Expiring UK Public Contracts: Retender Radar
Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.
Contracts ending in the next 24 months
Showing 1,996–2,010
- Ends · in 311 days
Major Roads-Carriageway Resurfacing Works Contract 2026-2027
Reading Borough Council · Local authority · South East England
Incumbent: O'HARA BROS. SURFACING LIMITED
Major Roads - Carriageway Resurfacing Worksincluding: i) Traffic Management ii) Removal and Disposal iii) Existing Utility and Drainage Covers iv) Surfacing v) Road Markings vi) Existing Drainage
- Published value
- £1.8m
- Annual run-rate
- £1.8mpublished value ÷ term, exc. VAT
- Term
- 7 Sept 2026 → 6 Sept 2027 · 1 yr
- Reference
ocds-h6vhtk-06a733
- Ends · in 311 days
Solway Community School - Partial Roof Replacement
Cumberland Council · Local authority · North West England
Incumbent: Roland Hill (Parsonby) Limited
Capital Works Framework Cumberland - Lot 1 - To undertake the over roofing of Roofs 3, 9 , 5 and 6 as shown on the attached roof layout plan. To be carried out in 3 phases as note below: • Phase 1 - Roofs 3 and 9 20th July to the 31st Augus…
- Published value
- £720k
- Annual run-rate
- £632kpublished value ÷ term, exc. VAT
- Term
- 18 Jul 2026 → 6 Sept 2027 · 1.2 yrs
- Reference
ocds-h6vhtk-06df18
- Ends · in 311 daysExtension option · up to 31 Mar 2028
CBC-2090-Q-SM New replacement roof on main farmhouse detached
Central Bedfordshire Council · Local authority
Incumbent: GB Construction (Herts) Limited
Central Bedfordshire Council has awarded a contract for the replacement of the roof to a detached main farmhouse. The works include the removal of the existing roof covering and associated materials, installation of the replacement roofing …
- Published value
- £32k
- Annual run-rate
- £32kpublished value ÷ term, exc. VAT
- Term
- 11 Sept 2026 → 6 Sept 2027 · 1 yr · up to 31 Mar 2028 with extensions
- Reference
ocds-h6vhtk-06f7be
- Ends · in 312 daysExtension option · up to 6 Sept 2028
HAR6188 Remaining structural strengthening works and External Wall System installation
Tower Hamlets · Local authority · Nationwide (UK)
Incumbent: Wates Property Services Ltd
This contract is to complete the remaining structural strengthening works and External Wall System Installation to two existing occupied High-Risk Blocks within Tower Hamlets. External Wall Installation works originally started on site in F…
- Published value
- £113m
- Annual run-rate
- £84mpublished value ÷ term, exc. VAT
- Term
- 7 May 2026 → 7 Sept 2027 · 1.3 yrs · up to 6 Sept 2028 with extensions
- Reference
ocds-h6vhtk-0687da
- Ends · in 312 daysPanel · 2 suppliers
CTrap for North West: Equipment for Visualization of Single Molecular Biomolecular Dynamics for Biosciences
UNIVERSITY OF LANCASTER · Education · North West England
Panel: Lumicks B.V, Lunicks B.V
This procurement is being undertaken via a single-source route due to the unique technical capabilities of the C-Trap® Dymo 300 and the exclusive rights held by its manufacturer, LUMICKS B.V.
- Published value
- £1.0minc. VAT as published
- Annual run-rate
- —panel, not one supplier
- Term
- 8 Sept 2025 → 7 Sept 2027 · 2 yrs
- Reference
ocds-h6vhtk-058c4a
- Estimated end · in 313 days
Bathroom - East
Accent Group Ltd · Yorkshire and the Humber, East Midlands, East of England, South East England
Incumbent: CLC Contractors Ltd · Last contest: 8 bids (8 SME)
Accent Housing Ltd is seeking a contractor or contractors to deliver Bathroom Replacement Planned Works in the East, South and Yorkshire Regions of its portfolio.The opportunity will be procured as three seperate Lots with no limit being pl…
- Published value
- £1.5m
- Annual run-rate
- —start date not published
- Term
- Estimated end 8 Sept 2027 · start not published
- Reference
ocds-h6vhtk-046f2a
- Estimated end · in 313 days
Bathrooms - South
Accent Group Ltd · Yorkshire and the Humber, East Midlands, East of England, South East England
Incumbent: IAN WILLIAMS · Last contest: 5 bids (3 SME)
Accent Housing Ltd is seeking a contractor or contractors to deliver Bathroom Replacement Planned Works in the East, South and Yorkshire Regions of its portfolio.The opportunity will be procured as three seperate Lots with no limit being pl…
- Published value
- £1.5m
- Annual run-rate
- —start date not published
- Term
- Estimated end 8 Sept 2027 · start not published
- Reference
ocds-h6vhtk-046f2a
- Estimated end · in 313 days
Bathrooms - Yorkshire
Accent Group Ltd · Yorkshire and the Humber, East Midlands, East of England, South East England
Incumbent: IAN WILLIAMS · Last contest: 5 bids (3 SME)
Accent Housing Ltd is seeking a contractor or contractors to deliver Bathroom Replacement Planned Works in the East, South and Yorkshire Regions of its portfolio.The opportunity will be procured as three seperate Lots with no limit being pl…
- Published value
- £1.5m
- Annual run-rate
- —start date not published
- Term
- Estimated end 8 Sept 2027 · start not published
- Reference
ocds-h6vhtk-046f2a
- Estimated end · in 313 days
Communal Electrical Supply
London Borough of Hackney · Local authority · Greater London
Incumbent: RGE Services Ltd · Last contest: 5 bids (5 SME)
To renew, upgrade or extend lateral mains to 250 blocks already identified out of a stock of 2,899 blocks. To test and inspect landlord's supplies as directed.
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Estimated end 8 Sept 2027 · start not published
- Reference
ocds-h6vhtk-02fa75
- Ends · in 313 days
Carpet and Floor Coverings Supply and Fit
mhs homes group · Other public body · South East England
Incumbent: HOME DIRECT CARPETS LIMITED
Provisions of Carpet and Floor Coverings Supply and Fit
- Published value
- £50k
- Annual run-rate
- £51kpublished value ÷ term, exc. VAT
- Term
- 14 Sept 2026 → 8 Sept 2027 · 1 yr
- Reference
ocds-h6vhtk-07761c
- Estimated end · in 315 daysFramework record
LUF Bulwell Town Centre Scheme
Nottingham City Council · Local authority · East Midlands
Incumbent: WILLMOTT DIXON LIMITED
Nottingham City Council has awarded a call-off contract for the delivery of LUF Bulwell Town Centre Scheme under the SCAPE National Construction Framework. The contract includes pre-construction services, CDP development, construction works…
- Published value
- £16mlargest agreement; total ceiling not published
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 10 Sept 2027 · start not published
- Reference
ocds-h6vhtk-0781ca
- Estimated end · in 315 days
Tiree Terminal New Building, Marshalling Area & Traffic Management Works
Caledonian Maritime Assets Ltd (Utility) · Scotland
Incumbent: Mackenzie Construction Ltd · Last contest: 5 bids (2 SME)
The existing terminal building at Tiree as reached the end of its' serviceable life' and is to be replaced with a new, modern building along with additional works to increase the capacity of the marshalling area and improve the footways and…
- Published value
- £3.9m
- Annual run-rate
- —start date not published
- Term
- Estimated end 10 Sept 2027 · start not published
- Reference
ocds-h6vhtk-05ff91
- Estimated end · in 317 daysFramework recordPanel · 10 suppliers
Intermediate Construction Framework 3 (ICF 3)
Hampshire County Council · Local authority · South East England, South West England, Wales (Cymru)
Panel: Ascia Construction Limited, Doswell Projects Limited, ETEC CONTRACT SERVICES LTD +7 more
The new ICF Framework will have two lots: Lot 1 - The type of project or programmes is expected to consist mostly of extensions, refurbishments, and alterations to existing schools; however, any type of building work to any property includi…
- Published value
- £200mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 12 Sept 2027 · start not published
- Reference
ocds-h6vhtk-037f91
- Estimated end · in 318 days
Almond Housing Association Design, Supply and Installation of External Wall Insulation and Associated Works
Almond Housing Association · Housing · Scotland
Incumbent: Everwarm Ltd · Last contest: 6 bids (0 SME)
The Works comprise of the replacement of existing external wall insulation, painting to base courses, provide new uPVC soffits, fascia, gutters and downpipes, top up loft insulation and all associated works to various properties located thr…
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Estimated end 13 Sept 2027 · start not published
- Reference
ocds-h6vhtk-03e327
- Ends · in 318 days
Clent Way Roof Replacement 2026
Greensquareaccord · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: J.HARPER & SONS(LEOMINSTER)LIMITED · Last contest: awarded 51% under the estimate
Roofing works including asbestos removal and full roof replacement to three blocks where damage has been identified at Clent Way, Birmingham.
- Published value
- £306k
- Annual run-rate
- £306kpublished value ÷ term, exc. VAT
- Term
- 14 Sept 2026 → 13 Sept 2027 · 1 yr
- Reference
ocds-h6vhtk-069d8e
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,867 contracts and agreements end within 24 months, 4,773 in total · £8.6bn published GBP values end in the next 24 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 24 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services5,35479Business services: law, marketing, consulting3,98460Transport services (except waste transport)3,72845Construction work2,86772IT services: consulting, software, internet2,38171Architectural, construction, engineering2,31850Repair and maintenance services2,23780Education and training services1,951
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.