Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 1,516–1,530
- Ends · in 184 daysExtension option · up to 29 Apr 2028
Groundworks for New Ferry Site A Cheshire
Regenda Limited · Other public body
Incumbent: Thomas Contracting Ltd
M&Y completed a request for quotations to appoint a suitable subcontractor to carry out the required groundworks in relation to site at New Ferry (site A) Cheshire.
- Published value
- £1.8m
- Annual run-rate
- £1.4mpublished value ÷ term, exc. VAT
- Term
- 1 Feb 2026 → 30 Apr 2027 · 1.3 yrs · up to 29 Apr 2028 with extensions
- Reference
ocds-h6vhtk-068ca8
- Ends · in 184 days
WWP Penyrheol Phase 2
City & County of Swansea · Local authority · Wales (Cymru)
Incumbent: ASW Property Services Limited · Last contest: awarded 1% over the estimate
The works will comprise of the upgrade of the external fabric of the properties with the installation of External Wall Insulation (EWI) and accompanying render system, renewal of roof coverings and associated features and the renewal of win…
- Published value
- £1.7m
- Annual run-rate
- £1.7mpublished value ÷ term, exc. VAT
- Term
- 30 Apr 2026 → 30 Apr 2027 · 1 yr
- Reference
ocds-h6vhtk-05abc8
- Ends · in 184 days
PRN26016 (PF23-019) Taylor Cheshire House MEI
Choice Housing Ireland Limited · Other public body
Incumbent: Michael Donaghy (Painting & Decorating Contractor) Limited · Last contest: awarded 6% under the estimate
Choice Housing Ireland wish to appoint a suitably qualified contractor to carry out Multi-Element Improvement (MEI) works at Taylor Cheshire House, Belfast. The works will include Kitchen replacement, bathroom replacement, replacement of wi…
- Published value
- £1.4minc. VAT as published
- Annual run-rate
- £1.9mpublished value ÷ term, inc. VAT
- Term
- 10 Aug 2026 → 30 Apr 2027 · 9 months
- Reference
ocds-h6vhtk-06554a
- Ends · in 184 days
Design of and Demolition - Gipton Gate East and West, Harehills, Leeds
Leeds City Council · Local authority
Incumbent: METROPOLITAN DEMOLITION LTD
Design of and Demolition - Gipton Gate East and West, Harehills Leeds
- Published value
- £1.3m
- Annual run-rate
- £1.4mpublished value ÷ term, exc. VAT
- Term
- 1 Jun 2026 → 30 Apr 2027 · 11 months
- Reference
ocds-h6vhtk-06b38b
- Ends · in 184 days
Tooting hub Refurbishment
London Borough of Wandsworth · Local authority · Greater London
Incumbent: Ash Capital
Development/conversion of Tooting Hub, 7a Beechcroft Road, Tooting, SW17 7BU to a Family Hub
- Published value
- £996k
- Annual run-rate
- £994kpublished value ÷ term, exc. VAT
- Term
- 30 Apr 2026 → 30 Apr 2027 · 1 yr
- Reference
ocds-h6vhtk-067a82
- Ends · in 184 daysExtension option · up to 30 May 2028
Appointment of mechanical works for New Ferry site A
Regenda Limited · Other public body · North West England
Incumbent: CP Hood
M&Y carried out a below threshold request for quotation to deliver mechanical works at new ferry site A. For more information about this opportunity, please visit the eSourcing portal at: https://www.delta-esourcing.com/tenders/UK-UK-Liverp…
- Published value
- £748kinc. VAT as published
- Annual run-rate
- £693kpublished value ÷ term, inc. VAT
- Term
- 2 Apr 2026 → 30 Apr 2027 · 1.1 yrs · up to 30 May 2028 with extensions
- Reference
ocds-h6vhtk-068c9f
- Ends · in 184 daysExtension option · up to 29 Apr 2028
Timber Frame Installation Works - M&Y New Ferry Site A
Regenda Limited · Other public body · North West England
Incumbent: Sticx Limited
M&Y completed a request for quotation exercise to appoint a subcontractor to deliver works in relation to timber frame installations at New Ferry Site A Cheshire
- Published value
- £525k
- Annual run-rate
- £485kpublished value ÷ term, exc. VAT
- Term
- 1 Apr 2026 → 30 Apr 2027 · 1.1 yrs · up to 29 Apr 2028 with extensions
- Reference
ocds-h6vhtk-068ca5
- Ends · in 184 days
Phase 2 ground floor refurbishment at Northway Clinic
NHS Property Services Limited · NHS & health
Incumbent: Acomb Construction Limited
Phase 2 ground floor refurbishment for Northway Clinic
- Published value
- £484k
- Annual run-rate
- —term under 6 months
- Term
- 11 Jan 2027 → 30 Apr 2027 · 4 months
- Reference
ocds-h6vhtk-0791a6
- Ends · in 184 days
LTM - Library Lighting Replacement Basement Ground Floor
University of Sussex · Education · South East England
Incumbent: Lake Electrical Limited
Replacement of the lighting in the library on the ground and basement floors to ensure compliance with relevant legislation.
- Published value
- £404k
- Annual run-rate
- £386kpublished value ÷ term, exc. VAT
- Term
- 13 Apr 2026 → 30 Apr 2027 · 1.1 yrs
- Reference
ocds-h6vhtk-068160
- Ends · in 184 days
Woodlands School Roof Pitched Roof Upgrade
Milton Keynes Council · Local authority · South East England
Incumbent: CAMBRIDGE FLAT ROOFING COMPANY LIMITED
Milton Keynes City Council are currently out to tender for the provision of Pitched Roof Upgrade at Woodlands School Suppliers that would like to take part in this tender process are invited to "Express Interest" upon which they will be giv…
- Published value
- £283k
- Annual run-rate
- £160kpublished value ÷ term, exc. VAT
- Term
- 23 Jul 2025 → 30 Apr 2027 · 1.8 yrs
- Reference
ocds-h6vhtk-050e2e
- Ends · in 184 days
HPCS Award for Gym Refurbishment and Expansion project
London Borough of Haringey · Local authority · Nationwide (UK)
Incumbent: Inspace Fitness LTD
We are seeking a qualified supplier to develop comprehensive plans, designs, and project management of the implementation of the building works for the full refurbishment and expansion of two gym facilities at Tottenham Green (TGLC) and Par…
- Published value
- £260k
- Annual run-rate
- £214kpublished value ÷ term, exc. VAT
- Term
- 12 Feb 2026 → 30 Apr 2027 · 1.3 yrs
- Reference
ocds-h6vhtk-068f89
- Ends · in 184 days
Fire Safety Works at Green Lane School
Warrington Borough Council · Local authority · North West England
Incumbent: Anthony Dever Construction Ltd
Remedial Building Work (Fire Safety) at Green Lane School in Warrington
- Published value
- £245k
- Annual run-rate
- £410kpublished value ÷ term, exc. VAT
- Term
- 25 Sept 2026 → 30 Apr 2027 · 7 months
- Reference
ocds-h6vhtk-078ece
- Ends · in 184 days
Digital Monitoring Convertors
Orbit Group Limited · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Appello Smart Living Solutions
Digital monitoring convertors for warden call
- Published value
- £220kinc. VAT as published
- Annual run-rate
- £263kpublished value ÷ term, inc. VAT
- Term
- 30 Jun 2026 → 30 Apr 2027 · 10 months
- Reference
ocds-h6vhtk-06d70f
- Ends · in 184 days
Annexe Roof Replacement and Associated Works at Pebble Hill Mobile Home Park, Radley, Oxon
Vale of White Horse District Council · Local authority · South East England
Incumbent: Maylarch Environmental Ltd · Last contest: awarded 2% over the estimate
Pebble Hill Mobile Home Park is located in Radley, Oxfordshire. It comprises of 104 permanent residential mobile homes, served by a private access road. The park is situated off the main highway and is surrounded by woodland, an adjacent mo…
- Published value
- £183k
- Annual run-rate
- £336kpublished value ÷ term, exc. VAT
- Term
- 14 Oct 2026 → 30 Apr 2027 · 7 months
- Reference
ocds-h6vhtk-06928a
- Ends · in 184 days
Chestnuts Park
London Borough of Haringey · Local authority · Nationwide (UK)
Incumbent: HAGS SMP Ltd
The council is inviting suitably experienced and qualified Contractors/Suppliers to tender for Playground Design, Playground Equipment, Surfacing and Install in accordance with the RFQ documents. · Playground Design, Playground Equipment, S…
- Published value
- £131k
- Annual run-rate
- £109kpublished value ÷ term, exc. VAT
- Term
- 17 Feb 2026 → 30 Apr 2027 · 1.2 yrs
- Reference
ocds-h6vhtk-06ca37
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,836 contracts and agreements end within 24 months, 4,734 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,60979Business services: law, marketing, consulting2,66545Construction work2,10472IT services: consulting, software, internet1,62560Transport services (except waste transport)1,54071Architectural, construction, engineering1,42150Repair and maintenance services1,40880Education and training services1,260
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.