Official UK procurement notice
Waste Management Services · UK public procurement notice
Authority: Aberdeen City Council (Local council)
What is being bought
Published requirement descriptionNo description was published on the notice. See the official documents.
CPV: Refuse and waste related services
The lotProcurement structure
single lot · no lot value publishedLot #1SUEZ Recycling and Recovery North East Limited is the Council’s existing contractor…
SUEZ Recycling and Recovery North East Limited is the Council’s existing contractor under its existing 25 year waste management contract which is due to expire on 21st September 2025. That existing contract covers the operation of the Household Waste RecyclingCentres (HWRCs), the Council owned Materials Recycling Facility (MRF) and Waste Transfer Station and management of the authority’s recyclable wastes. This procurement shall extend the existing waste management services to be performed SUEZ Recycling and Recovery North East Limited for a further three and a half years to 31 March 2029.
Procedure terms & legal framework
From the official record · publisher note attached- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Services
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 25 Apr 2023, 11:27 BST
- Last source update
- 25 Apr 2023, 11:27 BST
- Authority reference
000-YJMP3366- FTS notice number
2023/S 000-011778- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-03c3dbFind a Tender
Publisher note: Current company details (reflecting changes in name and registered office): SUEZ RECYCLING AND RECOVERY NORTH EAST LIMITED, a company incorporated in England and Wales under registration number 02331133, whose registered office is at Suez House, Grenfell Road, Maidenhead, Berkshire, SL6 1ES. (SC Ref:713175)
How it was run
Official notice- Submission deadline
- —
Timeline
17 Jul 2000 → 25 Apr 2023 · 2 dates- Contract starts17 Jul 2000, 00:00 BST
- Notice published25 Apr 2023, 11:27 BST
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| SUEZ Recycling and Recovery UK Ltd | £443,996,113 † | — | Awarded |
Contracts
Waste Management Services · SUEZ Recycling and Recovery UK Ltd
- Signed
- 17 Jul 2000
- Value
- £443,996,113
- Period
- 17 Jul 2000 – 31 Mar 2029
- Status
- active
- Change Extension of the existing contact services by a period of 42 months from 21st September 2025 to 31st March 2029. Circumstances which a diligent contracting authority could not have foreseen – Developing the documentation for the procurement of a long-term waste management contract to replace the existing contract to go to market in 2024 would be very challenging and will pose a significant risk of contractors either being reluctant to bid, or bids being inflated due to the need to price for risk associated with the uncertainty of impending significant legislative and policy initiatives (including the Deposit Return Scheme and Extended Producer Responsibility, recently published Incineration Review which suggests there could be a future need for pre-treatment of waste prior to incineration and the biodegradable waste landfill ban in 2025). It is anticipated the aforementioned will have a significant impact on Council's recycling waste composition/volume) collected & sent for processing together with as yet unknown effects on particular waste streams such as bulky waste, with concomitant effects on residual waste composition and volume. Following the implementation of any new requirements (e.g. collection service changes, changes to material composition, etc) it will generally take at least 12-24 months to be able to gain a good understanding of the impacts on the waste streams. It is estimated that the re-procurement of a contract to replace the existing waste management contract will take around 2-2.5 years to complete, from initial scoping through to contract award. The Initial contract included provision of an Energy from waste facility subject to obtaining necessary planning permission. This was not achieved, so the parties could agree the best suitable alternative solution. The Contract was modified in 2015, as per VEAT in 2015 which included for the design, build & operation of a MRF and the management of residual waste at an on-site RDF Facility for export or by bulk-hauling (with no on-site preparation) for UK processing. A Council waste depot and office facility were also built. The Contract was also varied in 2013 to include the construction of a new Household waste recycling centre at Hazlehead, Aberdeen., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: Procurement falls outside the scope of application of the Directive Explanation: The existing contract is being modified on the grounds of: 1. Reg 72(1)(c) PC(S)R 2015 (unforeseen circumstances); and/or 2. Reg 72(1)(e) PC(S)R 2015 (non-substantial variation) The nature and scope of the services are unchanged compared to what is envisaged in the existing contract.The modification does not change the economic balance of the contract in favour of the contractor. The modification does not extend the scope of the contract or framework agreement considerably.
Contracting authority & participating public bodies
Dispute resolution & review bodies
- Aberdeen Sherriff CourtReview body
Bidders & participating suppliers
2 commercial parties on the notice- SUEZ Recycling & Recovery UK LTDAwarded supplier
- SUEZ recycling and recovery UK LtdAwarded supplier
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.