  • “Track Systems” is a framework: the contest is a place on its panel, not a single contract.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Negotiated procedure with prior call for competition
Legal basis
CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
Procurement category
Works
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
13 Feb 2025, 18:19 GMT
Last source update
13 Feb 2025, 18:19 GMT
FTS notice number
2025/S 000-005029
Classification (CPV)
Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
Delivery area
UK
Official registry OCID
ocds-h6vhtk-04deeb Find a Tender

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 3admitted to the panel · see the list ↓
Bids received 4
Contracts signed 4latest 15 Jan 2025

4 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.

Contracts

  • Contract 005029-2025-1

    Signed
    15 Jan 2025
    Value
    —
    Status
    active
  • Contract 005029-2025-2

    Signed
    15 Jan 2025
    Value
    —
    Status
    active
  • Contract 005029-2025-3

    Signed
    15 Jan 2025
    Value
    —
    Status
    active
  • Track Systems Framework Agreement

    Signed
    15 Jan 2025
    Value
    —
    Status
    active

Bid statistics published by the authority

LotBidsSMEVCSEValid bid range
1 · Track - Urban3bids———
2 · Track - Central3bids———
3 · Track - North3bids———
Whole notice4bids———

Contracting authority & participating public bodies

High Speed Two (HS2) Ltd

Contracting authorityPublic bodyRailway services High Speed Two (HS2) Ltd, Two Snowhill, Queensway, Birmingham, UK, B4 6GAContact email

Dispute resolution & review bodies

  • High CourtMediation bodyReview body London

Framework contractors & participating bidders

3 commercial parties on the notice

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.