Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the all future end dates
Showing 526–540
- Estimated end · in 662 daysFramework record
Supply, Delivery and Installation of Office Furniture
CORSERV LIMITED · South West England
Incumbent: Bates Office Services
Corserv Solutions Ltd is seeking to procure a Sole Supplier for the Supply, Delivery and Installation of Office furniture
- Published value
- £136klargest agreement; total ceiling not published
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 20 Aug 2028 · start not published
- Reference
ocds-h6vhtk-047ac6
- Estimated end · in 665 days
Lot 1 - Supply only of Kitchens
Gentoo Group Limited · North East England
Incumbent: Joinery & Timber Creations (65) Limited · Last contest: 4 bids (1 SME)
Gentoo Group Ltd (Gentoo) seeks to appoint up to two Contractors (one per lot) to provide supply and distribution of Kitchens and Supply and Installation of Kitchens service. • Lot 1 – Supply only of Kitchens • Lot 2 – Supply and Fit of Kit…
- Published value
- £13m
- Annual run-rate
- —start date not published
- Term
- Estimated end 23 Aug 2028 · start not published
- Reference
ocds-h6vhtk-02b1da
- Estimated end · in 665 days
Lot 2 - Supply and Fit of Kitchens
Gentoo Group Limited · North East England
Incumbent: The Symphony Group Plc · Last contest: 5 bids (2 SME)
Gentoo Group Ltd (Gentoo) seeks to appoint up to two Contractors (one per lot) to provide supply and distribution of Kitchens and Supply and Installation of Kitchens service. • Lot 1 – Supply only of Kitchens • Lot 2 – Supply and Fit of Kit…
- Published value
- £5.2m
- Annual run-rate
- —start date not published
- Term
- Estimated end 23 Aug 2028 · start not published
- Reference
ocds-h6vhtk-02b1da
- Ends · in 673 daysExtension option · up to 31 Aug 2032
CCS082 Contract for the Supply, Delivery and Installation of Heavy Catering Products
Derbyshire County Council · Local authority · East Midlands
Incumbent: DENBY CATERING EQUIPMENT LIMITED
Supply, delivery and, where specified, installation, commissioning and disposal of heavy catering products as detailed in Appendix B Price Schedule. Delivery locations will be predominantly in Derbyshire, with some locations in neighbouring…
- Published value
- £72minc. VAT as published
- Annual run-rate
- £39mpublished value ÷ term, inc. VAT
- Term
- 20 Oct 2026 → 31 Aug 2028 · 1.8 yrs · up to 31 Aug 2032 with extensions
- Reference
ocds-h6vhtk-078ba7
- Ends · in 673 daysExtension option · up to 31 Aug 2030
CLEANING MATERIALS & JANITORIAL SUPPLIES
FUSION SCHOOL SERVICES LIMITED · Education · South West England
Incumbent: AUK Supplies Ltd
Goods required The Supplier shall provide cleaning materials and janitorial supplies including but not limited to: • Floorcare chemicals • Washroom chemicals • Kitchen and catering chemicals • Laundry chemicals • General cleaning chemicals …
- Published value
- £450k
- Annual run-rate
- £238kpublished value ÷ term, exc. VAT
- Term
- 12 Oct 2026 → 31 Aug 2028 · 1.9 yrs · up to 31 Aug 2030 with extensions
- Reference
ocds-h6vhtk-06e26f
- Ends · in 674 daysExtension option · up to 1 Sept 2030
CPU 6173 Cleaning Consumables
Nottingham City Council · Local authority · East Midlands
Incumbent: Banner Group Limited · Last contest: awarded 17% under the estimate
Provision of cleaning consumables products to Nottingham City Council and designated service locations across Nottingham City via a Framework Agreement. The contract covers the supply and delivery of a comprehensive range of cleaning to mul…
- Published value
- £500k
- Annual run-rate
- £252kpublished value ÷ term, exc. VAT
- Term
- 7 Sept 2026 → 1 Sept 2028 · 2 yrs · up to 1 Sept 2030 with extensions
- Reference
ocds-h6vhtk-065ffd
- Estimated end · in 675 daysFramework recordPanel · 16 suppliers
Cleaning Chemicals and Hardware Products
East Riding of Yorkshire Council · Local authority · Yorkshire and the Humber
Panel: Arrow County Supplies, Banner Group Limited, Bunzl UK Ltd trading as Greenham +13 more
- Published value
- £840kpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 2 Sept 2028 · start not published
- Reference
ocds-h6vhtk-0439de
- Estimated end · in 675 days
Contract
Translink · Northern Ireland
Incumbent: AUTOGLYM LIMITED · Last contest: 6 bids (1 SME)
Translink require a competent contractor to supply suitable cleaning products for the cleaning of Buses, Trains and Workshops. Your proposal MUST be submitted within the eTendersNI portal, via this CfT. NO OTHER METHOD OF SUBMISSION WILL BE…
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Estimated end 2 Sept 2028 · start not published
- Reference
ocds-h6vhtk-03dbe9
- Estimated end · in 676 daysFramework recordPanel · 14 suppliers
Sustainable Furniture
APUC Ltd · Scotland
Panel: Alpha Marketing UK Ltd, Azzurro Ltd, Bishops Beds Ltd +11 more
- Published value
- £38mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 3 Sept 2028 · start not published
- Reference
ocds-h6vhtk-047c4a
- Estimated end · in 677 days
Air Conditioning - VRV/F and Split Type
Royal Marsden NHS Foundation · NHS & health · Greater London
Incumbent: Atlas Maintenance Services Limited · Last contest: 5 bids (5 SME)
The Royal Marsden NHS Foundation Trust is contracting for a maintenance contract for its VRV/F and Split Type Air Conditioning equipment across two Trust sites. The contract is split into three Lots. Lot 1 for VRV/F Units. For this Lot all …
- Published value
- £187k
- Annual run-rate
- —start date not published
- Term
- Estimated end 4 Sept 2028 · start not published
- Reference
ocds-h6vhtk-038c44
- Estimated end · in 677 days
Air Conditioning - VRV/F and Split Type
Royal Marsden NHS Foundation · NHS & health · Greater London
Incumbent: JCW Energy Services Ltd. · Last contest: 3 bids (3 SME)
The Royal Marsden NHS Foundation Trust is contracting for a maintenance contract for its VRV/F and Split Type Air Conditioning equipment across two Trust sites. The contract is split into three Lots. Lot 1 for VRV/F Units. For this Lot all …
- Published value
- £103k
- Annual run-rate
- —start date not published
- Term
- Estimated end 4 Sept 2028 · start not published
- Reference
ocds-h6vhtk-038c44
- Ends · in 684 daysExtension option · up to 11 Sept 2030
Close Call Housing Furniture
West Yorkshire Fire and Rescue Authority · Police & fire · Yorkshire and the Humber
Incumbent: FMS Interior Services Limited
To provide a consistent and standard supplier to provide new or replacement furniture to the close call houses provided to operational personnel on call at various fire station locations within West Yorkshire.
- Published value
- £45k
- Annual run-rate
- £22kpublished value ÷ term, exc. VAT
- Term
- 12 Sept 2026 → 11 Sept 2028 · 2 yrs · up to 11 Sept 2030 with extensions
- Reference
ocds-h6vhtk-06e428
- Estimated end · in 685 daysFramework record
WHC - Kitchen Supply
Welwyn Hatfield Borough Council · Local authority · East of England
Incumbent: Howdens Joinery
- Published value
- £5.0mpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 12 Sept 2028 · start not published
- Reference
ocds-h6vhtk-03d4e7
- Estimated end · in 691 daysPanel · 4 suppliers
Bury College - Furniture Provision - ITT
Bury College · Education · North West England
Panel: DIRECTIVE OFFICE LIMITED, Dams Furniture Limited, Gresham Office Furniture Limited +1 more · Last contest: 12 bids
Bury College - provision of furniture for a 3 year £0 guaranteed spend with option for 1 year extension
- Published value
- £3.0m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 18 Sept 2028 · start not published
- Reference
ocds-h6vhtk-046e6c
- Ends · in 703 daysExtension option · up to 30 Sept 2030
Provision of Specialist Ergonomic Furniture & Associated Services
Nottingham Trent University · Education · East Midlands
Incumbent: BACK CARE SOLUTIONS
The supply of specialist furniture and equipment bespoke to the end user's needs typically following an occupational health assessment.
- Published value
- £300kinc. VAT as published
- Annual run-rate
- £153kpublished value ÷ term, inc. VAT
- Term
- 15 Oct 2026 → 30 Sept 2028 · 2 yrs · up to 30 Sept 2030 with extensions
- Reference
ocds-h6vhtk-078727
When contracts end · Furniture, furnishings, domestic appliances i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
545 contracts and agreements end within 24 months, 742 in total · £478m published GBP values end in the all future end dates, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, all future end dates i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services9,87279Business services: law, marketing, consulting5,54760Transport services (except waste transport)4,94245Construction work4,73450Repair and maintenance services3,69972IT services: consulting, software, internet3,48771Architectural, construction, engineering3,30480Education and training services2,867
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.