Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 1,101–1,200

  1. Ends · in 124 days

    Flat Roof New decking at Knaves Court

    Housing 21 · Central government · West Midlands

    Incumbent: M & J GROUP (CONSTRUCTION & ROOFING) LTD

    Flat Roof New decking at Knaves Court (Housing 21)

    Published value
    £285k
    Annual run-rate
    —term under 6 months
    Term
    1 Dec 2026 → 28 Feb 2027 · 3 months
    Reference
    ocds-h6vhtk-07891a
  2. Ends · in 124 days

    Window and Doors Replacement Works

    Northumberland County Council · Local authority · North East England

    Incumbent: Anglian Windows Limited

    A contract to complete works at properties which formed part of a wider cyclical replacement programme. The Council awarded a lotted contract for cyclical window and door replacement works in 2023 following a below-threshold open tender pro…

    Published value
    £203k
    Annual run-rate
    —not computed
    Term
    11 Sept 2026 → 28 Feb 2027 · 6 months
    Reference
    ocds-h6vhtk-0776f7
  3. Ends · in 124 daysExtension option · up to 31 Aug 2027

    HVPS Electrical Installation

    UK Atomic Energy Authority · Central government · South East England

    Incumbent: THE OXFORD MECHANICAL & ELECTRICAL COMPANY LTD · Last contest: awarded at the estimate

    The UK Atomic Energy Authority (UKAEA) has a requirement for the Electrical Installation of Plant and equipment within, and associated with, the Building D15 High Voltage Power Supplies. UKAEA are seeking a Contractor capable of supplying p…

    Published value
    £190k
    Annual run-rate
    —not computed
    Term
    2 Sept 2026 → 28 Feb 2027 · 6 months · up to 31 Aug 2027 with extensions
    Reference
    ocds-h6vhtk-06ce18
  4. Ends · in 124 days

    KAS/CKI KAS/26-27/001/AWR-MOJ - DIVIDING WALL IN MEDICAL ROOM ITT

    Gov Facility Services Ltd · Other public body

    Incumbent: PMA (SERVICES) LTD

    KAS/CKI KAS/26-27/001/AWR-MOJ - DIVIDING WALL IN MEDICAL ROOM ITT - KAS/CKI KAS/26-27/001/AWR-MOJ

    Published value
    £110k
    Annual run-rate
    —term under 6 months
    Term
    1 Jan 2027 → 28 Feb 2027 · 2 months
    Reference
    ocds-h6vhtk-06d0ad
  5. Ends · in 124 days

    Refurbishment works for Roxeth Library (South Harrow)

    London Borough of Harrow · Local authority · Greater London

    Incumbent: FG LIBRARY PRODUCTS LIMITED

    Procurement of a contractor to refurbish Roxeth Library in South Harrow. Works to be completed are as detailed in the specification of works and include shelving, furnishings, fixtures and equipment. The aim of the refurbishment is to trans…

    Published value
    £110k
    Annual run-rate
    —term under 6 months
    Term
    7 Dec 2026 → 28 Feb 2027 · 3 months
    Reference
    ocds-h6vhtk-077e2f
  6. Ends · in 124 days

    Supply, delivery and installation of 3 pods for A floor Joseph's Well

    Leeds Teaching Hospitals NHS Trust · Central government

    Incumbent: MORRIS & SPOTTISWOOD LIMITED

    Supply, delivery and installation of 3 pods for A floor Joseph's Well including desktop capsule modules. All as per your quotation Q20251217GGW - 1 dated 19/12/2025.

    Published value
    £40k
    Annual run-rate
    £40kpublished value ÷ term, exc. VAT
    Term
    1 Mar 2026 → 28 Feb 2027 · 1 yr
    Reference
    ocds-h6vhtk-0678bd
  7. Ends · in 124 days

    Brooke House Modular Build

    Surrey and Borders Partnership NHS Foundation Trust · Central government

    Incumbent: Quality Timber Buildings Ltd

    Garden room extension at Brooke House

    Published value
    £37k
    Annual run-rate
    —not computed
    Term
    2 Sept 2026 → 28 Feb 2027 · 6 months
    Reference
    ocds-h6vhtk-077f66
  8. Ends · in 124 days

    CSP27901 - Replication Lab Refurbishment - Design

    UK Research and Innovation · Central government · Nationwide (UK)

    Incumbent: LSG ANGLIA LTD

    ***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded following a limited competition procurement exercise. Brief Description of Requirement:- Replication Lab Refurbishment - Design

    Published value
    £22k
    Annual run-rate
    —term under 6 months
    Term
    1 Oct 2026 → 28 Feb 2027 · 5 months
    Reference
    ocds-h6vhtk-077edf
  9. Ends · in 124 daysExtension option · up to 28 Feb 2029

    UHDB/129/T - Water Testing Services

    University Hospitals of Derby and Burton NHS Foundation Trust · Central government · Nationwide (UK)

    Incumbent: EUROFINS WATER HYGIENE TESTING UK LIMITED

    UHDB/129/T - Water Testing Services to University Hospitals of Derby and Burton NHS Foundation Trust

    Published value
    £100
    Annual run-rate
    £100published value ÷ term, exc. VAT
    Term
    1 Mar 2026 → 28 Feb 2027 · 1 yr · up to 28 Feb 2029 with extensions
    Reference
    ocds-h6vhtk-064c97
  10. Ends · in 125 days

    PAN2766 - Southfield Newry Housing Scheme

    Leicester City Council · Local authority · East Midlands

    Incumbent: GEDA Construction · Last contest: 3 bids (0 SME)

    Contract for the provision of design and construction of the new housing and associated works at the Southfield and Newry site. A summary of what the tenderer is being requested to deliver is as follows: - Completion of the design of the sc…

    • Construction work
    Published value
    £11m
    Annual run-rate
    —start date not published
    Term
    Ends 1 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-046953
  11. Ends · in 125 days

    St Agnes, Pressing

    COASTLINE DESIGN AND BUILD LIMITED · Other public body · South West England

    Incumbent: Classic Builders (South West) Ltd

    Construction of 36 Affordable Homes and associated infrastructure in St Agnes Cornwall

    Published value
    £8.1minc. VAT as published
    Annual run-rate
    £6.0mpublished value ÷ term, inc. VAT
    Term
    27 Oct 2025 → 1 Mar 2027 · 1.3 yrs
    Reference
    ocds-h6vhtk-05ac2a
  12. Ends · in 125 days

    Riversdale Primary School Modular Classroom Replacement

    London Borough of Wandsworth · Local authority

    Incumbent: APC Building Services (London) Ltd

    Demolition of the existing modular buildings and construction of a new 3 classroom building with ancillary services and some landscaping at Riversdale Primary School.

    Published value
    £1.1m
    Annual run-rate
    —not computed
    Term
    1 Sept 2026 → 1 Mar 2027 · 6 months
    Reference
    ocds-h6vhtk-06f9fb
  13. Ends · in 125 days

    NKDC - Solar PV Installations

    North Kesteven District Council · Local authority · East Midlands

    Incumbent: HPC plc

    North Kesteven District Council (NKDC) seeks to enter into a Contract with a suitably qualified Contractor to supply and fit rooftop solar photovoltaic (PVs) systems to the Waste & Street Scene Depot and the seven adjacent industrial units …

    Published value
    £402kinc. VAT as published
    Annual run-rate
    —not computed
    Term
    3 Sept 2026 → 1 Mar 2027 · 6 months
    Reference
    ocds-h6vhtk-06f30f
  14. Ends · in 125 days

    ESCC St Mary's Lift Replacement

    East Sussex County Council · Local authority · South East England

    Incumbent: Unite Lift Services Ltd

    Lift Replacement at St Mary's House

    Published value
    £358k
    Annual run-rate
    —term under 6 months
    Term
    1 Oct 2026 → 1 Mar 2027 · 5 months
    Reference
    ocds-h6vhtk-07754e
  15. Ends · in 125 days

    Fire Alarm System Upgrade

    Cwm Taf Morgannwg University Health Board · Central government · Wales (Cymru)

    Incumbent: Morris Line Engineering Ltd

    Cwm Taf Morgannwg University Health Board (CTMUHB) has direct award a contract directly to Morris Churchfield Fire Ltd for the replacement and upgrade of essential fire alarm systems across multiple Health Board facilities. The works will i…

    Published value
    £299k
    Annual run-rate
    £237kpublished value ÷ term, exc. VAT
    Term
    26 Nov 2025 → 1 Mar 2027 · 1.3 yrs
    Reference
    ocds-h6vhtk-05dbad
  16. Ends · in 125 days

    Henderson Grove - Fire Damage Repair Agreement Based On & Incorporating The Conditionals of Contract of the JCT Intermediate Building Contract 2016

    Stoke on Trent City Council · Local authority

    Incumbent: Hardyman & Co Limited · Last contest: awarded 26% over the estimate

    Stoke-on-Trent City Council's Repairs & Maintenance Services Department (RMS) will be assuming the role of Principal Contractor on this project and intend to appoint a single contractor to carry out the works. RMS will provide all necessary…

    Published value
    £220k
    Annual run-rate
    £381kpublished value ÷ term, exc. VAT
    Term
    3 Aug 2026 → 1 Mar 2027 · 7 months
    Reference
    ocds-h6vhtk-055941
  17. Ends · in 125 days

    Scour Assessment-Protection Shaldon Bridge (00984)

    Devon County Council · Local authority · South West England

    Incumbent: TMS (a12 b1 b7)

    Short-term emergency works where scour has been identified as potentially compromising the integrity of bridge foundations at Shaldon Bridge including beneath the lifting span pier,

    Published value
    £203k
    Annual run-rate
    —term under 6 months
    Term
    29 Sept 2026 → 1 Mar 2027 · 5 months
    Reference
    ocds-h6vhtk-06ee59
  18. Ends · in 125 days

    Electrical Works at the Atriwm Carmarthen

    Carmarthenshire County Council · Local authority · Wales (Cymru)

    Incumbent: F P Hurley

    Carmarthenshire County Council has appointed FP Hurley to carry out electrical works at the Atriwm, Carmarthen.

    Published value
    £120k
    Annual run-rate
    —not computed
    Term
    14 Sept 2026 → 1 Mar 2027 · 6 months
    Reference
    ocds-h6vhtk-078511
  19. Ends · in 125 days

    Plumbing Works NCC - Block 3

    Construction Industry Training Board · Other public body · Nationwide (UK)

    Incumbent: BRUCE TOWERS AND SONS LIMITED

    Plumbing work for bedroom accommodation block 3 refurbishment. (This was a limited-invitation tender, as the requirement necessitated the provision of local support and resources)

    Published value
    £105k
    Annual run-rate
    —term under 6 months
    Term
    9 Nov 2026 → 1 Mar 2027 · 4 months
    Reference
    ocds-h6vhtk-078bf5
  20. Ends · in 125 days

    Queen Elizabeth II Silver Jubilee School

    West Sussex County Council · Local authority

    Incumbent: Managing Property Maintenance Ltd

    Queen Elizabeth II School - King Post Retaining Wall Repairs. Replacement of timber infill to kingpost retaining wall and associated land drainage.

    Published value
    £70k
    Annual run-rate
    £114kpublished value ÷ term, exc. VAT
    Term
    21 Jul 2026 → 1 Mar 2027 · 7 months
    Reference
    ocds-h6vhtk-06cfeb
  21. Ends · in 125 days

    Cladding replacement and repairs at Waitrose car park, Elm Grove

    Uttlesford District Council · Local authority · East of England

    Incumbent: Kirkman and Jourdain Ltd

    Uttlesford District Council seeked quotations for: The replacement of selected areas of external cladding, together with associated repairs and redecoration works at the Waitrose Car Park, Elm Grove, Saffron Walden. The works include remova…

    Published value
    £67k
    Annual run-rate
    —term under 6 months
    Term
    11 Jan 2027 → 1 Mar 2027 · 2 months
    Reference
    ocds-h6vhtk-0777ce
  22. Ends · in 125 daysExtension option

    Adaptations for Disabled Access

    London Borough of Bromley · Local authority · Greater London

    Incumbent: M E HORSTEAD LTD

    Major adaptations for disabled access to a residential property

    Published value
    £43k
    Annual run-rate
    £57kpublished value ÷ term, exc. VAT
    Term
    1 Jun 2026 → 1 Mar 2027 · 9 months
    Reference
    ocds-h6vhtk-06b26b
  23. Ends · in 125 daysExtension option · up to 1 Jan 2030

    DNO electricity grid upgrade for Wallingford CSS

    Oxfordshire County Council · Local authority · South East England

    Incumbent: SOUTHERN ELECTRIC POWER DISTRIBUTION PLC

    DNO electricity grid upgrade for Wallingford CSS. Southern Electric Power Distribution plc.

    Published value
    £31k
    Annual run-rate
    —term under 6 months
    Term
    1 Jan 2027 → 1 Mar 2027 · 2 months · up to 1 Jan 2030 with extensions
    Reference
    ocds-h6vhtk-06cd18
  24. Estimated end · in 126 daysFramework recordPanel · 4 suppliers

    Supply of Kitchen and Bathroom Works

    OXFORD DIRECT SERVICES LIMITED · South East England

    Panel: BELL GROUP LTD, PiLON Ltd, Project Management Services Oxford Ltd +1 more

    • Installation of fitted kitchens
    Published value
    £5.4mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 2 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-04ac17
  25. Estimated end · in 126 days

    Water Hygiene, Legionella and Associated Services

    Accent Group Ltd · North East England, North West England, Yorkshire and the Humber, East Midlands, East of England, South East England

    Incumbent: Integrated Water Services Ltd · Last contest: 11 bids

    To deliver against Accent's portfolio Water Hygiene, Legionella and Associated Services in a timely manner.

    • Water-treatment work
    Published value
    £271k
    Annual run-rate
    —start date not published
    Term
    Estimated end 2 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-02f0c3
  26. Ends · in 126 days

    Voids, Disrepair and Repairs to PAP Out of Borough Properties

    London Borough of Harrow · Local authority · Greater London

    Incumbent: J.C. PROPERTY SERVICES LONDON LTD

    This procurement is for works including disrepair works and repairs, as well as those for Void properties, to PAP Out of Borough properties

    Published value
    £413k
    Annual run-rate
    £207kpublished value ÷ term, exc. VAT
    Term
    3 Mar 2025 → 2 Mar 2027 · 2 yrs
    Reference
    ocds-h6vhtk-052a04
  27. Ends · in 126 daysExtension option · up to 2 Jul 2027

    Health & Safety Concrete Spalling and Make Safe works

    Citizen Housing Group Ltd · Charity · West Midlands

    Incumbent: JPS Projects Limited

    Published value
    £265kinc. VAT as published
    Annual run-rate
    £265kpublished value ÷ term, inc. VAT
    Term
    3 Mar 2026 → 2 Mar 2027 · 1 yr · up to 2 Jul 2027 with extensions
    Reference
    ocds-h6vhtk-05fd2a
  28. Ends · in 126 days

    Magenta Living Retaining Wall Works

    MAGENTA LIVING · Other public body · North West England

    Incumbent: DALE STRUCTURAL REPAIRS LIMITED

    Works at a ML property; retaining wall works. Install of Temp. and Perm. Solutions to failing exterior retaining wall at the property.

    Published value
    £45k
    Annual run-rate
    £45kpublished value ÷ term, exc. VAT
    Term
    2 Mar 2026 → 2 Mar 2027 · 1 yr
    Reference
    ocds-h6vhtk-06155f
  29. Ends · in 126 days

    PN399 Ground works Forrest Lodge

    Sheffield Health Partnership University NHS Foundation Trust · Central government

    Incumbent: J Lee and Son Sheffield

    Emergency ground works to ensure no flooding with added cosmetic changes

    Published value
    £16k
    Annual run-rate
    £16kpublished value ÷ term, exc. VAT
    Term
    5 Mar 2026 → 2 Mar 2027 · 1 yr
    Reference
    ocds-h6vhtk-067c36
  30. Ends · in 127 days

    Renovation of Bathrooms for the British Embassy Moscow

    Foreign, Commonwealth and Development Office · Central government

    Incumbent: Ernesto OOO

    To comply with disability measures as per Disability Act 2010 and FCDO policy renovation of bathrooms are needed.

    Published value
    £37k
    Annual run-rate
    £37kpublished value ÷ term, exc. VAT
    Term
    3 Mar 2026 → 3 Mar 2027 · 1 yr
    Reference
    ocds-h6vhtk-066843
  31. Estimated end · in 128 daysFramework record

    Provision of Core Surfacing 2024- 2027

    Cumberland Council · Local authority · North West England

    Incumbent: DSD Construction Ltd

    The works are anticipated to include delivery of Core Highway Surfacing schemes within the geographical area of Cumberland Council. The schemes will generally involve the maintenance and repair of existing highways including, inlay, overlay…

    • Construction work

    Re-procurement plannedCore Surfacing 2027-2031 · tender expected

    Published value
    £50mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 4 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-042d09
  32. Estimated end · in 128 days

    Waverley Borough Council Repairs, Aids and Adaptations, Void Refurbishment Contract

    Waverley Borough Council · Local authority · South East England

    Incumbent: IAN WILLIAMS · Last contest: 4 bids (0 SME) · awarded at the estimate

    The works include Responsive Repairs, Aids and Adaptations and Void Refurbishment Works to approximately 5,000 properties owned and managed by WBC.Contract commencement in March 2022, and the contract will run for a period of five years wit…

    • Overhaul and refurbishment work
    Published value
    £32m
    Annual run-rate
    —start date not published
    Term
    Estimated end 4 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-0289cf
  33. Estimated end · in 129 daysFramework recordPanel · 9 suppliers

    Retrofit Improvements

    Sedgemoor District Council · Local authority · South West England

    Panel: ESW Construction Services Ltd, Evolve Home Energy Solutions, Healthy Indoor Environments Ltd +6 more

    • Construction work
    Published value
    £12mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 5 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-036017
  34. Ends · in 129 days

    Contractor for a new SEND unit at Waingels College

    Wokingham Borough Council · Local authority

    Incumbent: MORRIS & BLUNT LIMITED

    A contractor is required to construct a new SEND unit at Waingels College, Woodley

    Published value
    £1.3minc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    24 Sept 2026 → 5 Mar 2027 · 5 months
    Reference
    ocds-h6vhtk-078876
  35. Ends · in 129 days

    Afonwen to Chwilog Active Travel - Phase 2

    Cyngor Gwynedd · Other public body · Wales (Cymru)

    Incumbent: G H James cyf · Last contest: awarded 26% under the estimate

    Phase 2 of the Afonwen roundabout to Chwilog Active Travel multi use path.

    Published value
    £446k
    Annual run-rate
    —not computed
    Term
    14 Sept 2026 → 5 Mar 2027 · 6 months
    Reference
    ocds-h6vhtk-06c46f
  36. Ends · in 130 days

    Electricity Connection for West Swindon CDC project Phase 2

    Great Western Hospitals NHS Foundation Trust · Central government

    Incumbent: Scottish & Southern Electricity Networks (SSE)

    Diversion of Low Voltage (LV) electricity supply at West Swindon Health Centre, West Swindon District Centre, Swindon SN5 7DL. Required as enabling works for construction for West Swindon CDC Phase 2 (CT/MRI/NOUS/Audiology) modular build.

    Published value
    £18k
    Annual run-rate
    £18kpublished value ÷ term, exc. VAT
    Term
    6 Mar 2026 → 6 Mar 2027 · 1 yr
    Reference
    ocds-h6vhtk-067a27
  37. Estimated end · in 132 days

    Planned boiler replacement and central heating upgrades to council housing properties

    Runnymede Borough Council · Local authority · South East England

    Incumbent: CLAIRGLOW HEATING LTD · Last contest: 9 bids (8 SME) · awarded at the estimate

    Runnymede Borough Council (‘’the Authority’’) requires work to be undertaken to replace existing aged gas fired central heating boilers and to upgrade existing central heating systems to tenanted domestic properties within its ownership, co…

    • Building installation work
    Published value
    £5.8m
    Annual run-rate
    —start date not published
    Term
    Estimated end 8 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-02e517
  38. Ends · in 132 days

    Wylfa DCS4- Design, Manufacture and Installation of Contamination enclosure

    Nuclear Restoration Services Limited · Other public body

    Incumbent: RUBB BUILDINGS LTD

    Design, Manufacture and Installation of Contamination enclosure at Wylfa Site, Anglesey.

    Published value
    £369kinc. VAT as published
    Annual run-rate
    £720kpublished value ÷ term, inc. VAT
    Term
    3 Sept 2026 → 8 Mar 2027 · 6 months
    Reference
    ocds-h6vhtk-06f1f0
  39. Ends · in 132 days

    PS022-25 Grimsby Town Hall Phase Two Works

    NORTH EAST LINCOLNSHIRE COUNCIL · Local authority · Nationwide (UK), Yorkshire and the Humber

    Incumbent: HOBSON AND PORTER LIMITED · Last contest: awarded 16% under the estimate

    North East Lincolnshire Council are seeking to appoint a suitably qualified and experienced contractor to carry out conservation and refurbishment works to the Grade II listed Grimsby Town Hall. Works include masonry and timber repairs, roo…

    Published value
    £338k
    Annual run-rate
    —term under 6 months
    Term
    2 Nov 2026 → 8 Mar 2027 · 4 months
    Reference
    ocds-h6vhtk-069564
  40. Ends · in 132 daysExtension option · up to 8 Mar 2028

    Lurgan Cemetery Ground Investigation

    Armagh City Banbridge and Craigavon Borough Council · Local authority

    Incumbent: Causeway Geotech Ltd · Last contest: awarded 22% under the estimate

    Intrusive ground investigation works are required across two areas of Lurgan Cemetery, to assess the geotechnical, geo-environmental and groundwater conditions within the two sites in order to aid the design and feasibility of the Lurgan Ce…

    Published value
    £112kinc. VAT as published
    Annual run-rate
    £112kpublished value ÷ term, inc. VAT
    Term
    9 Mar 2026 → 8 Mar 2027 · 1 yr · up to 8 Mar 2028 with extensions
    Reference
    ocds-h6vhtk-05eb4f
  41. Ends · in 132 days

    Design, Construction & Commissioning of Wath Skate Park

    Rotherham Metropolitan Borough Council · Local authority · Yorkshire and the Humber

    Incumbent: Canvas Spaces Limited

    Rotherham Council requires a competent and experienced contractor to design, construct, test and commission an in-situ reinforced concrete skatepark at Wath Skatepark, Wath upon Dearne, Rotherham, S63 7DH.

    Published value
    £107kinc. VAT as published
    Annual run-rate
    —not computed
    Term
    17 Sept 2026 → 8 Mar 2027 · 6 months
    Reference
    ocds-h6vhtk-077447
  42. Estimated end · in 133 days

    Void Property Reinstatement Works

    River Clyde Homes · Scotland

    Incumbent: WrightKerr All Trades Limited · Last contest: 10 bids (5 SME)

    River Clyde Homes are seeking to appoint a highly competent and experienced contractor to undertake the refurbishment of void properties, bring them back to a lettable standard.

    • Joinery work
    Published value
    £3.8m
    Annual run-rate
    —start date not published
    Term
    Estimated end 9 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-04d436
  43. Estimated end · in 133 daysFramework recordPanel · 3 suppliers

    TfGM Ducting and Minor Highway Improvement Works Framework

    Transport for Greater Manchester · North West England

    Panel: George Cox & Sons Limited, Prescott Special Projects Ltd, Rosgal Limited

    • Construction work
    Published value
    £200mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 9 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-03335e
  44. Estimated end · in 133 daysFramework recordPanel · 5 suppliers

    HHP Investment Works Framework 2023 - 2029

    Hebridean Housing Partnership Ltd · Housing · Scotland

    Panel: A Campbell Electrical Services Ltd, Alex Murray (Construction) Ltd, Fes FM Limited +2 more

    • Houses construction work
    Published value
    £14mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 9 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-03623b
  45. Estimated end · in 133 daysFramework record

    DH20046A4 - Roofing - Alvaston Phase 2

    Derby Homes Ltd · East Midlands

    Incumbent: J.A.L ROOFING LIMITED

    Direct Call Off from the Derby Homes Roofing Framework for Roof covering replacement with integrated solar panels.

    • Erection and related works of roof frames and coverings
    Published value
    £1.5mlargest agreement; total ceiling not published
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 9 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-02fe33
  46. Ends · in 133 days

    Museum of Two Halves Project, Wrexham - Enabling and Shell & Core Works Package

    Wrexham County Borough Council · Local authority · Wales (Cymru)

    Incumbent: SWG Construction (Build and Renovate) Ltd · Last contest: 4 bids (4 SME)

    • Building construction work
    Published value
    £5.2m
    Annual run-rate
    £1.9mpublished value ÷ term, exc. VAT
    Term
    20 May 2024 → 9 Mar 2027 · 2.8 yrs
    Reference
    ocds-h6vhtk-040c90
  47. Ends · in 136 days

    A377 Weirmarsh Slip highway stabilisation

    Devon County Council · Local authority · South West England

    Incumbent: BRIDGE Civil Engineering LTD

    Construction of a 50m highway stabilisation retaining wall along the A377. Approx. 23.5m of piled wall with timber parapet and approx. 26.5m of mass concrete wall with masonry parapet and associated highway resurfacing (estimated 970m). Sta…

    Published value
    £1.3minc. VAT as published
    Annual run-rate
    £2.3mpublished value ÷ term, inc. VAT
    Term
    18 Aug 2026 → 12 Mar 2027 · 7 months
    Reference
    ocds-h6vhtk-06e6da
  48. Ends · in 136 days

    Contract for Townhill Phase 2 Re-Roofing and Associated Works

    City & County of Swansea · Local authority · Wales (Cymru)

    Incumbent: M.A. HARTLEY ROOFING CONTRACTORS LTD · Last contest: awarded 32% over the estimate

    Swansea Council intends to carry out Re-Roofing & Associated Works at 42 properties in the Townhill area.

    Published value
    £460k
    Annual run-rate
    £700kpublished value ÷ term, exc. VAT
    Term
    16 Jul 2026 → 12 Mar 2027 · 8 months
    Reference
    ocds-h6vhtk-06733e
  49. Ends · in 136 daysExtension option

    Lift Replacements & Associated Works - Guildhall, Wrexham, LL11 1AY

    Wrexham County Borough Council · Local authority · Wales (Cymru)

    Incumbent: Axel-Elex Ltd T/A Curti Lifts · Last contest: awarded 43% over the estimate

    Wrexham County Borough Council (WCBC) has awarded a sole Contractor to replace up to three passenger lifts at the Guildhall, Wrexham, LL11 1AY. Initially two lifts will be replaced and subject to available funding within the 2026/27 financi…

    Published value
    £315k
    Annual run-rate
    —term under 6 months
    Term
    19 Oct 2026 → 12 Mar 2027 · 5 months
    Reference
    ocds-h6vhtk-065a0b
  50. Ends · in 136 days

    NDC0078-26 - Decarbonisation Works at Brynsworthy Environment Centre (BEC)

    North Devon District Council · Local authority · South West England

    Incumbent: RENDESCO LIMITED · Last contest: awarded 1% over the estimate

    Replacement of the existing heat generation equipment and associated works at Brynsworthy Environment Centre.

    Published value
    £211k
    Annual run-rate
    £237kpublished value ÷ term, exc. VAT
    Term
    22 Apr 2026 → 12 Mar 2027 · 11 months
    Reference
    ocds-h6vhtk-064d39
  51. Ends · in 136 days

    Retail shop refit - Tintern Abbey and Raglan Castle

    Llywodraeth Cymru / Welsh Government · Central government · Wales (Cymru)

    Incumbent: ARJ CRE8 Ltd

    This notice confirms the award of a contract following a competitive quotation exercise for the design, supply and installation of retail shop refurbishment works at Cadw’s Raglan Castle and Tintern Abbey gift shops. The contract includes t…

    Published value
    £182k
    Annual run-rate
    —term under 6 months
    Term
    12 Oct 2026 → 12 Mar 2027 · 5 months
    Reference
    ocds-h6vhtk-078631
  52. Ends · in 136 days

    CBC-2091-Q-SM New replacement "Exit Doors"

    Central Bedfordshire Council · Local authority

    Incumbent: RID Ltd

    Central Bedfordshire Council has awarded a contract for the supply and installation of new exit doors across two Council sites. Works will be undertaken on an as-and-when-required basis during the contract term and will include site surveys…

    Published value
    £60k
    Annual run-rate
    —not computed
    Term
    14 Sept 2026 → 12 Mar 2027 · 6 months
    Reference
    ocds-h6vhtk-06f7f3
  53. Ends · in 137 days

    Infrastructure Development Agreement Faverdale/Burtree Garden Village

    Darlington Borough Council · Local authority · North East England

    Incumbent: Homes England

    Infrastructure Development Agreement Faverdale/Burtree Garden Village

    Published value
    £1.4m
    Annual run-rate
    £725kpublished value ÷ term, exc. VAT
    Term
    14 Mar 2025 → 13 Mar 2027 · 2 yrs
    Reference
    ocds-h6vhtk-0682a8
  54. Ends · in 137 daysExtension option · up to 13 Mar 2028

    Monmouth Shire Hall - EFO - H26-0201

    Monmouthshire County Council · Local authority · Wales (Cymru)

    Incumbent: The Hub Build Limited · Last contest: awarded 20% over the estimate

    The Monmouth Shire Hall Exhibition Works project aims to deliver an engaging, interactive visitor experience through a series of interpretive exhibits. This initiative is part of a broader heritage interpretation strategy led by Monmouthshi…

    Published value
    £745k
    Annual run-rate
    £743kpublished value ÷ term, exc. VAT
    Term
    13 Mar 2026 → 13 Mar 2027 · 1 yr · up to 13 Mar 2028 with extensions
    Reference
    ocds-h6vhtk-05eff1
  55. Estimated end · in 138 days

    Water System Risk Assessments & Water Hygiene Monitoring

    City of Bradford Metropolitan District Council · Local authority · Yorkshire and the Humber

    Incumbent: Aquatrust Water and Ventilation Ltd · Last contest: 6 bids

    The Council was seeking tenders from suitably qualified Water Hygiene contractors to provide the prevention, risk management and control of Legionella bacteria in water systems. This requires the undertaking of a monitoring programme of all…

    • Water-treatment work
    Published value
    £900k
    Annual run-rate
    —start date not published
    Term
    Estimated end 14 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-0416b4
  56. Estimated end · in 138 days

    BSH/HRA Barton Hill Major Refurbishment

    Bristol City Council · Local authority · South West England

    Incumbent: SERS Energy Solutions Limited · Last contest: 3 bids

    Barton Hill Major Refurbishment

    • Construction work
    Published value
    £18m
    Annual run-rate
    —start date not published
    Term
    Estimated end 14 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-03a177
  57. Ends · in 138 days

    Doncaster Future Parks, Grove Gardens

    City of Doncaster Council · Local authority · Yorkshire and the Humber

    Incumbent: BRAMBLEDOWN LANDSCAPES · Last contest: awarded 19% over the estimate

    Delivery of the planned improvements to Grove Gardens green space in Doncaster as set out in this document and associated annexes.

    Published value
    £190k
    Annual run-rate
    £190kpublished value ÷ term, exc. VAT
    Term
    15 Mar 2026 → 14 Mar 2027 · 1 yr
    Reference
    ocds-h6vhtk-060218
  58. Estimated end · in 139 days

    ANDBC Pre-Qualification Questionnaire - Works Contract for Redevelopment of Ward Park, Bangor

    Ards and North Down Borough Council · Local authority · Northern Ireland

    Incumbent: John McQuillan Contracts Ltd · Last contest: 5 bids (4 SME) · awarded 48% under the estimate

    Ward Park is an existing park situated off Castle Street, Bangor. It is owned and managed by Ards and North Down Borough Council. The project is for the provision of restoration and improvement works to the Park. The Park will be updated to…

    • Works for complete or part construction and civil engineering work
    Published value
    £2.3m
    Annual run-rate
    —start date not published
    Term
    Estimated end 15 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-04b08a
  59. Ends · in 139 days

    GSMD Cyclical Works 2026 - 2027

    The Mayor and Commonalty and Citizens of the City of London · Local authority · Greater London

    Incumbent: Team Project Ltd

    The City of London Corporation (the City) invited Tenders for a single‑supplier framework for the provision of a principal contractor to deliver years  2 - 5 of the five‑year cyclical works programme (CWP) for the Guildhall School of Music …

    Published value
    £2.1m
    Annual run-rate
    £3.6mpublished value ÷ term, exc. VAT
    Term
    18 Aug 2026 → 15 Mar 2027 · 7 months
    Reference
    ocds-h6vhtk-06ed76
  60. Ends · in 139 daysExtension option

    Design and Build Works for Mains Sewer Connection at High Lodge

    Forestry Commission · Other public body · East of England

    Incumbent: ARTHUR CIVIL ENGINEERING LIMITED · Last contest: awarded 7% over the estimate

    Connection of High Lodge Forest Centre to the mains sewer, approximately 2.4 km from the current discharge point. A Section 106 agreement with Anglian Water is already in place, and a preferred route for the connection has been identified.

    Published value
    £1.1m
    Annual run-rate
    —not computed
    Term
    16 Sept 2026 → 15 Mar 2027 · 6 months
    Reference
    ocds-h6vhtk-0661b3
  61. Ends · in 139 days

    Specialist Ventilation Installation and Modification Works

    West Suffolk NHS Foundation Trust · Central government

    Incumbent: DPL Group Ltd

    Provision of specialist ventilation works within Theatre 7 and Theatre 9, including the modification, installation, testing and commissioning of ventilation and associated mechanical building services systems. The works support the Trust in…

    Published value
    £350k
    Annual run-rate
    £351kpublished value ÷ term, exc. VAT
    Term
    16 Mar 2026 → 15 Mar 2027 · 1 yr
    Reference
    ocds-h6vhtk-06dd79
  62. Ends · in 139 days

    MFF167 2025-2028 Moorland Restoration Ground Works Package 4 Westend Head Swains Greave Planting Works

    Peak District National Park Authority · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands

    Incumbent: UPLAND ENVIRONMENTAL LTD

    1.The objective of this Contract is to deliver a suite of Moorland Restoration Works on 2 areas in the Upper Derwent Valley in the Peak District National Park. The sites are split into 6 packages of Works. The aim of the Works suites are to…

    Published value
    £113k
    Annual run-rate
    £136kpublished value ÷ term, exc. VAT
    Term
    18 May 2026 → 15 Mar 2027 · 10 months
    Reference
    ocds-h6vhtk-05594f
  63. Ends · in 139 days

    Lot 1

    Peak District National Park Authority · Other public body · Yorkshire and the Humber

    Incumbent: N66 LTD

    Published value
    £70k
    Annual run-rate
    £67kpublished value ÷ term, exc. VAT
    Term
    3 Mar 2026 → 15 Mar 2027 · 1 yr
    Reference
    ocds-h6vhtk-05ea49
  64. Ends · in 139 days

    Bathroom Look Repair

    North East London NHS Foundation Trust · Central government · Nationwide (UK)

    Incumbent: Mosaic Property Management Ltd

    PO to rectify leak issues in female changing room - remove and replace flooring/insulation and hygiene boards in the female changing rooms

    Published value
    £17k
    Annual run-rate
    £17kpublished value ÷ term, exc. VAT
    Term
    16 Mar 2026 → 15 Mar 2027 · 1 yr
    Reference
    ocds-h6vhtk-066fcd
  65. Ends · in 141 daysExtension option

    Ironworks Roof Project

    Victoria and Albert Museum · Central government · Greater London

    Incumbent: Coniston Limited

    Roof refurbishment works at V&A South Kensington. Scope comprises the strip-out and disposal of existing water damaged insulation and asphalt roof covering and replacement to the Ironworks Roof area with new, alongside structural investigat…

    Published value
    £1.6m
    Annual run-rate
    —term under 6 months
    Term
    7 Oct 2026 → 17 Mar 2027 · 5 months
    Reference
    ocds-h6vhtk-0786de
  66. Ends · in 141 days

    Gas Appliance, Central Heating, Electrical, Plumbing and Drainage and Landlord Gas Safety Certificate (CP12)

    Golden Lane Housing Limited · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: British Gas Services Limited

    Gas Appliance, Central Heating, Electrical, Plumbing and Drainage and Landlord Gas Safety Certificate (CP12). This is a direct award following a single quotation exercise.

    Published value
    £483k
    Annual run-rate
    £484kpublished value ÷ term, exc. VAT
    Term
    18 Mar 2026 → 17 Mar 2027 · 1 yr
    Reference
    ocds-h6vhtk-0667e7
  67. Ends · in 142 days

    275 Mare Street AHU replacement work

    London Borough of Hackney · Local authority · Greater London

    Incumbent: FULL WORKS PROJECTS LIMITED

    Provision of the Contractor for 275 Mare Street AHU replacement work.

    Published value
    £35k
    Annual run-rate
    £23kpublished value ÷ term, exc. VAT
    Term
    18 Sept 2025 → 18 Mar 2027 · 1.5 yrs
    Reference
    ocds-h6vhtk-060068
  68. Estimated end · in 143 days

    Surface Treatment Contract 2024 - 2030

    Westmorland and Furness Council · Local authority · North West England

    Incumbent: KIELY BROS LTD · Last contest: 1 bid · awarded at the estimate

    The Services to be delivered under this contract are capital highway maintenance works to repair worn out carriageway. Primary works will include surface dressing, micro asphalt, asphalt preservation, high friction surfacing work and footwa…

    • Construction, foundation and surface works for highways, roads
    Published value
    £40m
    Annual run-rate
    —start date not published
    Term
    Estimated end 19 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-041742
  69. Estimated end · in 143 daysFramework recordPanel · 6 suppliers

    TRG Lift framework (Commercial & Domestic)

    The Riverside Group · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Panel: AMMCASS CONSTRUCTION ENGINEERING GROUP LIMITED, Axel-Elex Ltd T/A Curti Lifts, Concept Elevators (UK) Ltd +3 more

    • Lift installation work
    Published value
    £5.4mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 19 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-0357e3
  70. Estimated end · in 143 days

    Ditching and Dyking

    City of Doncaster Council · Local authority · Yorkshire and the Humber

    Incumbent: RIVER STEWARDSHIP COMPANY LIMITED · Last contest: 7 bids

    Ditching or associated works with a watercourse, dyke, or highway ditch where required. This contract has the available option of being extended for up to a further 4 years at the sole discretion of the council. This contract has a possible…

    • Works for complete or part construction and civil engineering work
    Published value
    £180k
    Annual run-rate
    —start date not published
    Term
    Estimated end 19 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-042976
  71. Ends · in 143 days

    World Museum Horseshoe Refurbishment

    National Museums Liverpool · Central government · North West England

    Incumbent: F Parkinson Ltd

    Reinstatement of plaster ceilings within the Horseshoe Gallery together with redecoration and alterations to the mechanical and electrical installations. Roofing works and repointing works at roof level above the Horseshoe Gallery. The work…

    Published value
    £1.2m
    Annual run-rate
    —term under 6 months
    Term
    13 Oct 2026 → 19 Mar 2027 · 5 months
    Reference
    ocds-h6vhtk-0786bc
  72. Ends · in 143 days

    Minor Refurbishment of North Rona Lighthouse

    Northern Lighthouse Board · Central government · Scotland

    Incumbent: Trac HLM Ltd · Last contest: awarded 17% under the estimate

    The Site North Rona Lighthouse is situated on a remote island that lies 71 kilometres (44 mi) northeast of Butt of Lewis and 16 km (10 miles) east of Sula Sgeir. More isolated than St Kilda, it is the remotest island in the British Isles to…

    Published value
    £125k
    Annual run-rate
    —not computed
    Term
    30 Sept 2026 → 19 Mar 2027 · 6 months
    Reference
    ocds-h6vhtk-06b67f
  73. Ends · in 143 days

    New Stowey Farm - boundary fencing (2026)

    Somerset Council · Local authority · South West England

    Incumbent: S Date Fencing

    To remove 2,170m existing derelict stock fencing and replace with new post & wire fencing. Install 5 no's new field fates including new hanging and banging posts. Install 2 sections of approx 10m post & rail fencing to tie in existing fence…

    Published value
    £34k
    Annual run-rate
    —not computed
    Term
    21 Sept 2026 → 19 Mar 2027 · 6 months
    Reference
    ocds-h6vhtk-06f7fb
  74. Estimated end · in 144 daysCall-offPanel · 3 suppliers

    Lot 11 - Main Contractors Low Rise Housing and Apartments up to 11m – 0 - 9 Units

    LHC Procurement Group Limited for the Welsh Procurement Alliance (WPA) · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Panel: Beattie Passive Operations Ltd, Stelling Properties Limited, ZED PODS LIMITED · Last contest: 14 bids (12 SME)

    This framework covers the geographical area of Wales and has been procured on behalf of the Welsh Procurement Alliance (WPA) This framework is the successor to our popular Offsite Construction of New Homes Framework - NH2 and will be for th…

    • Construction work
    Published value
    £100mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 20 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-03130f
  75. Estimated end · in 144 days

    Core Surfacing in Westmorland and Furness for 2024-2027 (with the option of 3 X 1 year extensions)

    Westmorland and Furness Council · Local authority · North West England

    Incumbent: Hanson Quarry Products Europe Ltd · Last contest: 4 bids · awarded at the estimate

    The Council requires a single supplier to provide services anticipated to include delivery of Core Highway Surfacing schemes within the Westmorland and Furness Council area. The schemes will generally involve the maintenance and repair of e…

    • Construction, foundation and surface works for highways, roads
    Published value
    £60m
    Annual run-rate
    —start date not published
    Term
    Estimated end 20 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-041e34
  76. Estimated end · in 144 daysFramework recordPanel · 15 suppliers

    Structures Framework 2024

    Argyll and Bute Council · Local authority · Scotland

    Panel: Amalgamated Construction Ltd, Bottom Groundworks, Cairn Construction Ltd +12 more

    • Engineering works and construction works
    Published value
    £866klargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 20 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-0478f4
  77. Estimated end · in 144 daysFramework record

    RAD/147 – COMPETITIVE LAND, DESIGN AND BUILD FRAMEWORK IN ANTRIM ROAD AREA

    Radius Housing · Northern Ireland

    Incumbent: O'HANLON BROS. CONSTRUCTION LTD

    • Construction work
    Published value
    £1published ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 20 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-04c643
  78. Ends · in 144 days

    181121 Elgin Town Hall Main Contractor

    Moray Council · Local authority · Scotland

    Incumbent: Taylor and Fraser · Last contest: 2 bids (1 SME)

    Moray Council is leading the redevelopment of the ‘Grade B listed’ Elgin Town Hall and forms part of the overarching Cultural Quarter project. The building is currently a thriving multi-use venue which hosts community events and touring act…

    • Construction work for buildings relating to leisure, sports, culture, lodging and restaurants
    Published value
    £15m
    Annual run-rate
    —start date not published
    Term
    Ends 20 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-04c31c
  79. Ends · in 144 days

    St Charles Roof Replacement

    NHS Property Services Limited · NHS & health

    Incumbent: Petric Contracts Ltd

    Replacement of roof at St Charles Hospital

    Published value
    £3.1m
    Annual run-rate
    £3.2mpublished value ÷ term, exc. VAT
    Term
    6 Apr 2026 → 20 Mar 2027 · 11 months
    Reference
    ocds-h6vhtk-060ba6
  80. Ends · in 144 days

    High Voltage Upgrade

    United Lincolnshire Teaching Hospitals NHS Trust · Central government

    Incumbent: National Grid

    As above - formal HV upgrade to Grantham and District Hospital

    Published value
    £1.1m
    Annual run-rate
    £1.1mpublished value ÷ term, exc. VAT
    Term
    20 Mar 2026 → 20 Mar 2027 · 1 yr
    Reference
    ocds-h6vhtk-06990f
  81. Ends · in 144 days

    Castlefield Viaduct – Enabling Works

    National Highways Limited · Central government

    Incumbent: Amalgamated Construction Ltd (a1 a2 a3 a4 a5 a6 a7 a8 a9 a10 a11)

    Enabling works at Castlefield Viaduct, Manchester, to support Phase 2 of the public access and greenspace scheme being delivered with the National Trust. The works comprise site investigation, clearance of drainage channels and a full tacti…

    Published value
    £425k
    Annual run-rate
    £424kpublished value ÷ term, exc. VAT
    Term
    20 Mar 2026 → 20 Mar 2027 · 1 yr
    Reference
    ocds-h6vhtk-078a36
  82. Estimated end · in 145 daysFramework recordPanel · 3 suppliers

    CE-34-23- Framework Agreement for External Fabric Upgrade Works

    South Ayrshire Council · Local authority · Scotland

    Panel: Ailsa Building Contractors Ltd, GMG Contractors Ltd, Hugh LS McConnell

    • Construction work for multi-dwelling buildings and individual houses
    Published value
    £11mlargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 21 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-045a28
  83. Ends · in 145 days

    Micro Asphalt Surfacing

    Stockton on Tees Borough Council · Local authority · North East England

    Incumbent: Colas Limited

    Micro asphalt surfacing is a critical element of the Council's preventative highway maintenance programme. It is a cost-effective treatment that helps extend pavement life, improve skid resistance, seal the carriageway against water ingress…

    Published value
    £140k
    Annual run-rate
    —not computed
    Term
    21 Sept 2026 → 21 Mar 2027 · 6 months
    Reference
    ocds-h6vhtk-07885d
  84. Ends · in 145 days

    Lizard Bridge and boardwalk replacement

    NATURAL ENGLAND (Defra Network eTendering Portal) · Central government · South West England

    Incumbent: Naturally Green · Last contest: awarded 10% under the estimate

    Total replacement of an old bridge and boardwalk on the Lizard NNR to provide safe access to trails and footpaths

    Published value
    £40k
    Annual run-rate
    £76kpublished value ÷ term, exc. VAT
    Term
    8 Sept 2026 → 21 Mar 2027 · 6 months
    Reference
    ocds-h6vhtk-06d8d6
  85. Estimated end · in 146 days

    17 New Housing Units, Dores, Inverness

    The Highland Council · Local authority · Scotland

    Incumbent: Simpson Builders · Last contest: 7 bids (7 SME)

    17 New Housing Units at Dores Inverness

    • Construction work
    Published value
    £4.0m
    Annual run-rate
    —start date not published
    Term
    Estimated end 22 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-05fb7a
  86. Estimated end · in 146 days

    Design, Supply and Install of a Materials Recovery Facility (MRF)

    Glasgow City Council · Local authority · Scotland

    Incumbent: Turmec Limited · Last contest: 6 bids (4 SME)

    Procurement for the design, supply and install of a Materials Recovery Facility (MRF) as part of the planned re-development of Glasgow City Council's Easter Queenslie property at 90 Easter Queenslie Road Glasgow G33 4UL.

    • Waste-treatment plant construction work
    Published value
    £15m
    Annual run-rate
    —start date not published
    Term
    Estimated end 22 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-040d2f
  87. Estimated end · in 146 days

    Lot 1 - South - South Down Area

    Northern Ireland Housing Executive · Northern Ireland

    Incumbent: HETHERINGTON PAINTING BUILDING · Last contest: 11 bids (1 SME)

    • Construction work
    Published value
    £3.5m
    Annual run-rate
    —start date not published
    Term
    Estimated end 22 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-04dbb6
  88. Ends · in 146 days

    External Wall Remediation Press Court

    Southern Housing · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: AMBER CONSTRUCTION GROUP LTD

    External wall remediation at Press Court

    Published value
    £3.8minc. VAT as published
    Annual run-rate
    £3.3mpublished value ÷ term, inc. VAT
    Term
    4 Feb 2026 → 22 Mar 2027 · 1.2 yrs
    Reference
    ocds-h6vhtk-06561c
  89. Ends · in 146 days

    External wall remediation works at Press Court

    Southern Housing · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: AMBER CONSTRUCTION GROUP LTD

    External wall remediation works at Press Court estate

    Published value
    £3.1m
    Annual run-rate
    £2.9mpublished value ÷ term, exc. VAT
    Term
    22 Feb 2026 → 22 Mar 2027 · 1.1 yrs
    Reference
    ocds-h6vhtk-064dd4
  90. Ends · in 146 days

    Mulberry Environmental Works

    Vico Homes · Other public body · Yorkshire and the Humber

    Incumbent: JPW YORKSHIRE LIMITED

    Vico Homes Ltd invites bids from organisations capable of delivering full-service Environmental works including but not limited to, driveways, fencing, soft landscaping and other associated works at Mulberry Place. The successful contractor…

    Published value
    £1.2minc. VAT as published
    Annual run-rate
    £1.5mpublished value ÷ term, inc. VAT
    Term
    15 Jun 2026 → 22 Mar 2027 · 9 months
    Reference
    ocds-h6vhtk-06a3cf
  91. Ends · in 146 days

    NCC1109 Berwick Maltings Theatre Main Contractor

    Northumberland County Council · Local authority · North East England

    Incumbent: WILLMOTT DIXON LIMITED · Last contest: 2 bids

    Northumberland County Council (NCC) conducted a procurement exercise to appoint a main contractor to carry out the works at The Berwick Maltings Theatre. Project Aims: • Provide a landmark cultural attraction at the heart of the town, creat…

    • Construction work
    Published value
    £884k
    Annual run-rate
    —start date not published
    Term
    Ends 22 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-04d698
  92. Ends · in 146 days

    BAS - Rothera Fire Alarm Upgrade

    UK Research and Innovation · Central government

    Incumbent: G & A Barnie Group Ltd.

    UKRI has appointed a supplier for the Rothera Fire Alarm Upgrade.

    Published value
    £468k
    Annual run-rate
    —not computed
    Term
    28 Sept 2026 → 22 Mar 2027 · 6 months
    Reference
    ocds-h6vhtk-07771a
  93. Ends · in 146 days

    DFG commission service Schedule of Works

    London Borough of Hackney · Local authority · Greater London

    Incumbent: UK Adaptations

    Hackney Council (“the Authority”) is seeking Quotations for the supply of a specialist service to carry out a key element of the Disabled Facilities Grant (DFG) adaptation process for the new DFG Home Adaptations Service under Adult Social …

    Published value
    £96k
    Annual run-rate
    £96kpublished value ÷ term, exc. VAT
    Term
    23 Mar 2026 → 22 Mar 2027 · 1 yr
    Reference
    ocds-h6vhtk-068bf4
  94. Ends · in 146 daysExtension option · up to 20 Aug 2030

    Witney Resource Centre Grid Upgrade

    Oxfordshire County Council · Local authority · South East England

    Incumbent: SOUTHERN ELECTRIC POWER DISTRIBUTION PLC

    Witney Resource Centre Grid Upgrade Moorland Road

    Published value
    £89k
    Annual run-rate
    £152kpublished value ÷ term, exc. VAT
    Term
    20 Aug 2026 → 22 Mar 2027 · 7 months · up to 20 Aug 2030 with extensions
    Reference
    ocds-h6vhtk-078395
  95. Estimated end · in 147 days

    Drainage

    Wolverhampton City Council · Local authority · West Midlands

    Incumbent: Draintech Services (Midlands) Limited · Last contest: 6 bids (6 SME) · awarded at the estimate

    This contract will be to provide a drainage and a civils service to complement the in-house repairs and maintenance service in and outside of normal working hours to residential properties within the Wolverhampton area on behalf of Wolverha…

    • Drainage works
    Published value
    £1.6m
    Annual run-rate
    —start date not published
    Term
    Estimated end 23 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-0391f9
  96. Ends · in 147 daysExtension option · up to 23 Mar 2028

    Marjorie Waite Court Floor Finishes

    City of York Council · Local authority · Yorkshire and the Humber

    Incumbent: TECHCON FLOORING SERVICES LIMITED

    A number of carpets in high traffic communal areas at Marjorie Waite Court have become heavily soiled and stained. The carpets in question are now beyond cleaning and need to be replaced with a more durable and easier to clean alternative, …

    Published value
    £30k
    Annual run-rate
    £30kpublished value ÷ term, exc. VAT
    Term
    23 Mar 2026 → 23 Mar 2027 · 1 yr · up to 23 Mar 2028 with extensions
    Reference
    ocds-h6vhtk-066ae4
  97. Estimated end · in 148 days

    Supply & Installation of Floor Coverings

    Midland Heart · West Midlands

    Incumbent: Stebro Flooring Company Ltd · Last contest: 5 bids (2 SME) · awarded 14% under the estimate

    Midland Heart are seeking bids from fully experienced providers who are trained and capable in the replacement of domestic and commercial flooring and associated works. The winning contractors’ operatives are required to be skilled and trai…

    • Floor laying and covering work
    Published value
    £3.0m
    Annual run-rate
    —start date not published
    Term
    Estimated end 24 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-04b20d
  98. Estimated end · in 148 daysFramework recordPanel · 6 suppliers

    Framework Agreement for Reactive Maintenance Works

    City & County of Swansea · Local authority · Wales (Cymru)

    Panel: ASW Property Services Limited, CARDO (WALES & WEST) LIMITED, M Delacey & Sons (Holdings) Ltd +3 more

    • Construction work
    Published value
    £0largest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 24 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-04b2ee
  99. Ends · in 148 daysExtension option · up to 2 Apr 2027

    Surveying and Design

    Medway NHS Foundation Trust · Central government · Nationwide (UK)

    Incumbent: Harmony Fire Ltd

    Surveying and Design Purchase order:270003404

    Published value
    £389k
    Annual run-rate
    £532kpublished value ÷ term, exc. VAT
    Term
    1 Jul 2026 → 24 Mar 2027 · 9 months · up to 2 Apr 2027 with extensions
    Reference
    ocds-h6vhtk-06cd77
  100. Estimated end · in 150 daysFramework recordPanel · 9 suppliers

    Framework Agreement for Mechanical and Associated Works 2023-2025 (2027) for works up to a value of £500,000

    Wigan Council · Local authority · North West England

    Panel: CPL Heating & Plumbing Ltd, DFP Services Ltd, EE Thompson and Son Ltd (Thompson Building Services Engineers) +6 more

    • Boiler installation work
    Published value
    £10mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 26 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-038c20

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months922
  2. 3–6 months574
  3. 6–12 months591
  4. 12–24 months729

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.