Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 166–180
- Estimated end · in 237 daysFramework recordPanel · 3 suppliers
Framework Agreement for the Hire of Skips inclusive of supply, haulage and disposal of all controlled waste
City & County of Swansea · Local authority · Wales (Cymru)
Panel: DERWEN RECYCLING LIMITED, Gwyr Skips, Stiens Ltd
- Published value
- £1.8mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 21 Jun 2027 · start not published
- Reference
ocds-h6vhtk-04ce3b
- Ends · in 240 days
Manufacture and supply of Culvert & Wing Walls
Leicestershire County Council · Local authority · Nationwide (UK)
Incumbent: BANAGHER PRECAST CONCRETE LIMITED
Leicestershire County Council are currently replacing a culvert structure located on Earl Shilton Road, near to the village of Thurlaston, Leicestershire. The existing Culvert is in poor condition and requires a full replacement. The new st…
- Published value
- £58k
- Annual run-rate
- £70kpublished value ÷ term, exc. VAT
- Term
- 25 Aug 2026 → 24 Jun 2027 · 10 months
- Reference
ocds-h6vhtk-06c820
- Estimated end · in 242 daysFramework recordPanel · 2 suppliers
Framework for the Supply, Installation and Maintenance of Bus Shelters
West Lothian Council · Local authority · Scotland
Panel: Commutaports Limited, Markon Limited
- Published value
- £320kpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 26 Jun 2027 · start not published
- Reference
ocds-h6vhtk-045956
- Ends · in 244 daysExtension option · up to 28 Jun 2028
Resale of Lenovo X13 Yoga G2 Laptops
Mayor's Office for Policing and Crime · Central government · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: RECONOME TECHNOLOGIES LTD.
Secure processing and resale of surplus MPS IT equipment, comprising of Lenovo ThinkPad X13 Yoga Gen 2 laptops. A fully managed, end‑to‑end service, including secure collection, processing, grading, controlled resale, rebate management, and…
- Published value
- £0
- Annual run-rate
- —not computed
- Term
- 29 Jun 2026 → 28 Jun 2027 · 1 yr · up to 28 Jun 2028 with extensions
- Reference
ocds-h6vhtk-067e44
- Ends · in 246 daysFramework record
Supply and Delivery of Double / Triple Glazed Units and Door / Window Hardware to the Falkirk Council Area
Falkirk Council · Local authority · Scotland
Incumbent: Sealco [ Scotland ] Ltd
- Published value
- £740kpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Ends 30 Jun 2027 · start not published
- Reference
ocds-h6vhtk-03a623
- Ends · in 246 days
Water Neutrality Offsetting Scheme
Moat Homes Limited · Charity · South East England
Incumbent: CONTROL FLOW TECHNOLOGIES GROUP LIMITED
The installation of Control Flow HL2024 products into properties owned by Moat in Stour River catchment area
- Published value
- £242k
- Annual run-rate
- £291kpublished value ÷ term, exc. VAT
- Term
- 1 Sept 2026 → 30 Jun 2027 · 10 months
- Reference
ocds-h6vhtk-06d870
- Ends · in 246 daysExtension option · up to 30 Jun 2028
TH 3459 - Servicing & Maintenance of Stairlifts, Hoists and Domestic Through Floor Lifts
Thrive · Other public body
Incumbent: EMS Lifts Ltd
Thrive Homes are seeking to secure a contract for servicing and maintaining stairlifts, hoists, and domestic through-the-floor lifts. The agreement is for a duration of two years, with an option to extend for a further year, subject to sati…
- Published value
- £180k
- Annual run-rate
- £90kpublished value ÷ term, exc. VAT
- Term
- 1 Jul 2025 → 30 Jun 2027 · 2 yrs · up to 30 Jun 2028 with extensions
- Reference
ocds-h6vhtk-05498b
- Ends · in 246 days
Skip Hire
Halton Borough Council · Local authority · North West England
Incumbent: GSH Waste Recycling Ltd
Provision of skips for Environment Services
- Published value
- £96kinc. VAT as published
- Annual run-rate
- £48kpublished value ÷ term, inc. VAT
- Term
- 1 Jul 2025 → 30 Jun 2027 · 2 yrs
- Reference
ocds-h6vhtk-0586d0
- Ends · in 246 days
AT1201 Stair Lifts
Luton Borough Council · Local authority · East of England
Incumbent: EMS Lifts Ltd · Last contest: 6 bids (6 SME)
Stairlift, Hoist and lifting equipment servicing, supply and maintenance
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Ends 30 Jun 2027 · start not published
- Reference
ocds-h6vhtk-03b539
- Estimated end · in 247 days
Stairlifts
East Ayrshire Council · Local authority · Scotland
Incumbent: Handicare AccessibilityLimited · Last contest: 5 bids (2 SME)
The Council require to establish a contract with a Service Provider(s) in relation to the Supply, Installation and Maintenance of Person Lifting Equipment throughout East Ayrshire over a contract term of 3 years, with 2 one-year extension o…
- Published value
- £354k
- Annual run-rate
- —start date not published
- Term
- Estimated end 1 Jul 2027 · start not published
- Reference
ocds-h6vhtk-043c11
- Estimated end · in 247 days
Ceiling Track Hoists
East Ayrshire Council · Local authority · Scotland
Incumbent: Prism UK Medical Ltd · Last contest: 4 bids (3 SME)
The Council require to establish a contract with a Service Provider(s) in relation to the Supply, Installation and Maintenance of Person Lifting Equipment throughout East Ayrshire over a contract term of 3 years, with 2 one-year extension o…
- Published value
- £35k
- Annual run-rate
- —start date not published
- Term
- Estimated end 1 Jul 2027 · start not published
- Reference
ocds-h6vhtk-043c11
- Estimated end · in 247 days
Servicing, Maintenance and Repair
East Ayrshire Council · Local authority · Scotland
Incumbent: Stannah Lift Services Limited · Last contest: 3 bids (1 SME)
The Council require to establish a contract with a Service Provider(s) in relation to the Supply, Installation and Maintenance of Person Lifting Equipment throughout East Ayrshire over a contract term of 3 years, with 2 one-year extension o…
- Published value
- £33k
- Annual run-rate
- —start date not published
- Term
- Estimated end 1 Jul 2027 · start not published
- Reference
ocds-h6vhtk-043c11
- Estimated end · in 251 daysCall-off
Supply of Asphalts, Concrete and Fill Materials Framework 2023 - 2027
Bournemouth, Christchurch and Poole Council · Local authority · South West England
Incumbent: Avon Material Supplies Ltd · Last contest: 4 bids (3 SME)
Supply of materials for construction works, Asphalt, Concrete, Fill Materials
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 5 Jul 2027 · start not published
- Reference
ocds-h6vhtk-03b0ff
- Estimated end · in 251 daysCall-off
Supply of Asphalts, Concrete and Fill Materials Framework 2023 - 2027
Bournemouth, Christchurch and Poole Council · Local authority · South West England
Incumbent: New Milton Sand and Ballast Ltd · Last contest: 4 bids (3 SME)
Supply of materials for construction works, Asphalt, Concrete, Fill Materials
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 5 Jul 2027 · start not published
- Reference
ocds-h6vhtk-03b0ff
- Estimated end · in 253 days
Procurement of an Autoclave Moulding Facility
University of Bristol · Education · Nationwide (UK), South West England
Incumbent: ASC Process Systems Ltf · Last contest: 2 bids · awarded 5% under the estimate
The University of Bristol has a requirement to procure an autoclave moulding facility, with ports suitable for a variety of instrumentation as well as the addition of resin lines. The facility will be used for thermosetting materials that w…
- Published value
- £334k
- Annual run-rate
- —start date not published
- Term
- Estimated end 7 Jul 2027 · start not published
- Reference
ocds-h6vhtk-038bd4
When contracts end · Construction structures and materials i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
340 contracts and agreements end within 24 months, 506 in total · £105m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.