East West Rail Company Limited: Contract Register & Procurement Profile
Central government·South East England·MILTON KEYNES
Find a Tender organisation id17466
i
Tenders you can still bid for.
Notices at tender stage whose deadline has not passed, counted the way the search counts them: a notice shows under every code and region it names.
i
Notices published in the last 12 months.
Counted per tender, not per lot, against the 12 months before where shown.
i
How much of this buyer’s work goes to its three most frequent suppliers.
Share of its awarded tenders that name at least one of the top three. Each tender is counted once.
12 awarded tenders, 25 different suppliers.
Describes the record. It is not a sign of favouritism.
i
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
i
How much this buyer has awarded recently, by published values.
Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.
Published values, not actual spend. The biggest rows are listed so you can check.
What they buyi
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
i
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each
71 Architectural, construction, engineering8 procedures · 32%45 Construction work5 procedures · 20%79 Business services: law, marketing, consulting5 procedures · 20%65 Public utilities3 procedures · 12%72 IT services: consulting, software, internet2 procedures · 8%90 Sewage, refuse, cleaning and environmental2 procedures · 8%34 Transport equipment and products1 procedure · 4%44 Construction structures and materials1 procedure · 4%How they buyi
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Last 24 months · 25 notices · commercial tool and route as published on the notice, not a legal-regime claim
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Contract80%(20 notices)
20 of 25 notices are Contract (80%).Framework16%(4 notices)
4 of 25 notices are Framework (16%).Dynamic purchasing system4%(1 notice)
1 of 25 notices is Dynamic purchasing system (4%).
i
Which procedures buyers here use.
Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.
Route not published40%(10 notices)
10 of 25 notices are Route not published (40%).Direct award28%(7 notices)
7 of 25 notices are Direct award (28%).Selective20%(5 notices)
5 of 25 notices are Selective (20%).Limited / restricted8%(2 notices)
2 of 25 notices are Limited / restricted (8%).Open4%(1 notice)
1 of 25 notices is Open (4%).
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 2 lots from this buyer’s competitions, last 24 months. Small sample.
i
How often this buyer changes a notice after publishing it.
Middle number of amendments per notice. Deadline extensions and corrections both count.
Based on 25 notices across all categories, last 24 months.
i
Do this buyer’s awards land above or below its own estimates.
Each lot’s published estimate against its award, on this buyer’s competitions, like for like.
Based on 2 lots with both an estimate and an award, last 24 months. Small sample.
A past pattern, not a price to bid.
Who wins herei
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
i
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records
| Supplier | Procedures | Share | Last 24m | Award records | Last activity |
|---|---|---|---|---|---|
| Bentley Systems UK Ltd. | 2 | 16.7% | 2 | 3 | 19 Jun 2026 |
| WSP UK Limited | 2 | 16.7% | 2 | 2 | 11 May 2026 |
| NPLAN LIMITED | 1 | 8.3% | 1 | 2 | 22 Jun 2026 |
| Thomson Ecology Ltd | 1 | 8.3% | 1 | 2 | — |
| Concept Engineering Consultants | 1 | 8.3% | 1 | 2 | — |
| Kotter Inc. | 1 | 8.3% | 1 | 2 | 6 May 2025 |
| AECOM LIMITED | 1 | 8.3% | 1 | 1 | — |
| Black & Veatch Binnies UK Limited | 1 | 8.3% | 1 | 1 | — |
The three most frequent suppliers are named on 42% of 12 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 25 distinct suppliers hold at least one. Descriptive concentration of published awards, not a statement of preference.
i
How much this buyer has awarded recently, by published values.
Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.
Published values, not actual spend. The biggest rows are listed so you can check.
i
The middle published award value for this buyer.
Middle value of the same awards as the total above.
Largest published awards iThe biggest published awards. Awards to a single supplier with a published value, largest first, so you can check the totals against the notice. A repeated framework total can appear here. Open the notice to check. | Supplier | Awarded | Term | Published value |
|---|---|---|---|---|
| Land and Property Services - Lot 2 (Land Access) | WSP UK Limited | 11 May 2026 | 4 yrs · up to 6.2 yrs | £34,510,876 ≈ £8.6m/yr |
| Land and Property Services - Lot 1 (Valuations and Compensation) | Arcadis | 11 May 2026 | 4 yrs · up to 6.2 yrs | £25,211,833 ≈ £6.3m/yr |
| Provision of Artificial Intelligence Schedule Risk Analysis Tool | NPLAN LIMITED | — | 1 yrs · up to 11 yrs | £3,014,851 † ≈ £3.0m/yr |
| Digital Project Lifecycle Mangement Tool | METHOD APPS LIMITED | 9 Jun 2025 | 1 yrs · up to 10 yrs | £1,388,100 ≈ £1.4m/yr |
| Leadership Effectiveness Services | Kotter Inc. | — | 6 mo | £1,200,000 † |
Contracts endingi
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
i
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
11 of 13 contracts carry an end date, 3 estimated from the duration · not a retender forecast
| Contract | Holder | Ends | Published value |
|---|---|---|---|
| Low Carbon Consultancy & Advanced Market Conditions | OVE ARUP & PARTNERS LIMITED | 31 Mar 2027 | £55,039 |
| Provision of Bentley ProjectWise and ALIM Licences | Bentley Systems UK Ltd. | 30 Jun 2027 | £694,283 |
| Provision of Artificial Intelligence Schedule Risk Analysis Tool | NPLAN LIMITED | 5 Jul 2027 | £3,014,851 |
Recent procedures
Latest 26 of 26 procedures where this authority buys, is the authority the work is for, or runs the procurement
| Procedure | Status | Published | Published value |
|---|---|---|---|
| Low Carbon Consultancy & Advanced Market Conditions | Awarded / complete | 21 Oct 2026 | — |
| Client Support Framework (CSF)Construction project management services | Planned | 16 Oct 2026 | £350,000,000 |
| NEC4 Copyright Licence & Two Year Subscription | Awarded / complete | 12 Oct 2026 | — |
| Provision of Managed Security Operations Centre (SOC)IT services: consulting | Awarded / complete | 23 Sept 2026 | — |
| Land and Property ServicesSurvey services | Awarded / complete | 8 Sept 2026 | £57,333,793 |
| Ground InvestigationsConstruction work | Awarded / complete | 16 Jul 2026 | — |
| Provision of Artificial Intelligence Schedule Risk Analysis Tool | Awarded / complete | 12 Jul 2026 | — |
| Provision of Bentley ProjectWise and ALIM Licences | Awarded / complete | 12 Jul 2026 | — |
| Environmental survey services frameworkAir pollution monitoring or measurement services | Awarded / complete | 9 Jul 2026 | — |
| Provision of Data Services (Digital Spine) | Awarded / complete | 19 Jun 2026 | — |
| Media ManagementMarketing management consultancy services | Planned | 26 May 2026 | £3,333,333 |
| Provision of Azure and MS365 LicencesSoftware package and information systems | Planned | 26 May 2026 | £2,500,000 |
| Stakeholder Engagement SupportStakeholders representation services | Planned | 26 May 2026 | £3,333,333 |
| CT4692 Programme Support Works Framework Preliminary Market EngagementArchaeological services | Planned | 26 May 2026 | £500,000,000 |
| Leadership Effectiveness Services | Awarded / complete | 11 May 2026 | — |
| MethodGrid | Awarded / complete | 9 Feb 2026 | — |
| CT4692 Programme Support Works Framework Preliminary Market EngagementArchitectural | Planned | 24 Oct 2025 | £700,000,000 |
| Travel Booking System | Awarded / complete | 12 Jun 2025 | — |
| Systems IntegratorRailway engineering services | Planned | 22 May 2025 | £116,666,666 |
| Construction IntegratorRailway engineering services | Planned | 22 May 2025 | £116,666,666 |
About this data
- Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
- One profile per authority. Different spellings and registration numbers of the same body are merged into this profile. It includes tenders the authority ran for other bodies and tenders run on its behalf; spend is credited to the body that pays.
- Values are published values. Award values are what the authority published, excluding VAT and framework ceilings. They are not a budget or total spend.
- Contract end dates. 11 of 13 published contracts have an end date; 3 of those are estimated as the signature (or publication) date plus the published duration and are marked “estimated”. They feed “Contracts ending”, the same rule as the retender radar.
- Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.