Find a TenderAwarded
Published 5 Mar 2024, 12:49 GMT

Official UK procurement notice

TREE MAINTENANCE SERVICES FRAMEWORK Framework 2019-202523 (Extended to 30 March 2

Official notice

Authority: The Royal Parks Ltd (Public body)

Framework agreementServices
Framework ceiling (notional)Value not publishedframework ceiling, not attributable revenue
Awarded 30 Mar 2020

What is being bought

Published requirement description

No description was published on the notice. See the official documents.

CPV: Tree-cutting services · Tree-maintenance services

The lotProcurement structure

single lot · no lot value published
Lot #1The Royal Parks (TRP) invited tenders in 2020 to carry the efficient delivery of tree…

The Royal Parks (TRP) invited tenders in 2020 to carry the efficient delivery of tree work and tree management services to the highest possible standards.

The Royal Parks established the framework so that it may from time to time over a 4-year period call upon the appointed framework suppliers (contractors) to provide building works across the Royal Parks' estate.

Delivery: London · Across the Royal Parks and adjacent areas

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
What this means for your bid
  • “TREE MAINTENANCE SERVICES FRAMEWORK Framework 2019-202523 (Extended…” is a framework: the contest is a place on its panel, not a single contract.

Procedure terms & legal framework

From the official record
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Services
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
5 Mar 2024, 12:49 GMT
Last source update
5 Mar 2024, 12:49 GMT
Authority reference
2019/S132 323186-2019 (TED)
FTS notice number
2024/S 000-007009
Classification (CPV)
Tree-cutting servicesTree-maintenance services
Delivery area
London (UKI)
Official registry OCID
ocds-h6vhtk-044592 Find a Tender

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast

1 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.

Contracts

  • Contract 007009-2024-2019/S132-323186 FOL19/337-1

    Signed
    30 Mar 2020
    Value
    £5,000,000
    Status
    active
    • Change Nature and extent of the modifications (with indication of possible earlier changes to the contract): Nature and extent of the modifications (with indication of possible earlier changes to the contract): The Royal Parks Limited ("TRP") publishes this notice to record its intention to modify the framework for Arboculture Tree Maintenance works by extending its expiry date by a further twelve months only from the original Tender Notice in 'July 2019. The modification also includes for the increase in the value of the framework to £4.5M to enable the projects to be delivered during that period. The estimated maximum value of the modifications from the original value of £250,000 is up to £4.5M and not to exceed a maximum of £5M. The Royal Parks is formalising this Framework extension in March 2024, and this includes confirmation of the modifications. The Royal Parks intends to re-procure a similar works Framework during 2024, Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee. Description of the circumstances which rendered the modification necessary and explanation of the unforeseen nature of these circumstances: The need for modification is brought about by circumstances which a diligent contracting authority/entity could not have foreseen in 2019 as the impacts of the 2020-2021 Covid on the design and delivery of projects was not expected to be prolonged and so disruptive. Description of the circumstances which rendered the modifications necessary and explanation of the unforeseen nature of these circumstances: The modification is required due to the delaying impact of Covid-19 (considered a Force Majeure Event under relevant contracts) on the project programme being delivered across the parks. The Royal Parks believe these circumstances have created this need for modifications which a diligent contracting authority could not have foreseen both on the works to be delivered and on resourcing. These modifications are further required in order to align with operational requirements and to allow for a smoother transition and mobilisation period between this existing Framework and the next one to be established in 2024. Furthermore, the modification is not considered substantial under paragraph 8 of Regulation 72 of the Public Contract Regulations, or the Procurement Act 2023 for the following reasons: a) The framework is not rendered materially different in character through the extension of time and value; it will deliver the required works. The Framework started in March 2020 with the intention of providing the period and value to deliver the envisaged projects through to the 2024 and the programme now has more works projects to be delivered in the next 12 months. b) While the modification extends the contract to the 16th December 2024 the Royal Parks requires this twelve-month extension from 48 months to 60 months to permit the planned project works to be progressed and undertaken economically with the current contractors within the original procurement procedure. This extension will permit a new Framework to be tendered and awarded for the orderly follow-on work during the next 12 months and to be managed effectively. c) The modification does not change the economic balance of the Framework Agreement in favour of the contractors, as the contractors will continue to tender for and provide works for the rates and prices to be agreed. d) The modification does extend the term of the Framework Agreement however the nature of the Works scopes will remain similar. The timescale is to be extended by a further 12 months from the 16th December 2023 up to the 15th December 2024. e) No new contractors replace the existing contractors, however where required by the scopes contractors may need to include new subcontractors/suppliers, where agreed to address changes in the supply chains that are emerging.

Contracting authority & participating public bodies

THE ROYAL PARKS LIMITED

Contracting authorityPublic body The Old Police House,Hyde Park, LONDON, London, W22UHContact name, email, phone

Framework contractors & participating bidders

6 commercial parties on the notice

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.