Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 1,561–1,575
- Ends · in 189 days
Chatham Court & High Street EA Services
Wandle Housing Association Limited · Charity · Greater London
Incumbent: Re-Gen (UK) Construction Ltd · Last contest: awarded 14% under the estimate
Chatham Court: Removing the current, combustible insulation, and replacing this system with a new, fixed system using A1, s1- d0 materials. Cavity Barriers are also due to be fitted, along all compartment walls/floors, where the insulation …
- Published value
- £354k
- Annual run-rate
- £537kpublished value ÷ term, exc. VAT
- Term
- 7 Sept 2026 → 5 May 2027 · 8 months
- Reference
ocds-h6vhtk-0610e5
- Ends · in 189 days
Cleveland Health Centre - Left-hand Lift Replacement
NHS Property Services Limited · NHS & health
Incumbent: UK LIFT AND ESCALATOR COMPANY LTD
Contract for Cleveland Health Centre - Left-hand Lift Replacement
- Published value
- £150k
- Annual run-rate
- —term under 6 months
- Term
- 15 Feb 2027 → 5 May 2027 · 3 months
- Reference
ocds-h6vhtk-07843d
- Estimated end · in 190 daysFramework recordPanel · 38 suppliers
Energy Efficiency Framework
The Highland Council · Local authority · Scotland
Panel: AES Solar, Alternative Heat Ltd., Asset Integrity Scotland ltd +35 more
- Published value
- £25mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 6 May 2027 · start not published
- Reference
ocds-h6vhtk-04b5d6
- Ends · in 191 daysExtension option · up to 7 Nov 2027
Kingswood Park Restoration and Enhancement Project 2025
South Gloucestershire Council · Local authority · South West England
Incumbent: K.P.Wilton & Son Limited · Last contest: awarded 20% under the estimate
Programme of capital work to improve accessibility and facilities within the park, including construction of new public toilet, significant park hard & soft landscape improvements, resurfacing paths and new access ramps.
- Published value
- £1.6m
- Annual run-rate
- £1.8mpublished value ÷ term, exc. VAT
- Term
- 22 Jun 2026 → 7 May 2027 · 11 months · up to 7 Nov 2027 with extensions
- Reference
ocds-h6vhtk-05d10a
- Ends · in 191 daysExtension option · up to 7 May 2028
Changes to Yorkshire Water apparatus necessitated by construction of forthcoming West Bradford Cycle Superhighway Phase 2
City of Bradford Metropolitan District Council · Local authority · Yorkshire and the Humber
Incumbent: Yorkshire Water Services Ltd
Changes to YW apparatus necessitated by construction of forthcoming West Bradford Cycle Superhighway Phase 2. Yorkshire Water are the only contractor who can carry out works on their apparatus which is required to be amended to facilitate t…
- Published value
- £41k
- Annual run-rate
- £44kpublished value ÷ term, exc. VAT
- Term
- 5 Jun 2026 → 7 May 2027 · 11 months · up to 7 May 2028 with extensions
- Reference
ocds-h6vhtk-06ae7b
- Estimated end · in 192 daysFramework recordPanel · 12 suppliers
Estates Minor Works Framework (Maintenance Framework)
Cardiff University · Education · Wales (Cymru)
Panel: 2D Building Contractors, A J CREWS & CO LIMITED, ARC ELECTRICAL SYSTEMS LTD +9 more
- Published value
- £6.0mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 8 May 2027 · start not published
- Reference
ocds-h6vhtk-0401a9
- Ends · in 192 days
Museum of Two Halves Project, Wrexham - Enabling and Shell & Core Works Package
Wrexham County Borough Council · Local authority · Wales (Cymru)
Incumbent: SWG Construction (Build and Renovate) Ltd · Last contest: 4 bids (4 SME)
Award of contract for appoinment of a principle building contractor for the Base Build Construction Works (Shell & Core) for the refurbishment of the Grade II Listed Wrexham County Borough Museum & Archives building (County Buildings, Regen…
- Published value
- £5.5m
- Annual run-rate
- £1.9mpublished value ÷ term, exc. VAT
- Term
- 20 May 2024 → 8 May 2027 · 3 yrs
- Reference
ocds-h6vhtk-040c90
- Ends · in 192 days
Museum of Two Halves – Base Build Construction Works (Shell & Core)
Wrexham County Borough Council · Local authority · Wales (Cymru)
Incumbent: SWG Construction (Build and Renovate) Ltd · Last contest: 4 bids (4 SME)
- Published value
- £5.4m
- Annual run-rate
- £1.8mpublished value ÷ term, exc. VAT
- Term
- 20 May 2024 → 8 May 2027 · 3 yrs
- Reference
ocds-h6vhtk-040c90
- Estimated end · in 193 days
Supply and Installation of Fire Doors in Housing Blocks
Newcastle City Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Straightline NE Ltd · Last contest: 15 bids (11 SME)
Supply and installation of fire doors, Citywide
- Published value
- £5.2m
- Annual run-rate
- —start date not published
- Term
- Estimated end 9 May 2027 · start not published
- Reference
ocds-h6vhtk-04d044
- Ends · in 193 daysExtension option · up to 28 Mar 2030
Witney Drill Tower Structural Repairs
Oxfordshire County Council · Local authority · South East England
Incumbent: GUNITE (EASTERN) LIMITED
Witney Fire Station - Drill Tower Structural Repairs
- Published value
- £89k
- Annual run-rate
- £79kpublished value ÷ term, exc. VAT
- Term
- 28 Mar 2026 → 9 May 2027 · 1.1 yrs · up to 28 Mar 2030 with extensions
- Reference
ocds-h6vhtk-0688d0
- Estimated end · in 194 daysPanel · 4 suppliers
BCHN (Buchan)
Aberdeenshire Council · Local authority · Scotland
Panel: Crystal Clear Grampian Ltd, James Fairley Design and Build, Space Solutions (Scotland) Limited +1 more · Last contest: 4 bids (4 SME)
Aberdeenshire Council require competitive tenders of suitably qualified contractors to complete the Housing Repairs – Builder Work. The project will involve working to a strict priority timeline and ensuring excellent communication skills b…
- Published value
- £4.2m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 10 May 2027 · start not published
- Reference
ocds-h6vhtk-04eea3
- Estimated end · in 194 daysPanel · 4 suppliers
BBU2 (Banff and Buchan 2)
Aberdeenshire Council · Local authority · Scotland
Panel: Crystal Clear Grampian Ltd, James Fairley Design and Build, Space Solutions (Scotland) Limited +1 more · Last contest: 4 bids (4 SME)
Aberdeenshire Council require competitive tenders of suitably qualified contractors to complete the Housing Repairs – Builder Work. The project will involve working to a strict priority timeline and ensuring excellent communication skills b…
- Published value
- £2.1m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 10 May 2027 · start not published
- Reference
ocds-h6vhtk-04eea3
- Estimated end · in 194 daysPanel · 4 suppliers
BCHN (Buchan)
Aberdeenshire Council · Local authority · Scotland
Panel: Crystal Clear Grampian Ltd, James Fairley Design and Build, Space Solutions (Scotland) Limited +1 more · Last contest: 4 bids (4 SME)
- Published value
- £1.1m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 10 May 2027 · start not published
- Reference
ocds-h6vhtk-04eea3
- Estimated end · in 194 daysPanel · 4 suppliers
KMRN ( Kincardine and Mearns)
Aberdeenshire Council · Local authority · Scotland
Panel: Bridgefield Services Ltd, Crystal Clear Grampian Ltd, James Fairley Design and Build +1 more · Last contest: 4 bids (4 SME)
Aberdeenshire Council require competitive tenders of suitably qualified contractors to complete the Housing Repairs – Builder Work. The project will involve working to a strict priority timeline and ensuring excellent communication skills b…
- Published value
- £1.0m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 10 May 2027 · start not published
- Reference
ocds-h6vhtk-04eea3
- Estimated end · in 194 daysPanel · 3 suppliers
BBU (Banff and Buchan 1)
Aberdeenshire Council · Local authority · Scotland
Panel: Crystal Clear Grampian Ltd, James Fairley Design and Build, Space Solutions (Scotland) Limited · Last contest: 3 bids (3 SME)
Aberdeenshire Council require competitive tenders of suitably qualified contractors to complete the Housing Repairs – Builder Work. The project will involve working to a strict priority timeline and ensuring excellent communication skills b…
- Published value
- £920k
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 10 May 2027 · start not published
- Reference
ocds-h6vhtk-04eea3
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,836 contracts and agreements end within 24 months, 4,734 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,60979Business services: law, marketing, consulting2,66545Construction work2,10472IT services: consulting, software, internet1,62560Transport services (except waste transport)1,54071Architectural, construction, engineering1,42150Repair and maintenance services1,40880Education and training services1,260
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.