Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 151–165

  1. Ends · in 34 daysPanel · 2 suppliers

    Orchard Theatre Roof Works - Air intake and extract system

    Dartford Borough Council · Local authority · South East England

    Panel: CAR PARK SYSTEMS LIMITED, Car Parking Systems Limited

    Following CFD smoke modelling exercise, in order to satisfy the Fire Strategy for the building, a design for the additional air intake and extract to the theatre auditorium was needed

    Published value
    £75k
    Annual run-rate
    —panel, not one supplier
    Term
    3 Mar 2026 → 30 Nov 2026 · 9 months
    Reference
    ocds-h6vhtk-065fa1
  2. Ends · in 34 days

    LR Planning Application

    Bath Spa University · Education · South West England

    Incumbent: CBRE Limited

    A specialist planning consultant is required due to the nuanced heritage, planning, and conservation constraints affecting design proposals for the site on Locksbrook Road.

    Published value
    £73kinc. VAT as published
    Annual run-rate
    £80kpublished value ÷ term, inc. VAT
    Term
    1 Jan 2026 → 30 Nov 2026 · 11 months
    Reference
    ocds-h6vhtk-0667fe
  3. Ends · in 34 days

    Banbury Swan Close

    Oxfordshire County Council · Local authority · South East England

    Incumbent: Amey OW Limited

    Optioneering and Feasibility development for a road network scheme

    Published value
    £70k
    Annual run-rate
    £139kpublished value ÷ term, exc. VAT
    Term
    1 Jun 2026 → 30 Nov 2026 · 6 months
    Reference
    ocds-h6vhtk-06bbab
  4. Ends · in 34 days

    Fire Strategy Consultancy Services

    Nottingham Trent University · Education · East Midlands

    Incumbent: Tetra Tech · Last contest: awarded 20% over the estimate

    Nottingham Trent University (NTU) is seeking to appoint a competent and suitably qualified third party i.e. a fire engineer or architect, to undertake a third party fire strategy and compartmentation review of selected university buildings.…

    Published value
    £60k
    Annual run-rate
    £60kpublished value ÷ term, exc. VAT
    Term
    1 Dec 2025 → 30 Nov 2026 · 1 yr
    Reference
    ocds-h6vhtk-05d276
  5. Ends · in 34 days

    St Peter's Area Improvements - Design work

    Islington Council · Local authority · Nationwide (UK)

    Incumbent: SUSTRANS

    The focus of the Liveable Neighbourhood programme is on reducing danger from traffic, improving air quality, promoting active forms of travel, improving public realm and creating green spaces within the area.

    Published value
    £57k
    Annual run-rate
    £44kpublished value ÷ term, exc. VAT
    Term
    14 Aug 2025 → 30 Nov 2026 · 1.3 yrs
    Reference
    ocds-h6vhtk-059665
  6. Ends · in 34 days

    Party Wall Surveyor Services for Eastern Base Project

    The Mayor and Commonalty and Citizens of the City of London · Local authority · Greater London

    Incumbent: Ten 1 Surveyors Limited

    The Provision of Party Wall Surveyor Services for Eastern Base Project.

    Published value
    £55k
    Annual run-rate
    £38kpublished value ÷ term, exc. VAT
    Term
    19 Jun 2025 → 30 Nov 2026 · 1.4 yrs
    Reference
    ocds-h6vhtk-056bd0
  7. Ends · in 34 days

    Fire Engineer Services for Abbot's Wood (Priority Building)

    Your Housing Group · Housing · North West England

    Incumbent: OFR Consultants limited

    YHG have made a below threshold direct award to OFR Consultants for Fire Engineer Services for our Priority Building Project at Abbot's Wood, Chester. OFR were previously engaged before the Procurement Act to advise on this site. Due to the…

    Published value
    £54k
    Annual run-rate
    £43kpublished value ÷ term, exc. VAT
    Term
    6 Sept 2025 → 30 Nov 2026 · 1.3 yrs
    Reference
    ocds-h6vhtk-05ce25
  8. Ends · in 34 days

    Feasibility Study - Independent Review of Delf House Skelmersdale

    West Lancashire Borough Council · Local authority · North West England

    Incumbent: BROCK CARMICHAEL ARCHITECTS LLP

    Independent review into Delf House, Skelmersdale, WN8 6NY which will provide recommendations for the future usage of the building.

    Published value
    £52k
    Annual run-rate
    —term under 6 months
    Term
    21 Sept 2026 → 30 Nov 2026 · 2 months
    Reference
    ocds-h6vhtk-06b4f5
  9. Ends · in 34 days

    PLACE1012H Network Rail BAPA for Principal Bridge Inspections 2025/26

    Derbyshire County Council · Local authority · East Midlands

    Incumbent: Network Rail

    The services are for a BAPA (Basic Asset Protection Agreement) with Network Rail. This is to allow Derbyshire County Council in conjunction with our delivery partner Jacobs, to take possession of Network Rail infrastructure to allow for the…

    Published value
    £51kinc. VAT as published
    Annual run-rate
    £51kpublished value ÷ term, inc. VAT
    Term
    1 Dec 2025 → 30 Nov 2026 · 1 yr
    Reference
    ocds-h6vhtk-05ec3b
  10. Ends · in 34 days

    CSP26775 - Installation, testing and commissioning of laboratory LEV system

    UK Research and Innovation · Central government · Nationwide (UK)

    Incumbent: Labcom Ltd

    ***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded following a limited competition procurement exercise. UK Research Innovation (UKRI) had a requirement for Installation, testing an…

    Published value
    £50k
    Annual run-rate
    —term under 6 months
    Term
    17 Aug 2026 → 30 Nov 2026 · 3 months
    Reference
    ocds-h6vhtk-06e687
  11. Ends · in 34 days

    LB Hillingdon - Colham Green - Model Build & Appraisal

    London Borough of Hillingdon · Local authority · Greater London

    Incumbent: Metis Consultants Ltd

    Surface water modelling and option appraisal following the flood alleviation scheme feasibility assessment of the Colham Green catchment. This proposal covers Stages 2 and 3 of the project, as defined in the initial feasibility proposal sub…

    Published value
    £49kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    1 Aug 2026 → 30 Nov 2026 · 4 months
    Reference
    ocds-h6vhtk-078901
  12. Ends · in 34 days

    DSA Highmast Survey

    City of Doncaster Council · Local authority · Yorkshire and the Humber

    Incumbent: Luceco plc (Kingfisher Lighting)

    Survey only on the high masts airside and landside of the airport land

    Published value
    £48k
    Annual run-rate
    —not computed
    Term
    15 Jun 2026 → 30 Nov 2026 · 6 months
    Reference
    ocds-h6vhtk-0779f9
  13. Ends · in 34 days

    Spring Lodge - Clerk of Works

    Clarion Housing Property Development Service Limited · Other public body

    Incumbent: BAILY GARNER LLP

    Clerk of Works for Spring Lodge scheme in Orpington.

    Published value
    £47k
    Annual run-rate
    £43kpublished value ÷ term, exc. VAT
    Term
    27 Oct 2025 → 30 Nov 2026 · 1.1 yrs
    Reference
    ocds-h6vhtk-05f2dc
  14. Ends · in 34 days

    CM4 - Bathymetry & Topographic Surveys Bishop Rock and Longships Lighthouses

    Corporation of Trinity House · Central government

    Incumbent: Castle Surveys Limited

    Bathymetry & Topographic Surveys for two of our Lighthouses - Bishop Rock and Longships Lighthouses

    Published value
    £47k
    Annual run-rate
    —term under 6 months
    Term
    10 Oct 2026 → 30 Nov 2026 · 2 months
    Reference
    ocds-h6vhtk-078527
  15. Ends · in 34 daysExtension option · up to 18 Dec 2026

    Digital mapping of OCC green spaces and associated assets

    Oxford City Council · Local authority · South East England

    Incumbent: BRUNEL SURVEYS LIMITED

    To provide accurate digital mapping of all OCC green spaces and associated assets (walls, fences, street furniture etc)

    Published value
    £42kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    20 Sept 2026 → 30 Nov 2026 · 2 months · up to 18 Dec 2026 with extensions
    Reference
    ocds-h6vhtk-077e28

When contracts end · Architectural, construction, engineering
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,285 contracts and agreements end within 24 months, 3,292 in total · £790m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months395
  2. 3–6 months489
  3. 6–12 months529
  4. 12–24 months872

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.