Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 111–120

  1. Ends · in 3 days

    Wallop Primary School - External Door Replacement

    Hampshire County Council · Local authority · South East England

    Incumbent: HAZLEMERE WINDOW COMPANY LTD

    Replacement of double doors, glazed side panels and 5 no. glazed panels above double doors with new aluminium doors and glazed units. Please see attached image of double doors and surrounding glazed units to be replaced.

    Published value
    £15k
    Annual run-rate
    —term under 6 months
    Term
    26 Oct 2026 → 30 Oct 2026 · 5 days
    Reference
    ocds-h6vhtk-0789f6
  2. Ends · in 3 days

    Replacement of the damaged Essential Distribution Board

    Met Office · Central government · Northern Ireland

    Incumbent: GRS Building Services

    Replacement of the damaged Essential Distribution Board in Met Office Castor Bay, Lurgan, Craigavon, Northern Ireland.

    Published value
    £13k
    Annual run-rate
    —term under 6 months
    Term
    19 Oct 2026 → 30 Oct 2026 · 12 days
    Reference
    ocds-h6vhtk-07909a
  3. Ends · in 3 days

    Willow Court Nursing Care Home, Forest Court Nursing Care Home, Hawthorne Court Nursing Care Home - Access Control

    Hampshire County Council · Local authority · South East England

    Incumbent: A.J. TAYLOR ELECTRICAL CONTRACTORS LIMITED

    Anticipated Five pairs of corridor doors across three sites are currently held open by door retaining devices linked to the fire alarm system. In the event of a fire alarm activation, the doors are released by the door closers and the exist…

    Published value
    £12k
    Annual run-rate
    —term under 6 months
    Term
    5 Oct 2026 → 30 Oct 2026 · 26 days
    Reference
    ocds-h6vhtk-0789c1
  4. Ends · in 3 days

    Gordano Valley NNR Culvert construction

    NATURAL ENGLAND (Defra Network eTendering Portal) · Central government · South West England

    Incumbent: Pcknowles Agricultural Contractors · Last contest: awarded 2% under the estimate

    Construction of culvert on viewed rhyne at Gordano Valley NNR

    Published value
    £12k
    Annual run-rate
    —term under 6 months
    Term
    3 Aug 2026 → 30 Oct 2026 · 3 months
    Reference
    ocds-h6vhtk-06ac1c
  5. Ends · in 3 days

    25/0394/H

    Borough of Telford & Wrekin · Local authority · Nationwide (UK)

    Incumbent: Broad Oak Properties Limited

    Specialist ramp, WC alteration

    Published value
    £11k
    Annual run-rate
    —term under 6 months
    Term
    28 Sept 2026 → 30 Oct 2026 · 33 days
    Reference
    ocds-h6vhtk-07829b
  6. Ends · in 3 days

    FWKORD0050 - P12111 Alphington Street, Willeys Avenue, Exeter-1

    Devon County Council · Local authority · South West England

    Incumbent: Cormac Contracting Ltd

    Highways Work Orders under or equal to 200,000. This will be for six suppliers.

    Published value
    £9k
    Annual run-rate
    —term under 6 months
    Term
    1 Oct 2026 → 30 Oct 2026 · 30 days
    Reference
    ocds-h6vhtk-077c25
  7. Ends · in 3 days

    25/0370/H

    Borough of Telford & Wrekin · Local authority · Nationwide (UK)

    Incumbent: WB BUILDING SERVICES LIMITED

    level access shower

    Published value
    £7k
    Annual run-rate
    —term under 6 months
    Term
    28 Sept 2026 → 30 Oct 2026 · 33 days
    Reference
    ocds-h6vhtk-07828c
  8. Ends · in 4 daysExtension option · up to 31 Dec 2026

    Northwich Market Fit out

    Cheshire west and Chester Borough Council · Local authority · North West England

    Incumbent: MEDLOCK FRB LIMITED

    Creating a new market for traders moving from the old location in Northwich.

    Published value
    £2.0minc. VAT as published
    Annual run-rate
    £2.7mpublished value ÷ term, inc. VAT
    Term
    2 Feb 2026 → 31 Oct 2026 · 9 months · up to 31 Dec 2026 with extensions
    Reference
    ocds-h6vhtk-060740
  9. Ends · in 4 daysExtension option · up to 31 Dec 2026

    Tushingham school extensions

    Cheshire west and Chester Borough Council · Local authority · North West England

    Incumbent: PAVE AWAYS LTD

    extensions at Tushingham Primary school

    Published value
    £1.4minc. VAT as published
    Annual run-rate
    £2.1mpublished value ÷ term, inc. VAT
    Term
    2 Mar 2026 → 31 Oct 2026 · 8 months · up to 31 Dec 2026 with extensions
    Reference
    ocds-h6vhtk-06130e
  10. Ends · in 4 days

    Fairfield School SEND Phase 1 Extension

    West Northamptonshire Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: PGR Group Limited

    The initial works comprise the removal of the existing temporary classroom and associated elements, then the construction of a new two classroom teaching blocks at Fairfield Primary School, Trinity Avenue, Northampton. See linked notice, Th…

    Published value
    £1.3m
    Annual run-rate
    £2.1mpublished value ÷ term, exc. VAT
    Term
    1 Apr 2026 → 31 Oct 2026 · 7 months
    Reference
    ocds-h6vhtk-068e36

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months922
  2. 3–6 months574
  3. 6–12 months591
  4. 12–24 months729

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.