The Hillingdon Hospitals NHS Foundation Trust: Contract Register & Procurement Profile
NHS ODS: NHS TRUST·Central government·Greater London·Uxbridge
Official UK PPONPNPL-3913-VPHMWebsitethh.nhs.uk ↗
i
Tenders you can still bid for.
Notices at tender stage whose deadline has not passed, counted the way the search counts them: a notice shows under every code and region it names.
i
Notices published in the last 12 months.
Counted per tender, not per lot, against the 12 months before where shown.
i
How much of this buyer’s work goes to its three most frequent suppliers.
Share of its awarded tenders that name at least one of the top three. Each tender is counted once.
31 awarded tenders, 29 different suppliers.
Describes the record. It is not a sign of favouritism.
i
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
i
How much this buyer has awarded recently, by published values.
Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.
Published values, not actual spend. The biggest rows are listed so you can check.
What they buyi
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
i
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each
45 Construction work13 procedures · 30%50 Repair and maintenance services4 procedures · 9%85 Health and social work services4 procedures · 9%44 Construction structures and materials2 procedures · 5%71 Architectural, construction, engineering2 procedures · 5%33 Medical equipments, pharmaceuticals1 procedure · 2%How they buyi
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Last 24 months · 43 notices · commercial tool and route as published on the notice, not a legal-regime claim
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Contract84%(36 notices)
36 of 43 notices are Contract (84%).Framework16%(7 notices)
7 of 43 notices are Framework (16%).
i
Which procedures buyers here use.
Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.
Direct award42%(18 notices)
18 of 43 notices are Direct award (42%).Limited / restricted26%(11 notices)
11 of 43 notices are Limited / restricted (26%).Selective16%(7 notices)
7 of 43 notices are Selective (16%).Open12%(5 notices)
5 of 43 notices are Open (12%).Route not published5%(2 notices)
2 of 43 notices are Route not published (5%).
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 2 lots from this buyer’s competitions, last 24 months. Small sample.
i
How often this buyer changes a notice after publishing it.
Middle number of amendments per notice. Deadline extensions and corrections both count.
Based on 43 notices across all categories, last 24 months.
i
Do this buyer’s awards land above or below its own estimates.
Each lot’s published estimate against its award, on this buyer’s competitions, like for like.
Based on 1 lots with both an estimate and an award, last 24 months. Small sample.
A past pattern, not a price to bid.
Who wins herei
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
i
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records
| Supplier | Procedures | Share | Last 24m | Award records | Last activity |
|---|---|---|---|---|---|
| OCS HEATING AND GAS LIMITED | 2 | 6.5% | 2 | 2 | 6 Oct 2026 |
| AIRISQ LIMITED | 2 | 6.5% | 2 | 2 | — |
| Bisden Boiler Company (1985) Ltd t/a Atlas Boiler Company | 1 | 3.2% | 1 | 2 | 1 Apr 2026 |
| ATLAS BOILER COMPANY | 1 | 3.2% | 1 | 2 | 18 Nov 2025 |
| SCHNEIDER ELECTRIC LIMITED | 1 | 3.2% | 1 | 1 | — |
| Bosch Thermotechnology Limited (T/A Worcester Bosch) | 1 | 3.2% | 1 | 1 | — |
| 18 Week Support Limited | 1 | 3.2% | 1 | 1 | — |
| ABEC Ltd | 1 | 3.2% | 1 | 1 | — |
The three most frequent suppliers are named on 16% of 31 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 29 distinct suppliers hold at least one. Descriptive concentration of published awards, not a statement of preference.
i
How much this buyer has awarded recently, by published values.
Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.
Published values, not actual spend. The biggest rows are listed so you can check.
i
The middle published award value for this buyer.
Middle value of the same awards as the total above.
Largest published awards iThe biggest published awards. Awards to a single supplier with a published value, largest first, so you can check the totals against the notice. A repeated framework total can appear here. Open the notice to check. | Supplier | Awarded | Term | Published value |
|---|---|---|---|---|
| THH - Supply of Patient-Specific Cytotoxic and Advjuvant Products | Baxter Healthcare Ltd | 28 May 2026 | 3 yrs · up to 5 yrs | £9,288,099 ≈ £3.1m/yr |
| Non Emergency Patient Transport -The Hillingdon Hospital | HATS Group Ltd | — | — | £5,895,000 † |
| THH - MVH Ventilation Project | BURREN AND WHITAKER CONSTRUCTION LTD | — | 3 mo | £2,342,500 † |
| Contractor Appointment for the Emergency Department Improvements at Hillingdon Hospitals NHS Foundation Trust | Cuffe PLC | — | 10 mo | £1,770,736 † |
| THH Roof works | Carmelcrest Ltd | 4 Nov 2025 | 4 mo | £1,344,000 |
Contracts endingi
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
i
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
18 of 26 contracts carry an end date · not a retender forecast
| Contract | Holder | Ends | Published value |
|---|---|---|---|
| – Interim Reactive Mechanical & Plumbing Services | OCS HEATING AND GAS LIMITED | 31 Oct 2026 | £75,000 |
| THH - Boiler Remedial Works | ATLAS BOILER COMPANY | 13 Nov 2026 | £39,750 |
| THH - Plantroom Upgrade | Spirax-Sarco Limited | 27 Nov 2026 | £42,665 |
| Security Officer Provision | Pace Security Services Ltd | 31 Dec 2026 | £25,000 |
| -BMS Interim Extension Services | ABEC Ltd | 31 Jan 2027 | £28,800 |
| Provision of Contractor Appointment for the Emergency Department Improvements at Hillingdon Hospitals NHS Foundation Trust | Cuffe PLC | 29 Mar 2027 | £1,770,736 |
| Lift Reactive works | EZE Lifts Limited | 13 Jun 2027 | £142,500 |
| Fire Alarm & Fire Damper Maintenance and Compliance Works | Terry Eames Fire & Security Limited | 29 Feb 2028 | £83,137 |
Recent procedures
Latest 50 of 52 procedures where this authority buys, is the authority the work is for, or runs the procurement
| Procedure | Status | Published | Published value |
|---|---|---|---|
| ED ReconfigurationBuilding construction work | Open | 24 Oct 2024 | £750,000 |
| ED reconfigurationConstruction work | Open | 24 Oct 2024 | £750,000 |
| ED REconfigurationBuilding construction work | Open | 24 Oct 2024 | £750,000 |
| Provision of Waste Disposal Provider and Incinerator OperatorCollection | Open | 21 Oct 2024 | £40,000,000 |
| Decant EBMEConstruction work for buildings relating to health | Open | 2 Oct 2024 | £800,000 |
| Static & Mobile X-Ray unitsMedical equipments | Open | 1 Dec 2023 | £390,000 |
| Industrial Yard worksBuilding completion work | Open | 3 Nov 2023 | £100,000 |
| CA23010 - MVH Electrical Infrastructure UpgradeHospital facilities construction work | Open | 1 Nov 2023 | £4,000,000 |
| Endoscopy theatre upgradeConstruction structures and materials; auxiliary products to construction (except electric apparatus) | Open | 30 Oct 2023 | £1,300,000 |
| Construction works supporting Endoscopy theatre Upgrade at The Hillingdon HospitalsBuilding construction work | Open | 30 Oct 2023 | £1,300,000 |
About this data
- Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
- One profile per authority. Different spellings and registration numbers of the same body are merged into this profile. It includes tenders the authority ran for other bodies and tenders run on its behalf; spend is credited to the body that pays.
- Values are published values. Award values are what the authority published, excluding VAT and framework ceilings. They are not a budget or total spend.
- Contract end dates. 18 of 26 published contracts have an end date; 0 of those are estimated as the signature (or publication) date plus the published duration and are marked “estimated”. They feed “Contracts ending”, the same rule as the retender radar.
- Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.