Babcock Land Defence Limited: Contract Register & Procurement Profile

Companies House: Private Limited CompanyWest MidlandsTelford

Companies House09329025 ↗

Open now0no live notices
i

Tenders you can still bid for.

Notices at tender stage whose deadline has not passed, counted the way the search counts them: a notice shows under every code and region it names.

Notices, last 12 months0last notice 11 Dec 2023 · 47 in the catalogue
i

Notices published in the last 12 months.

Counted per tender, not per lot, against the 12 months before where shown.

Top-3 supplier share24%of 29 awarded procedures · 36 suppliers
i

How much of this buyer’s work goes to its three most frequent suppliers.

Share of its awarded tenders that name at least one of the top three. Each tender is counted once.

29 awarded tenders, 36 different suppliers.

Describes the record. It is not a sign of favouritism.

All awards we hold.

Contracts ending ≤18 months1none within 6 months · 1 estimated
i

Contracts that finish in the next 18 months.

Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.

An end date does not confirm a new procurement.

Who wins here
i

Which suppliers win the most here.

Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.

All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records

SupplierProceduresShareLast 24mAward recordsLast activity
Carwood Motor Unitsframework/DPS on 4413.8%04—
BCB Internationalframework/DPS on 3310.3%03—
Bozeat Industrial Ltd t/a B.I. Engineeringframework/DPS on 3310.3%03—
Llanelec Precision Engineering Co Ltdframework/DPS on 3310.3%03—
YAMAHA MOTOR EUROPE N.V., BRANCH UK26.9%02—
NP Aerospace Limitedframework/DPS on 226.9%02—
SUPACAT LIMITEDframework/DPS on 226.9%02—
Lifemarque Ltdframework/DPS on 226.9%02—

The three most frequent suppliers are named on 24% of 29 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 36 distinct suppliers hold at least one. Descriptive concentration of published awards, not a statement of preference.

Contracts ending
i

Contracts that finish in the next 18 months.

Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.

An end date does not confirm a new procurement.

17 of 53 contracts carry an end date, 17 estimated from the duration · not a retender forecast

ContractHolderEndsPublished value
The Supply of MK4 Tentage Insulation PanelsPower Plastics Ltd17 Jul 2027 estimated£4,500,000

Recent procedures

Latest 47 of 47 procedures where this authority buys, is the authority the work is for, or runs the procurement

ProcedureStatusPublishedPublished value
IRM20/7530 - The Supply of TyresFramework3 lotsTyres for heavy/light-duty vehiclesAwarded / complete18 May 2021—
IRM20/7530 - The Supply of TyresFramework3 lotsTyres for heavy/light-duty vehiclesAwarded / complete18 May 2021—
The Repair and Overhaul of CR2 Transmission Mechanical – Hand Traverse GearboxFrameworkRepair and maintenance services of military vehiclesAwarded / complete19 Mar 2021—
IRM19/7235 - THE SUPPLY OF LIGHT & HEAVY PROTECTED MOBILITY VEHICLE SPARESFrameworkParts of military vehiclesOpen19 Mar 2021£60,000,000
IRM21/7568 - THE SUPPLY OF LIGHT & HEAVY PROTECTED MOBILITY VEHICLE SPARESFrameworkParts of military vehiclesOpen19 Mar 2021£50,000,000
IRM20/7530 - The Supply of TyresFramework3 lotsTyres for heavy/light-duty vehiclesOpen19 Mar 2021£21,200,000
SUPPLY OF CR2 & AS90 OBTURATORS, BOLT VENT AXIAL (BVAS) AND THRUST HOUSINGSFrameworkWeaponsNot published2 Mar 2021—

Search all 47 procedures for this authority →

About this data
  • Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
  • One profile per authority. Different spellings and registration numbers of the same body are merged into this profile. It includes tenders the authority ran for other bodies and tenders run on its behalf; spend is credited to the body that pays.
  • Values are published values. Award values are what the authority published, excluding VAT and framework ceilings. They are not a budget or total spend.
  • Contract end dates. 17 of 53 published contracts have an end date; 17 of those are estimated as the signature (or publication) date plus the published duration and are marked “estimated”. They feed “Contracts ending”, the same rule as the retender radar.
  • Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.