Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 1,501–1,515
- Estimated end · in 179 daysCall-offPanel · 2 suppliers
Edinburgh and South Scotland
Places for People on behalf of PfP & Anchor Hanover Group · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East of England, Scotland
Panel: Prestige Plant Room Services Ltd, Saltire Facilities Management Ltd · Last contest: 3 bids
Places for People has sought to appoint a contract for Non-Domestic Gas Servicing & Responsive Maintenance for a three (3) year initial term, with an option to extend for a further two 12 month periods (3+1+1).
- Published value
- £170kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 25 Apr 2027 · start not published
- Reference
ocds-h6vhtk-043589
- Estimated end · in 179 daysCall-offPanel · 2 suppliers
Yorkshire and Humberside
Places for People on behalf of PfP & Anchor Hanover Group · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East of England, Scotland
Panel: Prestige Plant Room Services Ltd, Sure Maintenance Ltd · Last contest: 6 bids
Places for People has sought to appoint a contract for Non-Domestic Gas Servicing & Responsive Maintenance for a three (3) year initial term, with an option to extend for a further two 12 month periods (3+1+1).
- Published value
- £121kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 25 Apr 2027 · start not published
- Reference
ocds-h6vhtk-043589
- Estimated end · in 179 daysCall-offPanel · 2 suppliers
South Midlands and East Anglia
Places for People on behalf of PfP & Anchor Hanover Group · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East of England, Scotland
Panel: GetFix Ltd, Prestige Plant Room Services Ltd · Last contest: 3 bids
Places for People has sought to appoint a contract for Non-Domestic Gas Servicing & Responsive Maintenance for a three (3) year initial term, with an option to extend for a further two 12 month periods (3+1+1).
- Published value
- £95kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 25 Apr 2027 · start not published
- Reference
ocds-h6vhtk-043589
- Estimated end · in 179 daysCall-offPanel · 2 suppliers
North Midlands
Places for People on behalf of PfP & Anchor Hanover Group · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East of England, Scotland
Panel: GetFix Ltd, Sure Maintenance Ltd · Last contest: 5 bids
Places for People has sought to appoint a contract for Non-Domestic Gas Servicing & Responsive Maintenance for a three (3) year initial term, with an option to extend for a further two 12 month periods (3+1+1).
- Published value
- £81kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 25 Apr 2027 · start not published
- Reference
ocds-h6vhtk-043589
- Estimated end · in 179 daysCall-offPanel · 2 suppliers
North East
Places for People on behalf of PfP & Anchor Hanover Group · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East of England, Scotland
Panel: DFP Services Ltd, Prestige Plant Room Services Ltd · Last contest: 4 bids
Places for People has sought to appoint a contract for Non-Domestic Gas Servicing & Responsive Maintenance for a three (3) year initial term, with an option to extend for a further two 12 month periods (3+1+1).
- Published value
- £68kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 25 Apr 2027 · start not published
- Reference
ocds-h6vhtk-043589
- Ends · in 181 days
Pier Gardens Principal Contractor
NORTH EAST LINCOLNSHIRE COUNCIL · Local authority · Yorkshire and the Humber
Incumbent: MAYLIM LIMITED · Last contest: awarded 36% over the estimate
North East Lincolnshire Council is seeking a Principal Contractor for Pier Gardens, Cleethorpes.
- Published value
- £8.0m
- Annual run-rate
- £6.6mpublished value ÷ term, exc. VAT
- Term
- 9 Feb 2026 → 27 Apr 2027 · 1.3 yrs
- Reference
ocds-h6vhtk-054dcc
- Ends · in 181 daysExtension option · up to 27 Apr 2028
Light Gauge Steel Frame Installation Works - New Ferry Site A
Regenda Limited · Other public body · North West England
Incumbent: IMS Facades Limited
M&Y carried out a below threshold request for quotation to deliver works in relation to Light Gauge Steel Frame Installation Works at New Ferry Site A, Cheshire
- Published value
- £263k
- Annual run-rate
- £261kpublished value ÷ term, exc. VAT
- Term
- 24 Apr 2026 → 27 Apr 2027 · 1 yr · up to 27 Apr 2028 with extensions
- Reference
ocds-h6vhtk-068ca6
- Estimated end · in 183 days
Tender for Devlopment of Flats at Blackness Road, Dundee
Dundee City Council · Local authority · Scotland
Incumbent: Clark Contracts Ltd · Last contest: 4 bids (2 SME)
This two stage Restricted procurement process is for the contract for development of flats at Blackness Road. Dundee City Council is seeking to appoint a competent contractor for the provision of the construction of the development of the f…
- Published value
- £6.0m
- Annual run-rate
- —start date not published
- Term
- Estimated end 29 Apr 2027 · start not published
- Reference
ocds-h6vhtk-04bce5
- Ends · in 183 days
SKDC-1400-Grantham Canal
South Kesteven District Council · Local authority · East Midlands
Incumbent: Ecs Engineering Services Ltd · Last contest: awarded at the estimate
To undertake works to control the water levels of the Grantham Canal by installation of stop logs into existing culvert structures and works to install safe means of access structures so that maintenance and inspection of the canal infrastr…
- Published value
- £225k
- Annual run-rate
- £208kpublished value ÷ term, exc. VAT
- Term
- 30 Mar 2026 → 29 Apr 2027 · 1.1 yrs
- Reference
ocds-h6vhtk-05e571
- Ends · in 183 daysExtension option · up to 19 Feb 2030
Refurbishment of utility blocks 7 and 8
Oxfordshire County Council · Local authority · South East England
Incumbent: CURTIS BUILDING SERVICES LIMITED
Refurbishment of utility blocks 7 and 8, to include new bathrooms and kitchens, new heating, rewiring, redecoration, new flooring and associated works.
- Published value
- £107k
- Annual run-rate
- £90kpublished value ÷ term, exc. VAT
- Term
- 20 Feb 2026 → 29 Apr 2027 · 1.2 yrs · up to 19 Feb 2030 with extensions
- Reference
ocds-h6vhtk-0677ff
- Ends · in 184 daysPanel · 13 suppliers
ALL LOTS
LHC for the Scottish Procurement Alliance (SPA) · Scotland
Panel: BAM CONSTRUCTION LIMITED, Balfour Beatty Construction Ltd, Bancon Construction Limited +10 more
- Published value
- £750m
- Annual run-rate
- —panel, not one supplier
- Term
- 1 Oct 2021 → 30 Apr 2027 · 5.6 yrs
- Reference
ocds-h6vhtk-06800a
- Ends · in 184 daysLinked to a framework or DPSPanel · 8 suppliers
ALL LOTS
LHC Procurement Group · Wales (Cymru)
Panel: Galliford Try Construction Limited, Kier Construction Ltd, M & J GROUP (CONSTRUCTION & ROOFING) LTD +5 more
- Published value
- £16mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- 1 Oct 2021 → 30 Apr 2027 · 5.6 yrs
- Reference
ocds-h6vhtk-068031
- Ends · in 184 days
Rosemount Avenue, Preesall, FY6 0EY
Progress Housing Group · Housing · North West England
Incumbent: Breck Homes Limited
Design and construction of 51 No. Houses including services, external works, adoptable highways, and drainage for Affordable Rent (31 No.) and Shared Ownership (20 No.)
- Published value
- £9.8m
- Annual run-rate
- £5.9mpublished value ÷ term, exc. VAT
- Term
- 29 Aug 2025 → 30 Apr 2027 · 1.7 yrs
- Reference
ocds-h6vhtk-056bbb
- Ends · in 184 days
NUNCON - NBBC - Re-Roofing Contract
Nuneaton and Bedworth Borough Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Integral Roofing and Maintenance Services Ltd · Last contest: 8 bids
Re-roofing of various types of roof coverings to various types of properties
- Published value
- £5.1m
- Annual run-rate
- —start date not published
- Term
- Ends 30 Apr 2027 · start not published
- Reference
ocds-h6vhtk-043d4b
- Ends · in 184 days
NUN - NBBC - Re-Roofing Contract
Nuneaton and Bedworth Borough Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Integral Roofing and Maintenance Services Ltd · Last contest: 8 bids
- Published value
- £4.4m
- Annual run-rate
- —start date not published
- Term
- Ends 30 Apr 2027 · start not published
- Reference
ocds-h6vhtk-043d4b
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,836 contracts and agreements end within 24 months, 4,734 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,60979Business services: law, marketing, consulting2,66545Construction work2,10472IT services: consulting, software, internet1,62560Transport services (except waste transport)1,54071Architectural, construction, engineering1,42150Repair and maintenance services1,40880Education and training services1,260
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.