University Hospitals of Morecambe Bay NHS Foundation Trust: Contract Register & Procurement Profile
NHS ODS: NHS TRUST·Central government·North West England·Kendal·Ran 1 procurement for other authorities
Official UK PPONPGWW-7958-CHJDWebsiteuhmb.nhs.uk ↗
i
Tenders you can still bid for.
Notices at tender stage whose deadline has not passed, counted the way the search counts them: a notice shows under every code and region it names.
i
Notices published in the last 12 months.
Counted per tender, not per lot, against the 12 months before where shown.
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 4 lots from this buyer’s competitions, last 24 months. Small sample.
i
How much of this buyer’s work goes to its three most frequent suppliers.
Share of its awarded tenders that name at least one of the top three. Each tender is counted once.
31 awarded tenders, 22 different suppliers.
Describes the record. It is not a sign of favouritism.
i
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
i
How much this buyer has awarded recently, by published values.
Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.
Published values, not actual spend. The biggest rows are listed so you can check.
What they buyi
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
i
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each
45 Construction work6 procedures · 21%64 Postal and telecommunications services5 procedures · 18%71 Architectural, construction, engineering5 procedures · 18%85 Health and social work services4 procedures · 14%72 IT services: consulting, software, internet3 procedures · 11%42 Industrial machinery2 procedures · 7%15 Food, drink, tobacco1 procedure · 4%24 Chemical products1 procedure · 4%How they buyi
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Last 24 months · 28 notices · commercial tool and route as published on the notice, not a legal-regime claim
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Contract86%(24 notices)
24 of 28 notices are Contract (86%).Framework14%(4 notices)
4 of 28 notices are Framework (14%).
i
Which procedures buyers here use.
Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.
Limited / restricted82%(23 notices)
23 of 28 notices are Limited / restricted (82%).Open14%(4 notices)
4 of 28 notices are Open (14%).Route not published4%(1 notice)
1 of 28 notices is Route not published (4%).
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 4 lots from this buyer’s competitions, last 24 months. Small sample.
i
How often this buyer changes a notice after publishing it.
Middle number of amendments per notice. Deadline extensions and corrections both count.
Based on 28 notices across all categories, last 24 months.
i
Do this buyer’s awards land above or below its own estimates.
Each lot’s published estimate against its award, on this buyer’s competitions, like for like.
Based on 2 lots with both an estimate and an award, last 24 months. Small sample.
A past pattern, not a price to bid.
Who wins herei
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
i
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records
| Supplier | Procedures | Share | Last 24m | Award records | Last activity |
|---|---|---|---|---|---|
| WHISTL UK LIMITED | 5 | 16.1% | 5 | 5 | — |
| THE JAMES MERCER GROUP LIMITED | 4 | 12.9% | 4 | 4 | — |
| DAY Project Management Limited | 2 | 6.5% | 2 | 2 | — |
| Day Architectural Limited | 2 | 6.5% | 2 | 2 | — |
| Multi Health Specialists Limited | 1 | 3.2% | 1 | 1 | — |
| Lancashire Hospital Services Limited | 1 | 3.2% | 1 | 1 | — |
| Hydraclean Limited | 1 | 3.2% | 1 | 1 | 5 Jun 2026 |
| Energy Efficient Solutions Group Ltd | 1 | 3.2% | 1 | 1 | — |
The three most frequent suppliers are named on 35% of 31 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 22 distinct suppliers hold at least one. Descriptive concentration of published awards, not a statement of preference.
i
How much this buyer has awarded recently, by published values.
Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.
Published values, not actual spend. The biggest rows are listed so you can check.
i
The middle published award value for this buyer.
Middle value of the same awards as the total above.
Largest published awards iThe biggest published awards. Awards to a single supplier with a published value, largest first, so you can check the totals against the notice. A repeated framework total can appear here. Open the notice to check. | Supplier | Awarded | Term | Published value |
|---|---|---|---|---|
| Outpatient Pharmacy Services | Lancashire Hospital Services Limited | — | — | £12,000,000 † |
| Security Guards and Care Led Security Supervision | Lingwood Security Management Ltd | — | — | £2,276,046 † |
| Furness General Hospital High Level Roof Replacement- RS5 | Gables UK Limited | — | — | £1,496,995 † |
| The installation of Solar Panels | Energy Efficient Solutions Group Ltd | — | — | £1,426,667 † |
| Architectural Services for UHMB Diagnostic Schemes | Day Architectural Limited | — | — | £678,086 † |
Contracts endingi
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
i
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
8 of 32 contracts carry an end date, 6 estimated from the duration · not a retender forecast
| Contract | Holder | Ends | Published value |
|---|---|---|---|
| Grounds and Gardens Maintenance | Alben Landscapes Ltd | 6 Jan 2027 estimated | £111,409 |
| Verification of Critical Ventilation Systems | APPROVED AIR LIMITED | 28 Apr 2027 estimated | £578,000 |
| Building Management Systems and Plant Control Installations | E.ON Control Solutions Limited | 29 Oct 2027 estimated | £424,672 |
Recent procedures
Latest 40 of 39 procedures where this authority buys, is the authority the work is for, or runs the procurement
| Procedure | Status | Published | Published value |
|---|---|---|---|
| Furness General Hospital High Level Roof Replacement- RS5Roof | Awarded / complete | 30 Dec 2025 | — |
| The installation of Solar PanelsSolar panel roof-covering work | Awarded / complete | 5 Nov 2025 | — |
| Electronic Patient Record System Contract TermMedical software package | Awarded / complete | 28 May 2025 | — |
| The provision of a DSA postage model for University Hospitals Morecambe Bay NHSPost and courier services | Awarded / complete | 2 May 2025 | — |
| The provision of a DSA postage model for University Hospitals Morecambe Bay NHSPost and courier services | Awarded / complete | 2 May 2025 | — |
| The provision of a DSA postage model for University Hospitals Morecambe Bay NHSPost and courier services | Awarded / complete | 2 May 2025 | — |
| The provision of a DSA postage model for University Hospitals Morecambe Bay NHSPost and courier services | Awarded / complete | 2 May 2025 | — |
| Outpatient Pharmacy ServicesPharmacy services | Awarded / complete | 4 Feb 2025 | — |
| The provision of outpatient pharmacy services for University Hospitals Morecambe Bay NHS, Blackpool Teaching Hospital NHS, East Lancashire Hospitals NHS and Lancashire Teaching Hospitals NHS Trusts.Pharmacy services | Planned | 19 Dec 2024 | — |
| Provision of Taxi ServicesMedical furniture | Planned | 14 Oct 2024 | £600,000 |
| Grounds and Gardens MaintenanceLandscape gardening services | Awarded / complete | 15 Jul 2024 | — |
| Verification of Critical Ventilation SystemsVentilation consultancy services | Awarded / complete | 15 May 2024 | — |
| Provision of Bariatric EquipmentMedical furniture | Open | 23 Apr 2024 | £630,000 |
| Maintenance of GeneratorsRepair and maintenance services of generators | Awarded / complete | 7 Mar 2024 | — |
| Fire Alarm SystemsFire-alarm systems | Awarded / complete | 20 Nov 2023 | — |
| Building Management Systems and Plant Control InstallationsRepair and maintenance services of electrical and mechanical building installations | Awarded / complete | 6 Dec 2022 | — |
| Domestic Waste Management & Recycling ServicesNon-hazardous refuse and waste treatment and disposal services | Open | 19 Oct 2022 | £1,250,000 |
| Inspection, maintenance and reactive repairs for Emergency/Standby Generator SetsRepair and maintenance services of generators | Awarded / complete | 6 Oct 2022 | — |
| Patient Transport ServicesAmbulance services | Awarded / complete | 3 Sept 2021 | — |
| Patient Transport ServicesAmbulance services | Open | 14 May 2021 | — |
About this data
- Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
- One profile per authority. Different spellings and registration numbers of the same body are merged into this profile. It includes tenders the authority ran for other bodies and tenders run on its behalf; spend is credited to the body that pays.
- Values are published values. Award values are what the authority published, excluding VAT and framework ceilings. They are not a budget or total spend.
- Contract end dates. 8 of 32 published contracts have an end date; 6 of those are estimated as the signature (or publication) date plus the published duration and are marked “estimated”. They feed “Contracts ending”, the same rule as the retender radar.
- Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.